FY26 Installation of New 3-Phase Primary Underground Electrical Service Ellington Field, TX
Closed Solicitation Posted
- Solicitation number
- W50S77-26-Q-A001
- Agency
-
Texas National Guard
Army National Guard, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Place of performance
- Houston, Texas 77034, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Property & Fiscal Office for the Texas Air National Guard seeks installation of new 3-phase primary underground electrical service at Ellington Field Joint Reserve Base in Houston, Texas, with quotes due July 29, 2026. The procurement is a total small business set-aside, restricting competition to firms meeting the small business size standard of $45 million under NAICS 238210.
Place of performance is Ellington Field Joint Reserve Base, 14657 Sneider Street, Houston, Texas 77034. The work entails replacing failed underground primary electrical service between an existing tap box and transformer supplying the mobile shooting range. The contractor must install 4-inch PVC conduit via directional boring, furnish and install three new medium-voltage primary cables rated for 15-kV class service compatible with the existing 12.47 kV distribution system, perform all terminations per manufacturer specifications, and restore all disturbed surfaces to original or better condition. The contractor bears full responsibility for field verification of dimensions, routing, and utility locations through Texas 811 contact, ground-penetrating radar, and potholing; comprehensive pre-installation and post-installation testing per IEEE 400 Series, NETA ATS, and manufacturer specifications; and coordinating all electrical outages with 15 business days' minimum advance written notice. A minimum one-year workmanship warranty and manufacturer warranties are required, along with final as-built documentation.
Contract magnitude is between $25,000.00 and $50,000.00 as a firm-fixed-price purchase order. Period of performance is 60 calendar days after Notice to Proceed. The RFQ is issued under FAR Part 12 commercial acquisition procedures. If the resulting purchase order price exceeds $35,000.00, FAR Clause 52.228-13, Alternative Payment Protections, applies, requiring a payment bond equal to 100 percent of contract price within 10 days of award. Award will be made to the responsible vendor whose quote is most advantageous considering only price and price-related factors. Williams Diversified LLC was awarded Purchase Order W50S77-26-P-A007 in the amount of $47,493.24 on September 22, 2026.
Notice text
8 versions
Update #8 · Latest ·
7/22/26: The following contractor was awarded Purchase Order No. W50S77-26-P-A007 in the amount of $47,493.24 on 22 September 2026 in response to Request for Quotation No. W50S77-26-Q-A001.
Williams Diversified LLC
1913 W. Tacoma Street, Suite A
Broken Arrow, OK 74012
7/23/26: Issued Amendment 0004 to extend the due date to 29 JUL 2026. See attachment to this posting.
7/21/26: Issued Amendment 0003 to add RFO FAR Clause 52.228-13, Alternative Payment Protections; and the following statement to Section 00 00 00 - Procurement and Contracting Requirements - "If the resulting purchase order price exceeds $35,000.00, RFO FAR Clause 52.228-13, Alternative Payment Protections will be effective".
7/16/26: Issued Amendment 0002 to extend the due date to 24 JUL 2026; revise Section 01 00 00 paragraph 24.2; Replace Statement of Work; and incorporate Questions & Answers. See attachments to this posting.
7/9/26: Added the 7/8/26 pre-quote site visit slides and sign in sheet as attachments to this posting.
7/2/26: Issued Amendment 0001 to extend the due date to 17 JUL 2026 and attach Identifier 0002 (2020 Utility Drawings) and Identifier 0003 (2019 Site Photos) in Section 00 01 15. See attachments to this posting.
7/1/26: Added the 7/1/26 pre-quote site visit slides and sign in sheet as attachments to this posting.
Notice ID: W50S77-26-Q-A001
Notice Type: Combined Synopsis/Solicitation
Notice Issue Date: June 25, 2026
Date for Receipt of Responses: July 15, 2026 at 4:00pm CDT
Contracting Office: United States Property & Fiscal Office - Texas Air National Guard
Title: FY26 Installation of New 3-Phase Primary Underground Electrical Service
Project Number: FWJH262710
Location: Ellington Field Joint Reserve Base,14657 Sneider Street, Houston, Texas 77034
Category: N – Installation of Equipment
NAICS: 238210 – Electrical Contractors and Other Wiring Installation
PSC: N061 – Installation of Equipment – Electric Wire and Power Distribution Equipment
Magnitude: Between $25,000.00 - $50,000.00
Set Aside: Total Small Business Set-Aside
Combined Synopsis/Solicitation Number W50S77-26-Q-A001 is issued as a request for quotation (RFQ) for the replacement of the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base, Houston, TX. This project is required to restore reliable electrical service to the mobile shooting range and return the facility to full operational capability in support of training and mission readiness. This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. The Government intends to award a Firm Fixed Price (FFP) purchase order resulting from this RFP to the responsible vendor whose quote conforms to the RFQ and is most advantageous to the Government considering only price and price related factors. Solicitations, information notices, and amendments for this RFQ will be posted at https://sam.gov.
Scope of Work: The project includes all labor, parts, tools, plant, equipment, appliances, transportation, materials, and supervision necessary to replace the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base as specified in the attached Statement of Work. The purchase order duration will be 60 days after notice to proceed to include inspection and punch list.
Pre-Quote Conference/Site Visit: We are offering two sessions of the pre-quote conference and site visit. See the RFQ Section 00 21 00 – Instructions for details.
Due Date: Quotes are due via email to carrie.a.mckay2.civ@army.mil and david.m.best.civ@army.mil by the date and time indicated in block 13 of the RFQ (Standard Form 1442 – Solicitation, Offer, and Award).
Your attention is directed to Revolutionary FAR Overhaul (RFO) clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states; By submission of an offer and execution of a contract (purchase order), the Contractor will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded.
In accordance with RFO FAR 36.101-4, the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at Revolutionary FAR Overhaul (RFO) 43.304, DFARS RFO Deviation 243.304 and AFARS 5143.304. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on https://sam.gov, and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the quoter’s responsibility to check the website periodically for any amendments to the solicitation. The Government will not compensate for costs incurred in preparation of quotes. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a quoter's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Update #7 ·
7/23/26: Issued Amendment 0004 to extend the due date to 29 JUL 2026. See attachment to this posting.
7/21/26: Issued Amendment 0003 to add RFO FAR Clause 52.228-13, Alternative Payment Protections; and the following statement to Section 00 00 00 - Procurement and Contracting Requirements - "If the resulting purchase order price exceeds $35,000.00, RFO FAR Clause 52.228-13, Alternative Payment Protections will be effective".
7/16/26: Issued Amendment 0002 to extend the due date to 24 JUL 2026; revise Section 01 00 00 paragraph 24.2; Replace Statement of Work; and incorporate Questions & Answers. See attachments to this posting.
7/9/26: Added the 7/8/26 pre-quote site visit slides and sign in sheet as attachments to this posting.
7/2/26: Issued Amendment 0001 to extend the due date to 17 JUL 2026 and attach Identifier 0002 (2020 Utility Drawings) and Identifier 0003 (2019 Site Photos) in Section 00 01 15. See attachments to this posting.
7/1/26: Added the 7/1/26 pre-quote site visit slides and sign in sheet as attachments to this posting.
Notice ID: W50S77-26-Q-A001
Notice Type: Combined Synopsis/Solicitation
Notice Issue Date: June 25, 2026
Date for Receipt of Responses: July 15, 2026 at 4:00pm CDT
Contracting Office: United States Property & Fiscal Office - Texas Air National Guard
Title: FY26 Installation of New 3-Phase Primary Underground Electrical Service
Project Number: FWJH262710
Location: Ellington Field Joint Reserve Base,14657 Sneider Street, Houston, Texas 77034
Category: N – Installation of Equipment
NAICS: 238210 – Electrical Contractors and Other Wiring Installation
PSC: N061 – Installation of Equipment – Electric Wire and Power Distribution Equipment
Magnitude: Between $25,000.00 - $50,000.00
Set Aside: Total Small Business Set-Aside
Combined Synopsis/Solicitation Number W50S77-26-Q-A001 is issued as a request for quotation (RFQ) for the replacement of the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base, Houston, TX. This project is required to restore reliable electrical service to the mobile shooting range and return the facility to full operational capability in support of training and mission readiness. This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. The Government intends to award a Firm Fixed Price (FFP) purchase order resulting from this RFP to the responsible vendor whose quote conforms to the RFQ and is most advantageous to the Government considering only price and price related factors. Solicitations, information notices, and amendments for this RFQ will be posted at https://sam.gov.
Scope of Work: The project includes all labor, parts, tools, plant, equipment, appliances, transportation, materials, and supervision necessary to replace the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base as specified in the attached Statement of Work. The purchase order duration will be 60 days after notice to proceed to include inspection and punch list.
Pre-Quote Conference/Site Visit: We are offering two sessions of the pre-quote conference and site visit. See the RFQ Section 00 21 00 – Instructions for details.
Due Date: Quotes are due via email to carrie.a.mckay2.civ@army.mil and david.m.best.civ@army.mil by the date and time indicated in block 13 of the RFQ (Standard Form 1442 – Solicitation, Offer, and Award).
Your attention is directed to Revolutionary FAR Overhaul (RFO) clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states; By submission of an offer and execution of a contract (purchase order), the Contractor will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded.
In accordance with RFO FAR 36.101-4, the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at Revolutionary FAR Overhaul (RFO) 43.304, DFARS RFO Deviation 243.304 and AFARS 5143.304. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on https://sam.gov, and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the quoter’s responsibility to check the website periodically for any amendments to the solicitation. The Government will not compensate for costs incurred in preparation of quotes. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a quoter's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Update #6 ·
7/21/26: Issued Amendment 0003 to add RFO FAR Clause 52.228-13, Alternative Payment Protections; and the following statement to Section 00 00 00 - Procurement and Contracting Requirements - "If the resulting purchase order price exceeds $35,000.00, RFO FAR Clause 52.228-13, Alternative Payment Protections will be effective".
7/16/26: Issued Amendment 0002 to extend the due date to 24 JUL 2026; revise Section 01 00 00 paragraph 24.2; Replace Statement of Work; and incorporate Questions & Answers. See attachments to this posting.
7/9/26: Added the 7/8/26 pre-quote site visit slides and sign in sheet as attachments to this posting.
7/2/26: Issued Amendment 0001 to extend the due date to 17 JUL 2026 and attach Identifier 0002 (2020 Utility Drawings) and Identifier 0003 (2019 Site Photos) in Section 00 01 15. See attachments to this posting.
7/1/26: Added the 7/1/26 pre-quote site visit slides and sign in sheet as attachments to this posting.
Notice ID: W50S77-26-Q-A001
Notice Type: Combined Synopsis/Solicitation
Notice Issue Date: June 25, 2026
Date for Receipt of Responses: July 15, 2026 at 4:00pm CDT
Contracting Office: United States Property & Fiscal Office - Texas Air National Guard
Title: FY26 Installation of New 3-Phase Primary Underground Electrical Service
Project Number: FWJH262710
Location: Ellington Field Joint Reserve Base,14657 Sneider Street, Houston, Texas 77034
Category: N – Installation of Equipment
NAICS: 238210 – Electrical Contractors and Other Wiring Installation
PSC: N061 – Installation of Equipment – Electric Wire and Power Distribution Equipment
Magnitude: Between $25,000.00 - $50,000.00
Set Aside: Total Small Business Set-Aside
Combined Synopsis/Solicitation Number W50S77-26-Q-A001 is issued as a request for quotation (RFQ) for the replacement of the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base, Houston, TX. This project is required to restore reliable electrical service to the mobile shooting range and return the facility to full operational capability in support of training and mission readiness. This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. The Government intends to award a Firm Fixed Price (FFP) purchase order resulting from this RFP to the responsible vendor whose quote conforms to the RFQ and is most advantageous to the Government considering only price and price related factors. Solicitations, information notices, and amendments for this RFQ will be posted at https://sam.gov.
Scope of Work: The project includes all labor, parts, tools, plant, equipment, appliances, transportation, materials, and supervision necessary to replace the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base as specified in the attached Statement of Work. The purchase order duration will be 60 days after notice to proceed to include inspection and punch list.
Pre-Quote Conference/Site Visit: We are offering two sessions of the pre-quote conference and site visit. See the RFQ Section 00 21 00 – Instructions for details.
Due Date: Quotes are due via email to carrie.a.mckay2.civ@army.mil and david.m.best.civ@army.mil by the date and time indicated in block 13 of the RFQ (Standard Form 1442 – Solicitation, Offer, and Award).
Your attention is directed to Revolutionary FAR Overhaul (RFO) clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states; By submission of an offer and execution of a contract (purchase order), the Contractor will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded.
In accordance with RFO FAR 36.101-4, the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at Revolutionary FAR Overhaul (RFO) 43.304, DFARS RFO Deviation 243.304 and AFARS 5143.304. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on https://sam.gov, and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the quoter’s responsibility to check the website periodically for any amendments to the solicitation. The Government will not compensate for costs incurred in preparation of quotes. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a quoter's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Update #5 ·
7/16/26: Issued Amendment 0002 to extend the due date to 24 JUL 2026; revise Section 01 00 00 paragraph 24.2; Replace Statement of Work; and incorporate Questions & Answers. See attachments to this posting.
7/9/26: Added the 7/8/26 pre-quote site visit slides and sign in sheet as attachments to this posting.
7/2/26: Issued Amendment 0001 to extend the due date to 17 JUL 2026 and attach Identifier 0002 (2020 Utility Drawings) and Identifier 0003 (2019 Site Photos) in Section 00 01 15. See attachments to this posting.
7/1/26: Added the 7/1/26 pre-quote site visit slides and sign in sheet as attachments to this posting.
Notice ID: W50S77-26-Q-A001
Notice Type: Combined Synopsis/Solicitation
Notice Issue Date: June 25, 2026
Date for Receipt of Responses: July 15, 2026 at 4:00pm CDT
Contracting Office: United States Property & Fiscal Office - Texas Air National Guard
Title: FY26 Installation of New 3-Phase Primary Underground Electrical Service
Project Number: FWJH262710
Location: Ellington Field Joint Reserve Base,14657 Sneider Street, Houston, Texas 77034
Category: N – Installation of Equipment
NAICS: 238210 – Electrical Contractors and Other Wiring Installation
PSC: N061 – Installation of Equipment – Electric Wire and Power Distribution Equipment
Magnitude: Between $25,000.00 - $50,000.00
Set Aside: Total Small Business Set-Aside
Combined Synopsis/Solicitation Number W50S77-26-Q-A001 is issued as a request for quotation (RFQ) for the replacement of the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base, Houston, TX. This project is required to restore reliable electrical service to the mobile shooting range and return the facility to full operational capability in support of training and mission readiness. This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. The Government intends to award a Firm Fixed Price (FFP) purchase order resulting from this RFP to the responsible vendor whose quote conforms to the RFQ and is most advantageous to the Government considering only price and price related factors. Solicitations, information notices, and amendments for this RFQ will be posted at https://sam.gov.
Scope of Work: The project includes all labor, parts, tools, plant, equipment, appliances, transportation, materials, and supervision necessary to replace the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base as specified in the attached Statement of Work. The purchase order duration will be 60 days after notice to proceed to include inspection and punch list.
Pre-Quote Conference/Site Visit: We are offering two sessions of the pre-quote conference and site visit. See the RFQ Section 00 21 00 – Instructions for details.
Due Date: Quotes are due via email to carrie.a.mckay2.civ@army.mil and david.m.best.civ@army.mil by the date and time indicated in block 13 of the RFQ (Standard Form 1442 – Solicitation, Offer, and Award).
Your attention is directed to Revolutionary FAR Overhaul (RFO) clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states; By submission of an offer and execution of a contract (purchase order), the Contractor will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded.
In accordance with RFO FAR 36.101-4, the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at Revolutionary FAR Overhaul (RFO) 43.304, DFARS RFO Deviation 243.304 and AFARS 5143.304. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on https://sam.gov, and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the quoter’s responsibility to check the website periodically for any amendments to the solicitation. The Government will not compensate for costs incurred in preparation of quotes. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a quoter's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Update #4 ·
7/9/26: Added the 7/8/26 pre-quote site visit slides and sign in sheet as attachments to this posting.
7/2/26: Issued Amendment 0001 to extend the due date to 17 JUL 2026 and attach Identifier 0002 (2020 Utility Drawings) and Identifier 0003 (2019 Site Photos) in Section 00 01 15. See attachments to this posting.
7/1/26: Added the 7/1/26 pre-quote site visit slides and sign in sheet as attachments to this posting.
Notice ID: W50S77-26-Q-A001
Notice Type: Combined Synopsis/Solicitation
Notice Issue Date: June 25, 2026
Date for Receipt of Responses: July 15, 2026 at 4:00pm CDT
Contracting Office: United States Property & Fiscal Office - Texas Air National Guard
Title: FY26 Installation of New 3-Phase Primary Underground Electrical Service
Project Number: FWJH262710
Location: Ellington Field Joint Reserve Base,14657 Sneider Street, Houston, Texas 77034
Category: N – Installation of Equipment
NAICS: 238210 – Electrical Contractors and Other Wiring Installation
PSC: N061 – Installation of Equipment – Electric Wire and Power Distribution Equipment
Magnitude: Between $25,000.00 - $50,000.00
Set Aside: Total Small Business Set-Aside
Combined Synopsis/Solicitation Number W50S77-26-Q-A001 is issued as a request for quotation (RFQ) for the replacement of the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base, Houston, TX. This project is required to restore reliable electrical service to the mobile shooting range and return the facility to full operational capability in support of training and mission readiness. This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. The Government intends to award a Firm Fixed Price (FFP) purchase order resulting from this RFP to the responsible vendor whose quote conforms to the RFQ and is most advantageous to the Government considering only price and price related factors. Solicitations, information notices, and amendments for this RFQ will be posted at https://sam.gov.
Scope of Work: The project includes all labor, parts, tools, plant, equipment, appliances, transportation, materials, and supervision necessary to replace the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base as specified in the attached Statement of Work. The purchase order duration will be 60 days after notice to proceed to include inspection and punch list.
Pre-Quote Conference/Site Visit: We are offering two sessions of the pre-quote conference and site visit. See the RFQ Section 00 21 00 – Instructions for details.
Due Date: Quotes are due via email to carrie.a.mckay2.civ@army.mil and david.m.best.civ@army.mil by the date and time indicated in block 13 of the RFQ (Standard Form 1442 – Solicitation, Offer, and Award).
Your attention is directed to Revolutionary FAR Overhaul (RFO) clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states; By submission of an offer and execution of a contract (purchase order), the Contractor will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded.
In accordance with RFO FAR 36.101-4, the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at Revolutionary FAR Overhaul (RFO) 43.304, DFARS RFO Deviation 243.304 and AFARS 5143.304. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on https://sam.gov, and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the quoter’s responsibility to check the website periodically for any amendments to the solicitation. The Government will not compensate for costs incurred in preparation of quotes. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a quoter's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Update #3 ·
7/2/26: Issued Amendment 0001 to extend the due date to 17 JUL 2026 and attach Identifier 0002 (2020 Utility Drawings) and Identifier 0003 (2019 Site Photos) in Section 00 01 15. See attachments to this posting.
7/1/26: Added the 7/1/26 pre-quote site visit slides and sign in sheet as attachments to this posting.
Notice ID: W50S77-26-Q-A001
Notice Type: Combined Synopsis/Solicitation
Notice Issue Date: June 25, 2026
Date for Receipt of Responses: July 15, 2026 at 4:00pm CDT
Contracting Office: United States Property & Fiscal Office - Texas Air National Guard
Title: FY26 Installation of New 3-Phase Primary Underground Electrical Service
Project Number: FWJH262710
Location: Ellington Field Joint Reserve Base,14657 Sneider Street, Houston, Texas 77034
Category: N – Installation of Equipment
NAICS: 238210 – Electrical Contractors and Other Wiring Installation
PSC: N061 – Installation of Equipment – Electric Wire and Power Distribution Equipment
Magnitude: Between $25,000.00 - $50,000.00
Set Aside: Total Small Business Set-Aside
Combined Synopsis/Solicitation Number W50S77-26-Q-A001 is issued as a request for quotation (RFQ) for the replacement of the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base, Houston, TX. This project is required to restore reliable electrical service to the mobile shooting range and return the facility to full operational capability in support of training and mission readiness. This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. The Government intends to award a Firm Fixed Price (FFP) purchase order resulting from this RFP to the responsible vendor whose quote conforms to the RFQ and is most advantageous to the Government considering only price and price related factors. Solicitations, information notices, and amendments for this RFQ will be posted at https://sam.gov.
Scope of Work: The project includes all labor, parts, tools, plant, equipment, appliances, transportation, materials, and supervision necessary to replace the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base as specified in the attached Statement of Work. The purchase order duration will be 60 days after notice to proceed to include inspection and punch list.
Pre-Quote Conference/Site Visit: We are offering two sessions of the pre-quote conference and site visit. See the RFQ Section 00 21 00 – Instructions for details.
Due Date: Quotes are due via email to carrie.a.mckay2.civ@army.mil and david.m.best.civ@army.mil by the date and time indicated in block 13 of the RFQ (Standard Form 1442 – Solicitation, Offer, and Award).
Your attention is directed to Revolutionary FAR Overhaul (RFO) clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states; By submission of an offer and execution of a contract (purchase order), the Contractor will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded.
In accordance with RFO FAR 36.101-4, the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at Revolutionary FAR Overhaul (RFO) 43.304, DFARS RFO Deviation 243.304 and AFARS 5143.304. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on https://sam.gov, and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the quoter’s responsibility to check the website periodically for any amendments to the solicitation. The Government will not compensate for costs incurred in preparation of quotes. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a quoter's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Update #2 ·
7/1/26: Added the 7/1/26 pre-quote site visit slides and sign in sheet as attachments to this posting.
Notice ID: W50S77-26-Q-A001
Notice Type: Combined Synopsis/Solicitation
Notice Issue Date: June 25, 2026
Date for Receipt of Responses: July 15, 2026 at 4:00pm CDT
Contracting Office: United States Property & Fiscal Office - Texas Air National Guard
Title: FY26 Installation of New 3-Phase Primary Underground Electrical Service
Project Number: FWJH262710
Location: Ellington Field Joint Reserve Base,14657 Sneider Street, Houston, Texas 77034
Category: N – Installation of Equipment
NAICS: 238210 – Electrical Contractors and Other Wiring Installation
PSC: N061 – Installation of Equipment – Electric Wire and Power Distribution Equipment
Magnitude: Between $25,000.00 - $50,000.00
Set Aside: Total Small Business Set-Aside
Combined Synopsis/Solicitation Number W50S77-26-Q-A001 is issued as a request for quotation (RFQ) for the replacement of the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base, Houston, TX. This project is required to restore reliable electrical service to the mobile shooting range and return the facility to full operational capability in support of training and mission readiness. This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. The Government intends to award a Firm Fixed Price (FFP) purchase order resulting from this RFP to the responsible vendor whose quote conforms to the RFQ and is most advantageous to the Government considering only price and price related factors. Solicitations, information notices, and amendments for this RFQ will be posted at https://sam.gov.
Scope of Work: The project includes all labor, parts, tools, plant, equipment, appliances, transportation, materials, and supervision necessary to replace the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base as specified in the attached Statement of Work. The purchase order duration will be 60 days after notice to proceed to include inspection and punch list.
Pre-Quote Conference/Site Visit: We are offering two sessions of the pre-quote conference and site visit. See the RFQ Section 00 21 00 – Instructions for details.
Due Date: Quotes are due via email to carrie.a.mckay2.civ@army.mil and david.m.best.civ@army.mil by the date and time indicated in block 13 of the RFQ (Standard Form 1442 – Solicitation, Offer, and Award).
Your attention is directed to Revolutionary FAR Overhaul (RFO) clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states; By submission of an offer and execution of a contract (purchase order), the Contractor will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded.
In accordance with RFO FAR 36.101-4, the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at Revolutionary FAR Overhaul (RFO) 43.304, DFARS RFO Deviation 243.304 and AFARS 5143.304. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on https://sam.gov, and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the quoter’s responsibility to check the website periodically for any amendments to the solicitation. The Government will not compensate for costs incurred in preparation of quotes. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a quoter's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
Update #1 ·
Notice ID: W50S77-26-Q-A001
Notice Type: Combined Synopsis/Solicitation
Notice Issue Date: June 25, 2026
Date for Receipt of Responses: July 15, 2026 at 4:00pm CDT
Contracting Office: United States Property & Fiscal Office - Texas Air National Guard
Title: FY26 Installation of New 3-Phase Primary Underground Electrical Service
Project Number: FWJH262710
Location: Ellington Field Joint Reserve Base,14657 Sneider Street, Houston, Texas 77034
Category: N – Installation of Equipment
NAICS: 238210 – Electrical Contractors and Other Wiring Installation
PSC: N061 – Installation of Equipment – Electric Wire and Power Distribution Equipment
Magnitude: Between $25,000.00 - $50,000.00
Set Aside: Total Small Business Set-Aside
Combined Synopsis/Solicitation Number W50S77-26-Q-A001 is issued as a request for quotation (RFQ) for the replacement of the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base, Houston, TX. This project is required to restore reliable electrical service to the mobile shooting range and return the facility to full operational capability in support of training and mission readiness. This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued. The Government intends to award a Firm Fixed Price (FFP) purchase order resulting from this RFP to the responsible vendor whose quote conforms to the RFQ and is most advantageous to the Government considering only price and price related factors. Solicitations, information notices, and amendments for this RFQ will be posted at https://sam.gov.
Scope of Work: The project includes all labor, parts, tools, plant, equipment, appliances, transportation, materials, and supervision necessary to replace the failed underground primary electrical service between the existing tap box and transformer supplying power to the mobile shooting range at Ellington Field Joint Reserve Base as specified in the attached Statement of Work. The purchase order duration will be 60 days after notice to proceed to include inspection and punch list.
Pre-Quote Conference/Site Visit: We are offering two sessions of the pre-quote conference and site visit. See the RFQ Section 00 21 00 – Instructions for details.
Due Date: Quotes are due via email to carrie.a.mckay2.civ@army.mil and david.m.best.civ@army.mil by the date and time indicated in block 13 of the RFQ (Standard Form 1442 – Solicitation, Offer, and Award).
Your attention is directed to Revolutionary FAR Overhaul (RFO) clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states; By submission of an offer and execution of a contract (purchase order), the Contractor will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded.
In accordance with RFO FAR 36.101-4, the following information is provided: (1) The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at Revolutionary FAR Overhaul (RFO) 43.304, DFARS RFO Deviation 243.304 and AFARS 5143.304. (2) Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available but will be compiled and provided in future announcements.
DISCLAIMER: The official plans and specifications are located on https://sam.gov, and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the quoter’s responsibility to check the website periodically for any amendments to the solicitation. The Government will not compensate for costs incurred in preparation of quotes. Websites are occasionally inaccessible, due to various reasons. The Government is not responsible for any loss of Internet connectivity or for a quoter's inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.