Gaoa dry fork road culvert replacement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140L3624Q0094
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Bureau of Land Management, a civilian federal agency, is seeking construction services to remove an existing set of two corrugated steel pipe culverts and install a single polymer-coated corrugated steel pipe culvert with concrete cutoff walls and riprap splash pads and headwalls on the Dry Fork Road in Phillips County, Montana. The contract will be awarded on a lump sum basis, with detailed technical specifications provided. The solicitation includes a list of required submittals, a wage determination, and various drawings and attachments. Quotes are due by August 29, 2024, and the performance period is 60 days after notice to proceed.

This procurement is set-aside for small business concerns under NAICS code 237310 (Highway, Street, and Bridge Construction) with a $45 million size standard. The estimated price range for the project is between $100,000 and $250,000. The work must be performed between July 15th and November 30th to accommodate wildlife concerns, and includes construction and removal of a temporary detour road.

Notice text

2 versions

Update #2 · Latest ·

The Department of Interior, Bureau of Land Management (BLM), Montana State Office is soliciting quotes for construction activities to remove an existing set of two corrugated steel pipe (CSP) culverts, complete construction staking and install a single CSP culvert with polymer coating inside and out, with step beveled end sections, with concrete cutoff walls, with riprap splash pads, and with riprap headwalls. Work includes required excavation and compacted embankment with road surfacing, and construction and removal of a temporary detour road. Location of the site is in Phillips County, Montana.

Amendment Number 3 incorporates the following information:

1. For informational purposes only, the Government is providing the Site Visit Attendance Records from the organized site visit that the Government held on August 13, 2024, at 9:00 am Mountain Time.

2. The Government is providing the attached talking points that were discussed during the site visit as well as Questions received from interested offerors and the associated Answers provided by the Government.

3. The Contract (onsite) period of performance is extended and adjusted to 17 July 2025 - 15 September 2025.

Update #1 ·

GAOA DRY FORK ROAD CULVERT REPLACEMENT

Files

Show all 13

Notice history

Notice Type Posted
Gaoa dry fork road culvert replacement Award Award Notice
This notice Latest solicitation Solicitation
Gaoa dry fork road culvert replacement Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Custer Gallatin National Forest Ashland and Sioux Road Maintenance Billings, Montana, United States · NAICS 237310 Region 6 - Pacific Northwest Region Total Small Business
AZ BL COLO 7528(1) Burro Creek Road Kingman, Arizona 86401, United States · NAICS 237310 Federal Highway Administration Total Small Business
Hickman Wildlife Water Catchment and Pipe Fence NM · NAICS 238910 New Mexico Region Total Small Business
Bassie spring improvement project NAICS 238990 Nevada Region Total Small Business
Gusg habitat hydro-logic restoration 202 NAICS 237990 Colorado Region Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors