FY22 Riley Pass Bluff B Northeast Reclamation Project
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 1240LU22R0002
- Agency
-
Region 1 - Northern Region
Forest Service, Department of Agriculture
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 562910 Remediation Services
- Place of performance
- Ludlow, South Dakota 57755, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is seeking construction services for the Riley Pass Bluff B Northeast Reclamation Project located on National Forest System land managed by the USDA Forest Service Northern Region. The scope of work involves excavating historic mine wastes at various locations on Bluff B and placing and compacting the mine wastes at embankment areas. Key requirements include mobilization, construction surveying, erosion control, site preparation, and excavating, loading, placing and compacting mine wastes. The evaluation criteria and contract terms will be detailed in the full solicitation to be posted on or after December 1, 2022. A mandatory site visit is scheduled for November 17, 2022.
There is no set-aside designation for this opportunity. The project magnitude is estimated between $1 million to $5 million. The location is approximately 100 miles north of Belle Fourche, South Dakota within the Custer-Gallatin National Forest in Harding County. Relevant NAICS codes are expected to include 237310 and 238990.
Notice text
3 versions
Update #3 · Latest ·
This is a PRE-SOLICITATION NOTICE only. THE REQUEST FOR PROPOSAL SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR AFTER NOVEMBER 1, 2021. The solicitation documents, plans, drawings, etc. will be posted with the solicitation notice.
The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not stipulated, except as considered essential for successful completion of the work. The Contractor must furnish all labor, materials, equipment/tools, transportation, supervision, testing and supplies necessary to complete the work according to the contract.
(b) Description of Work. The Work shall be performed on Bluff B, which involves excavating historic mine wastes at various locations on Bluff B and placing and compacting the mine wastes at embankment areas. Bluff B Work includes, but is not limited to, the following:
• Mobilization, demobilization, bonding and insurance
• Construction surveying and staking
• Erosion control
• Site Preparation
• Excavating, loading, placing and compacting mine wastes
Project Information
(a) Project Location. The Riley Pass Bluff B Reclamation Project Site (Project Site) is located in the North Cave Hills land unit of the Custer-Gallatin National Forest in Harding County, South Dakota.
The Project Site is approximately 100 miles north of Belle Fourche, South Dakota, 25 miles north of Buffalo, South Dakota, and 30 miles south of Bowman, North Dakota. The nearest town is Ludlow, South Dakota, which is approximately 5 miles east of the Riley Pass project site. The Project Site can be accessed by turning west off U.S. Highway 85 onto Tufte Road, 2 miles north of Ludlow; then turning left on South Cave Hill Road which turns into FSR #3120 at the National Forest boundary.
The Project Site is situated on National Forest System (NFS) land managed by the United States Department of Agriculture, Forest Service (USFS), Custer-Gallatin National Forest (CGNF).
(b) Price Range. The project magnitude is estimated to be between $1 million to $5 million.
(c) Site Visit. There will be a Site Visit for this project after the solicitation notice is posted. The proposed date for the site visit is Wed. November 17th @ 1:00 pm (Mountain Time).
Update #2 ·
This is a PRE-SOLICITATION NOTICE only. THE REQUEST FOR PROPOSAL SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR AFTER DEC. 1, 2021. The solicitation documents, plans, drawings, etc. will be posted with the solicitation notice.
The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not stipulated, except as considered essential for successful completion of the work. The Contractor must furnish all labor, materials, equipment/tools, transportation, supervision, testing and supplies necessary to complete the work according to the contract.
(b) Description of Work. The Work shall be performed on Bluff B, which involves excavating historic mine wastes at various locations on Bluff B and placing and compacting the mine wastes at embankment areas. Bluff B Work includes, but is not limited to, the following:
• Mobilization, demobilization, bonding and insurance
• Construction surveying and staking
• Erosion control
• Site Preparation
• Excavating, loading, placing and compacting mine wastes
Project Information
(a) Project Location. The Riley Pass Bluff B Reclamation Project Site (Project Site) is located in the North Cave Hills land unit of the Custer-Gallatin National Forest in Harding County, South Dakota.
The Project Site is approximately 100 miles north of Belle Fourche, South Dakota, 25 miles north of Buffalo, South Dakota, and 30 miles south of Bowman, North Dakota. The nearest town is Ludlow, South Dakota, which is approximately 5 miles east of the Riley Pass project site. The Project Site can be accessed by turning west off U.S. Highway 85 onto Tufte Road, 2 miles north of Ludlow; then turning left on South Cave Hill Road which turns into FSR #3120 at the National Forest boundary.
The Project Site is situated on National Forest System (NFS) land managed by the United States Department of Agriculture, Forest Service (USFS), Custer-Gallatin National Forest (CGNF).
(b) Price Range. The project magnitude is estimated to be between $1 million to $5 million.
(c) Site Visit. There will be a Site Visit for this project after the solicitation notice is posted. The proposed date for the site visit is Wed. November 17th @ 1:00 pm (Mountain Time).
Update #1 ·
This is a PRE-SOLICITATION NOTICE only. THE SOLICITATION FOR THIS PROJECT WILL BE POSTSED ON OR AFTER DEC. 1, 2022. The solicitation documents, plans, drawings, etc. will be posted with the solicitation notice.
The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not stipulated, except as considered essential for successful completion of the work. The Contractor must furnish all labor, materials, equipment/tools, transportation, supervision, testing and supplies necessary to complete the work according to the contract.
(b) Description of Work. The Work shall be performed on Bluff B, which involves excavating historic mine wastes at various locations on Bluff B and placing and compacting the mine wastes at embankment areas. Bluff B Work includes, but is not limited to, the following:
• Mobilization, demobilization, bonding and insurance
• Construction surveying and staking
• Erosion control
• Site Preparation
• Excavating, loading, placing and compacting mine wastes
Project Information
(a) Project Location. The Riley Pass Bluff B Reclamation Project Site (Project Site) is located in the North Cave Hills land unit of the Custer-Gallatin National Forest in Harding County, South Dakota.
The Project Site is approximately 100 miles north of Belle Fourche, South Dakota, 25 miles north of Buffalo, South Dakota, and 30 miles south of Bowman, North Dakota. The nearest town is Ludlow, South Dakota, which is approximately 5 miles east of the Riley Pass project site. The Project Site can be accessed by turning west off U.S. Highway 85 onto Tufte Road, 2 miles north of Ludlow; then turning left on South Cave Hill Road which turns into FSR #3120 at the National Forest boundary.
The Project Site is situated on National Forest System (NFS) land managed by the United States Department of Agriculture, Forest Service (USFS), Custer-Gallatin National Forest (CGNF).
(b) Price Range. The project magnitude is estimated to be between $1 million to $5 million.
(c) Site Visit. There will be a Site Visit for this project after the solicitation notice is posted. The proposed date for the site visit is Wed. November 17th @ 1:00 pm (Mountain Time).
Notice history
| Notice | Type | Posted |
|---|---|---|
| FY22 Riley Pass Bluff B Northeast Reclamation Project | Award Notice | |
| FY22 Riley Pass Bluff B Northeast Reclamation Project | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site | ENDIST Omaha | No set-aside | |
| GAOA Grizzly Bear Campground | Region 2 - Rocky Mountain Region | Total Small Business | |
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| Lower brule north shoreline stabilization and ecosystem restoration, element 2 | ENDIST Omaha | Total Small Business | |
| Request for Proposal Effigy Mounds National Monument - EFMO 224159/318539 | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity