Market Research/Industry Feedback for potential Progressive Design-Build (PDB)/OTA projects at Altus AFB.

Closed Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
W912BV26SDF02
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
Not on record
PSC
Not on record
Place of performance
Altus AFB, Oklahoma, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Tulsa District, is conducting market research to gather industry feedback on optimal project delivery methods and contracting vehicles for potential Progressive Design-Build and Other Transaction Authority projects at Altus Air Force Base, with responses due by July 23, 2026 at 2:00 PM CST.

The procurement covers four military construction projects: KC46A Simulator Facility Phase 4-a ($28 million, 540-day performance, FY28 award); Aircraft Maintenance Hangar ($99 million, 720-day performance, FY28 award); Multipurpose Hangar ($134 million, 720-day performance, FY28 award); and FY29 Main Gate Entry Control Facility ($21 million, 540-day performance, FY29 award). The combined program value is approximately $280 million. The Government is evaluating three primary delivery approaches: Accelerated Design-Build to Budget under FAR, Construction Manager at Risk under Other Transaction Authority, and Progressive Design-Build under OTA.

Respondents should address company qualifications, experience with PDB and OTA delivery methods, feasibility and risk assessment across design versus single-point responsibility approaches, budget realism and cost drivers, schedule and supply chain risk, collaboration priorities, and overall delivery recommendations. The questionnaire requests ranked preferences, yes/no responses, and narrative explanations addressing constructability, cost certainty, schedule feasibility, and commercial best practices for military facility construction.

Responses must be submitted via email to Daniel Foyil at Daniel.A.Foyil@usace.army.mil. No pricing or formal bids are required at this stage. This market research precedes formal solicitation and will inform acquisition strategy decisions.

Notice text

The Government seeks your expert feedback to select the optimal project delivery method and contracting vehicle (FAR-based or OTA) for various Altus AFB facilities.  Please email your response to Daniel Foyil – Daniel.A.Foyil@usace.army.mil, U.S. Army Corps of Engineers, Tulsa District (CECT-SWT), no later than 2:00PM CST 23 July 2026. (SEE ATTACHED)

Files

File Type Posted
Altus AFB Market Research (3).docx DOCX document
Altus AFB Market Research (2).pdf PDF

Notice history

Notice Type Posted
FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, Oklahoma Latest solicitation Solicitation
FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, OK Special Notice
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Request for Information - Market Intelligence Survey** Use of OTA for E-7 Squad Ops Facility - Tinker AFB, OK Tinker Air Force Base, OK 73145 · NAICS 236220 ENDIST Tulsa No set-aside
Progressive Design-Build (PDB) - RENOVATE HQ AFMC B/10262 PH 2 at WPAFB Wright Patterson AFB, Ohio, United States · NAICS 236220 ENDIST Louisville No set-aside
Progressive Design-Build (PDB) - USSF Integration Facility F/10852 at WPAFB Wright Patterson AFB, Ohio, United States · NAICS 236220 ENDIST Louisville No set-aside
Collaborative Combat Aircraft (CCA) Unit Operations and Hangar Creech AFB, Nevada Progressive Design-Build (PDB) with Other Transaction Authority (OTA) Nevada, United States · NAICS 236220 Department of the Army No set-aside
FLW Renovate 3 SPRC Buildings Fort Leonard Wood, Missouri, United States · NAICS 236220 — No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors