GAOA 4FO SMCG Trail Renovation

Closed Solicitation Posted

Solicitation number
1240LT26Q0027
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Nevada, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Agriculture Forest Service is soliciting bids for the GAOA 4FO SMCG Trail Renovation project (Solicitation Number 1240LT26Q0027), which involves construction of a 6-foot-wide asphalt trail connecting the upper visitor center to the lower Acastus Trail, replacement of a 36-inch corrugated metal pipe culvert, and associated earthwork including clearing, grubbing, excavation, and construction of asphalt resting pads. The contract will be awarded on a firm fixed price basis to the lowest price technically acceptable offeror with acceptable or neutral past performance. Evaluation will be based on price fairness and reasonableness per FAR 12.204, technical acceptability demonstrating capability to meet Statement of Work requirements, and past performance assessment. The solicitation incorporates numerous FAR and AGAR clauses including Buy American requirements, labor standards provisions, and performance and payment bond requirements. Questions must be submitted via email to derrick.dodson@usda.gov by March 31, 2026 at 3:00 PM Mountain Time, and offerors must submit pricing proposals by the same date and hold their prices firm for 90 calendar days from receipt.

This is a 100 percent small business set-aside under NAICS code 238990 with a size standard of $16.50 million, and no incumbent contractor is identified in the solicitation documents. The contract performance period runs 120 calendar days from issuance of the Notice to Proceed, with work scheduled to begin in Summer 2026 and conclude by September 30, 2026. The work is located at the Spring Mountain Visitor Gateway in the Spring Mountain National Recreation Area of the Humboldt-Toiyabe National Forest, approximately 20 miles northwest of Las Vegas, Nevada in Clark County. The project includes a base item with two optional items for expanded trail work, though the specific budget or award value is not disclosed in the available documents. The contractor must comply with Davis-Bacon prevailing wage requirements for Clark County, Nevada, which establish hourly rates ranging from $27.18 to $72.38 depending on the trade classification, and must demonstrate capability to manage site logistics including equipment pressure washing, traffic control planning, and coordination with Forest Service requirements.

Notice text

  1. This project includes construction of an asphalt trail connecting the upper visitor center to the lower Acastus Trail and replacement of 36” cmp.
  2. Earthwork item includes clearing and grubbing, removing asphalt, excavation and embankment. Remove and conserve existing trail material. Grade and prepare native subbase. Existing trail material is to be conserved and used for shouldering and subgrade of resting pads. Shoulder trail slopes at 1:10 (max) with existing compacted trail material. It is the intention that all existing aggregate materials will remain onsite.
  3. Aggregate base shall be 4” depth below asphalt. Asphalt trail shall have 6’ width, 3” depth and 2% cross slope (max).
  4. Aggregate base, asphalt and concrete testing per FP-24.
  5. Resting pads shall be asphalt with 4’ width, 6’ length, 3” depth and 2% cross slope (max) in all directions. Resting pads aggregate base shall be compacted with water.
  6. Concrete curb shall be NDOT Type 5. Spillway to culvert inlet is inclusive to curb. Concrete curb may be placed on compacted aggregate base. Native subbase shall be compacted with water. The grade will be inspected for soft spots and accepted before concrete placement. Backfill to top of curb with native material.
  7.  Corrugated metal pipe item includes submitting a proposed pipe plot for placement of 36” culvert. Design for minimum 5% drop. Removal of existing culvert, inlet stacked rock and outlet riprap are inclusive to new culvert placement.
  8. All work to extend asphalt trail and shoulders is inclusive to the option items

Files

File Type Posted
Solicitation.docx DOCX document
260202 SMVG Trail Plans_DR_Signed_kwsigned.pdf PDF
1240LT26Q0027.pdf PDF
Statement of Work GAOA 4FO SMCG Trail Renovation.docx DOCX document
Wage Determination Clark County Nevada NV20260024.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
GAOA Brainard Lake Recreation Area Deferred Maintenance Ward, Colorado 80481, United States · NAICS 237310 Forest Service Total Small Business
Administrative Parking Lot Repairs Colorado 80526, United States · NAICS 237310 Forest Service Total Small Business
GAOA Pine Creek Vault Toilet HTNF Sparks, Nevada 89431, United States · NAICS 237990 Forest Service Total Small Business
GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF Fifty Six, Arkansas 72533, United States · NAICS 238990 Forest Service Total Small Business
GRSM 321788 - Oconaluftee River Trail NAICS 237310 — No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity