FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, Oklahoma

Closed Solicitation Posted

Solicitation number
W912BV279A001
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Altus Air Force Base, Oklahoma Altus AFB, Oklahoma 73523, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Tulsa District, seeks a design-build team for the FY28 KC-46A Aircraft Beddown Infrastructure Program at Altus Air Force Base, Oklahoma, with Statements of Qualifications due October 13, 2026, and pitch presentations scheduled for October 30, 2026. The procurement is an Other Transaction Agreement under 10 U.S.C. 2808a, not subject to competitive set-aside.

Place of performance is Altus Air Force Base, Altus, Oklahoma. The program is a $235 million consolidated capital initiative delivering three primary facility complexes: an 80,988-square-foot KC-46A Aircraft Maintenance Hangar (general maintenance), a 72,729-square-foot KC-46A Multipurpose Hangar (corrosion control and open-tank fuel cell maintenance), and a 74,325-square-foot KC-46A Simulator Facility Phase 4 (flight training center expansion). Additional scope includes relocation of an aircraft refueler parking area and active Liquid Oxygen facility, demolition of three aging structures, and approximately 165,000 square feet of airfield pavement and taxiway tie-ins. Critical constraints require sustained mission readiness with no interruption to active flight operations, simulator schedules, or flight-line refueling throughout construction.

The NAICS code is 236220, Commercial and Institutional Building Construction; PSC code is Y1BZ, Construction of Other Airfield Structures. The Government intends to award a single OT Agreement but reserves the right to award separate OTAs based on funding and program needs. The competitive selection process is qualifications-based, with the Government targeting down-selection of up to three design-build teams from initial SOQ review to proceed to pitch presentations. One firm will be selected for Phase 1 design and preconstruction services, with Phase 2 (full design and construction) added by modification upon negotiated fair and reasonable fixed-price or guaranteed maximum price.

Design-build teams must be registered in SAM.gov with valid UEI and demonstrate minimum bonding capacity of $300 million for Performance and Payment Bonds. Phase 1 award is anticipated by December 31, 2026. Design 35 percent and pre-design target is March 13, 2027, with construction beginning in Fiscal Year 2028. Cybersecurity requirements equivalent to CMMC Level 1 apply. Congressional authorization and Military Construction appropriations are required before construction activities commence.

Notice text

2 versions

Update #2 · Latest ·

The U.S. Army Corps of Engineers (USACE), Tulsa District is issuing this Request for Qualifications (RFQ) for the design and construction of the FY28 KC-46A Aircraft Beddown Infrastructure Program at Altus Air Force Base, Oklahoma using Progressive Design-Build under 10 USC 2808a Other Transaction Authority. The KC-46A Aircraft Beddown Infrastructure Program at Altus AFB, Oklahoma, will deliver comprehensive flight-line, industrial maintenance, and advanced aircrew flight simulator training facilities necessary to support the 97th Air Mobility Wing (97 AMW) - the sole formal training unit for heavy mobility aircraft for the Department of the Air Force. This $235M consolidated capital program will modernize the infrastructure at the installation to replace Eisenhower-era KC-135 operations with the next-generation KC-46A Pegasus tanker while sustaining concurrent training and maintenance for its legacy fleets. The program will deliver three primary facility complexes along with associated airfield civil site infrastructure: KC-46A Aircraft Maintenance Hangar (General Maintenance); KC-46A Multipurpose Hangar (Corrosion Control and Open-Tank Fuel Cell Maintenance), and KC-46A Simulator Facility Phase 4 (Flight Training Center Expansion)

Update #1 ·

The U.S. Army Corps of Engineers (USACE), Tulsa District is issuing this Request for Qualifications (RFQ) for the design and construction of the FY28 KC-46A Aircraft Beddown Infrastructure Program at Altus Air Force Base, Oklahoma using Progressive Design-Build under 10 USC 2808a Other Transaction Authority.

The KC-46A Aircraft Beddown Infrastructure Program at Altus AFB, Oklahoma, will deliver comprehensive flight-line, industrial maintenance, and advanced aircrew flight simulator training facilities necessary to support the 97th Air Mobility Wing (97 AMW) - the Department of the Air Force’s sole formal training unit for heavy mobility aircraft. This $235M consolidated capital program will modernize the installation's infrastructure to replace Eisenhower-era KC-135 operations with the next-generation KC-46A Pegasus tanker while sustaining concurrent training and maintenance for its legacy fleets.

The program will deliver three primary facility complexes along with associated airfield civil site infrastructure:

  • KC-46A Aircraft Maintenance Hangar (General Maintenance)
  • KC-46A Multipurpose Hangar (Corrosion Control & Open-Tank Fuel Cell Maintenance)
  • KC-46A Simulator Facility Phase 4 (Flight Training Center Expansion)

USACE will use a streamlined competitive selection process to select the most highly qualified design-build team: 

  • Step 1 – Statement of Qualifications: Interested parties will submit a Statement of Qualifications. The Government intends to down-select up to three Design-Build Teams to proceed to Step 2. 
  • Step 2 – Pitch Presentations: Selected Design-Build Teams will participate in pitch meetings. One firm will be selected as the Design-Build team for award of the initial design and preconstruction services with a modification for design completion and construction award. 

The agreement will be awarded to the most qualified design-build team to provide design development, preconstruction services, and construction. Post-award Phase 1 of PDB includes design and pre-construction services and Post-award Phase 2 includes the final design and construction. The agreement will be Firm-Fixed-Price (FFP). The FFP for successive design and construction milestones will be agreed to as the design progresses and funds become available.  

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, OK Special Notice
Market Research/Industry Feedback for potential Progressive Design-Build (PDB)/OTA projects at Altus AFB. Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Sources Sought - Construction Repair Building 6413 Secure Space (511669 & 519580) Barksdale AFB Barksdale AFB, Louisiana 71110, United States · NAICS 236220 ENDIST Fort Worth No set-aside
B-21 Field Training Detachment Facility, Dyess AFB-OT Feasibility & Business Feedback NAICS 236220 ENDIST Fort Worth No set-aside
Child Development Center (CDC), Tinker Air Force Base, Oklahoma NAICS 236220 ENDIST Tulsa No set-aside
F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah Hill Air Force Base, Utah, United States · NAICS 236210 ENDIST Sacramento No set-aside
Tinker AFB 2026 Multiple Award Construction Contract (MACC) Tinker AFB, Oklahoma 73145, United States · NAICS 236210 Air Force Sustainment Center Partial Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity