About this opportunity

This pre-solicitation notice is seeking construction services for the Riley Pass Bluff B Northeast Reclamation Project located on National Forest System land managed by the USDA Forest Service Northern Region. The scope of work involves excavating historic mine wastes at various locations on Bluff B and placing and compacting the mine wastes at embankment areas. Key requirements include mobilization, construction surveying, erosion control, site preparation, and excavating, loading, placing and compacting mine wastes. The evaluation criteria and contract terms will be detailed in the full solicitation to be posted on or after December 1, 2022. A mandatory site visit is scheduled for November 17, 2022.

There is no set-aside designation for this opportunity. The project magnitude is estimated between $1 million to $5 million. The location is approximately 100 miles north of Belle Fourche, South Dakota within the Custer-Gallatin National Forest in Harding County. Relevant NAICS codes are expected to include 237310 and 238990.

Notice text

3 versions

Update #3 · Latest ·

This is a PRE-SOLICITATION NOTICE only.  THE REQUEST FOR PROPOSAL SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR AFTER NOVEMBER 1, 2021.  The solicitation documents, plans, drawings, etc. will be posted with the solicitation notice.

The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not stipulated, except as considered essential for successful completion of the work. The Contractor must furnish all labor, materials, equipment/tools, transportation, supervision, testing and supplies necessary to complete the work according to the contract.


(b) Description of Work. The Work shall be performed on Bluff B, which involves excavating historic mine wastes at various locations on Bluff B and placing and compacting the mine wastes at embankment areas. Bluff B Work includes, but is not limited to, the following:
• Mobilization, demobilization, bonding and insurance
• Construction surveying and staking
• Erosion control
• Site Preparation
• Excavating, loading, placing and compacting mine wastes


Project Information
(a) Project Location. The Riley Pass Bluff B Reclamation Project Site (Project Site) is located in the North Cave Hills land unit of the Custer-Gallatin National Forest in Harding County, South Dakota.
The Project Site is approximately 100 miles north of Belle Fourche, South Dakota, 25 miles north of Buffalo, South Dakota, and 30 miles south of Bowman, North Dakota. The nearest town is Ludlow, South Dakota, which is approximately 5 miles east of the Riley Pass project site. The Project Site can be accessed by turning west off U.S. Highway 85 onto Tufte Road, 2 miles north of Ludlow; then turning left on South Cave Hill Road which turns into FSR #3120 at the National Forest boundary.
The Project Site is situated on National Forest System (NFS) land managed by the United States Department of Agriculture, Forest Service (USFS), Custer-Gallatin National Forest (CGNF).


(b) Price Range. The project magnitude is estimated to be between $1 million to $5 million.


(c) Site Visit.  There will be a Site Visit for this project after the solicitation notice is posted.  The proposed date for the site visit is Wed. November 17th @ 1:00 pm (Mountain Time).

Update #2 ·

This is a PRE-SOLICITATION NOTICE only.  THE REQUEST FOR PROPOSAL SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR AFTER DEC. 1, 2021.  The solicitation documents, plans, drawings, etc. will be posted with the solicitation notice.

The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not stipulated, except as considered essential for successful completion of the work. The Contractor must furnish all labor, materials, equipment/tools, transportation, supervision, testing and supplies necessary to complete the work according to the contract.


(b) Description of Work. The Work shall be performed on Bluff B, which involves excavating historic mine wastes at various locations on Bluff B and placing and compacting the mine wastes at embankment areas. Bluff B Work includes, but is not limited to, the following:
• Mobilization, demobilization, bonding and insurance
• Construction surveying and staking
• Erosion control
• Site Preparation
• Excavating, loading, placing and compacting mine wastes


Project Information
(a) Project Location. The Riley Pass Bluff B Reclamation Project Site (Project Site) is located in the North Cave Hills land unit of the Custer-Gallatin National Forest in Harding County, South Dakota.
The Project Site is approximately 100 miles north of Belle Fourche, South Dakota, 25 miles north of Buffalo, South Dakota, and 30 miles south of Bowman, North Dakota. The nearest town is Ludlow, South Dakota, which is approximately 5 miles east of the Riley Pass project site. The Project Site can be accessed by turning west off U.S. Highway 85 onto Tufte Road, 2 miles north of Ludlow; then turning left on South Cave Hill Road which turns into FSR #3120 at the National Forest boundary.
The Project Site is situated on National Forest System (NFS) land managed by the United States Department of Agriculture, Forest Service (USFS), Custer-Gallatin National Forest (CGNF).


(b) Price Range. The project magnitude is estimated to be between $1 million to $5 million.


(c) Site Visit.  There will be a Site Visit for this project after the solicitation notice is posted.  The proposed date for the site visit is Wed. November 17th @ 1:00 pm (Mountain Time).

Update #1 ·

This is a PRE-SOLICITATION NOTICE only.  THE SOLICITATION FOR THIS PROJECT WILL BE POSTSED ON OR AFTER DEC. 1, 2022.  The solicitation documents, plans, drawings, etc. will be posted with the solicitation notice.

The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not stipulated, except as considered essential for successful completion of the work. The Contractor must furnish all labor, materials, equipment/tools, transportation, supervision, testing and supplies necessary to complete the work according to the contract.


(b) Description of Work. The Work shall be performed on Bluff B, which involves excavating historic mine wastes at various locations on Bluff B and placing and compacting the mine wastes at embankment areas. Bluff B Work includes, but is not limited to, the following:
• Mobilization, demobilization, bonding and insurance
• Construction surveying and staking
• Erosion control
• Site Preparation
• Excavating, loading, placing and compacting mine wastes


Project Information
(a) Project Location. The Riley Pass Bluff B Reclamation Project Site (Project Site) is located in the North Cave Hills land unit of the Custer-Gallatin National Forest in Harding County, South Dakota.
The Project Site is approximately 100 miles north of Belle Fourche, South Dakota, 25 miles north of Buffalo, South Dakota, and 30 miles south of Bowman, North Dakota. The nearest town is Ludlow, South Dakota, which is approximately 5 miles east of the Riley Pass project site. The Project Site can be accessed by turning west off U.S. Highway 85 onto Tufte Road, 2 miles north of Ludlow; then turning left on South Cave Hill Road which turns into FSR #3120 at the National Forest boundary.
The Project Site is situated on National Forest System (NFS) land managed by the United States Department of Agriculture, Forest Service (USFS), Custer-Gallatin National Forest (CGNF).


(b) Price Range. The project magnitude is estimated to be between $1 million to $5 million.


(c) Site Visit.  There will be a Site Visit for this project after the solicitation notice is posted.  The proposed date for the site visit is Wed. November 17th @ 1:00 pm (Mountain Time).

Notice history

Notice Type Posted
FY22 Riley Pass Bluff B Northeast Reclamation Project Award Award Notice
FY22 Riley Pass Bluff B Northeast Reclamation Project Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site One mile north of the town of Creede in Mineral County, Colorado 81130 · NAICS 237990 ENDIST Omaha No set-aside
GAOA Grizzly Bear Campground South Dakota, United States · NAICS 237990 Region 2 - Rocky Mountain Region Total Small Business
Custer Gallatin National Forest Ashland and Sioux Road Maintenance Billings, Montana, United States · NAICS 237310 Region 6 - Pacific Northwest Region Total Small Business
Lower brule north shoreline stabilization and ecosystem restoration, element 2 Big Bend, Lower Brule, South Dakota 57548 · NAICS 237990 ENDIST Omaha Total Small Business
Request for Proposal Effigy Mounds National Monument - EFMO 224159/318539 NAICS 236220 — No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors