Section 02103 - Split Rail Fence.doc

DOC document 33 KB Posted

Attached to
GAOA Echo Amphitheatre Rec Site Improvements: Phase II
Solicitation number
127EAX24R0005
Issued by

About this file

This document contains a pre-solicitation notice and project description for request for proposal number 127EAX24R0005. The United States Department of Agriculture Forest Service is seeking proposals for improvements to the Echo Amphitheater Recreation Site located in Carson National Forest, New Mexico. Work includes extending the water distribution system to add a fill station and hydrants, installing underground primary and secondary electric lines including a meter base and panels to service nine campsites, constructing drainage features such as berms and ditches around the campground, improving the campground loop road and campsite surfaces with grading and gravel, installing retaining walls and a drainage pad at ramada day use shelters, placing split rail fencing along the amphitheater path, replacing the information kiosk, and installing campsite units at the nine campsites including the host site. The solicitation will provide full specifications and be posted to SAM.gov on January 31, 2024. The pre-bid site visit is also planned. The project cost is estimated between $500,000 and $1 million. Proposals will only be accepted from 100% small business contractors certified in SAM.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 02103

split rail fence

PART 1 - GENERAL

1.1 SUMMARY

This work shall consist of installing split rail fencing on various intervals along the path leading up to the Amphitheater.

1.2 MEASUREMENT

A. Split rail fencing will be measured per linear foot.

B. The actual quantities will be paid for at the contract unit price for each pay item shown in the Schedule of items. Actual quantities are defined as the actual physical quantity of material needed to accomplish the work outlined in this section to deliver a product that is both safe and acceptable. If construction requires a higher quantity of material than what has been shown in the Schedule of items, contractor shall coordinate with the CO for approval prior to construction and/or purchasing and billing.

PART 2 – PRODUCTS

C. The split rail fencing shall be Treated Western Red Cedar or an approved equal.

D. Concrete for post footings shall be Quikrete High Strength Concrete Mix or an approved equal.

PART 3 – EXECUTION

1.3 split rail fence A. All debris, trees, stumps, roots, and other protruding vegetative material within the area of retaining wall, not DESIGNATED to remain, shall be cleared, grubbed, removed, and disposed of.

B. Contractor shall furnish and install Western Red Cedar Split Rail fencing in accordance with the standard detail on sheet X-19.

C. There are sections along the path where fencing may have a jog due to natural and/or manmade structures along the path. Contractor shall stake out their proposed alignment of the fencing and coordinate with COR for approval prior to construction.

PART 4 – MEASUREMENT & PAYMENT

4.1

MEASUREMENT & PAYMENT

A.

Payment for the split rail fence shall be per linear foot (LF).

B.

Concrete shall be incidental to the pay item for split rail fence.

END OF SECTION 02103