Fuel Dispensing Station

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W50S8F-21-B-0002
Agency
Army National Guard Department of the Army, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z1PZ Maintenance Of Other Non-Building Facilities
Place of performance
Little Egg Harbor Township, New Jersey 08087, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

  1. Background: The 177th Fighter Wing, Detachment 1, Warren Grove Gunnery Range has a requirement for the construction of concrete slabs for a Trans Cube Fuel Storage Tank and a Dispensing Station.
  2. This project will support the future installation of an above ground 5,000 gallon Trans Cube Fuel Storage Tank and Fuel Dispensing Station.  The general scope of this project includes the construction of two (2) concrete fuel storage pads, a concrete fuel dispensing pad, traffic bollards, & electrical requirements. The scope of work for this project will require the contractor to provide and install all material, equipment, labor, & supervision required for a complete and useable system.
  3. Installation will include the pouring of two (2) adjacent concrete slabs for Fuel Storage Tank, construct a dispensing concrete pad, traffic bollards, & Electrical Requirements in accordance with the Scope of Work (SOW).
  4. This project is on a secure military facility. All personnel accessing the site will be required to submit personal information for a background investigation with the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance with AFI 10-245, AFI 31-101 and AFMAN 31-113. The Government reserves the right to limit access to the facility based on adverse results to the background investigation.All personnel accessing the military facility consent to search of their persons and property.
  5. Contract Award is expected in late August 2021.Period of Performance will begin as soon as practically possible.
  6. Magnitude of Construction: FAR 36.20(c) - Between $100,000 and $250,000
  7. Bid Bond: Bid Bond is required. ref:  FAR 52.228-1
  8. Payment Bonds, Performance Bonds, and Insurance will ALL be required after contract award.
  9. The Contactor awarded the contract, will be required to have full-time Site Supervision on the project site at all times during construction activities. Note: He does not have to “watch” an empty site. This requirement is while personnel are on site working, testing is being accomplished, deliveries are being made...The Site Superintendent is considered a key position and may NOT be delegated below the Prime Contractor level.
  10. Vendors MUST be registered in SAM at time of Bid Opening. ref: 52.204-7(b)(1)
  11. Pre-Bid Conference / Meeting: The Pre-Bid Conference will be conducted. Connection details are posted in Attachment 03 Section 00100 - Instruction to Offerors
  12. The 177th Fighter Wing is located adjacent to Atlantic City International Airport in Egg Harbor Township, NJ. 08234.

26 July 2021- Amendment 01 (SF30) posted, which incorporates the following:

1. Change bid due date to 25 August 2021 @1pm, local time.

2. Pre-bid conference sign-in sheet and power point presentation

3. Updated SOW dated 23 July 2021 

4. Updated Attachment Schedule

Offerors shall acknowledge all amendments and include in their offer package.  Failure to do so will result in offer not being considered for award. 

03 August 2021

1.  Add Q&A Log dated 03 August 2021.

26 August 2021

1.  Add Abstract of Bids pages 1 &2 (plus hard copy), sign in sheet, and Pre-bid opening Presentation

Update #3 ·
  1. Background: The 177th Fighter Wing, Detachment 1, Warren Grove Gunnery Range has a requirement for the construction of concrete slabs for a Trans Cube Fuel Storage Tank and a Dispensing Station.
  2. This project will support the future installation of an above ground 5,000 gallon Trans Cube Fuel Storage Tank and Fuel Dispensing Station.  The general scope of this project includes the construction of two (2) concrete fuel storage pads, a concrete fuel dispensing pad, traffic bollards, & electrical requirements. The scope of work for this project will require the contractor to provide and install all material, equipment, labor, & supervision required for a complete and useable system.
  3. Installation will include the pouring of two (2) adjacent concrete slabs for Fuel Storage Tank, construct a dispensing concrete pad, traffic bollards, & Electrical Requirements in accordance with the Scope of Work (SOW).
  4. This project is on a secure military facility. All personnel accessing the site will be required to submit personal information for a background investigation with the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance with AFI 10-245, AFI 31-101 and AFMAN 31-113. The Government reserves the right to limit access to the facility based on adverse results to the background investigation.All personnel accessing the military facility consent to search of their persons and property.
  5. Contract Award is expected in late August 2021.Period of Performance will begin as soon as practically possible.
  6. Magnitude of Construction: FAR 36.20(c) - Between $100,000 and $250,000
  7. Bid Bond: Bid Bond is required. ref:  FAR 52.228-1
  8. Payment Bonds, Performance Bonds, and Insurance will ALL be required after contract award.
  9. The Contactor awarded the contract, will be required to have full-time Site Supervision on the project site at all times during construction activities. Note: He does not have to “watch” an empty site. This requirement is while personnel are on site working, testing is being accomplished, deliveries are being made...The Site Superintendent is considered a key position and may NOT be delegated below the Prime Contractor level.
  10. Vendors MUST be registered in SAM at time of Bid Opening. ref: 52.204-7(b)(1)
  11. Pre-Bid Conference / Meeting: The Pre-Bid Conference will be conducted. Connection details are posted in Attachment 03 Section 00100 - Instruction to Offerors
  12. The 177th Fighter Wing is located adjacent to Atlantic City International Airport in Egg Harbor Township, NJ. 08234.

26 July 2021- Amendment 01 (SF30) posted, which incorporates the following:

1. Change bid due date to 25 August 2021 @1pm, local time.

2. Pre-bid conference sign-in sheet and power point presentation

3. Updated SOW dated 23 July 2021 

4. Updated Attachment Schedule

Offerors shall acknowledge all amendments and include in their offer package.  Failure to do so will result in offer not being considered for award. 

03 August 2021

1.  Add Q&A Log dated 03 August 2021.

Update #2 ·
  1. Background: The 177th Fighter Wing, Detachment 1, Warren Grove Gunnery Range has a requirement for the construction of concrete slabs for a Trans Cube Fuel Storage Tank and a Dispensing Station.
  2. This project will support the future installation of an above ground 5,000 gallon Trans Cube Fuel Storage Tank and Fuel Dispensing Station.  The general scope of this project includes the construction of two (2) concrete fuel storage pads, a concrete fuel dispensing pad, traffic bollards, & electrical requirements. The scope of work for this project will require the contractor to provide and install all material, equipment, labor, & supervision required for a complete and useable system.
  3. Installation will include the pouring of two (2) adjacent concrete slabs for Fuel Storage Tank, construct a dispensing concrete pad, traffic bollards, & Electrical Requirements in accordance with the Scope of Work (SOW).
  4. This project is on a secure military facility. All personnel accessing the site will be required to submit personal information for a background investigation with the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance with AFI 10-245, AFI 31-101 and AFMAN 31-113. The Government reserves the right to limit access to the facility based on adverse results to the background investigation.All personnel accessing the military facility consent to search of their persons and property.
  5. Contract Award is expected in late August 2021.Period of Performance will begin as soon as practically possible.
  6. Magnitude of Construction: FAR 36.20(c) - Between $100,000 and $250,000
  7. Bid Bond: Bid Bond is required. ref:  FAR 52.228-1
  8. Payment Bonds, Performance Bonds, and Insurance will ALL be required after contract award.
  9. The Contactor awarded the contract, will be required to have full-time Site Supervision on the project site at all times during construction activities. Note: He does not have to “watch” an empty site. This requirement is while personnel are on site working, testing is being accomplished, deliveries are being made...The Site Superintendent is considered a key position and may NOT be delegated below the Prime Contractor level.
  10. Vendors MUST be registered in SAM at time of Bid Opening. ref: 52.204-7(b)(1)
  11. Pre-Bid Conference / Meeting: The Pre-Bid Conference will be conducted. Connection details are posted in Attachment 03 Section 00100 - Instruction to Offerors
  12. The 177th Fighter Wing is located adjacent to Atlantic City International Airport in Egg Harbor Township, NJ. 08234.

26 July 2021- Amendment 01 (SF30) posted, which incorporates the following:

1. Change bid due date to 25 August 2021 @1pm, local time.

2. Pre-bid conference sign-in sheet and power point presentation

3. Updated SOW dated 23 July 2021 

4. Updated Attachment Schedule

Offerors shall acknowledge all amendments and include in their offer package.  Failure to do so will result in offer not being considered for award. 

Update #1 ·
  1. Background: The 177th Fighter Wing, Detachment 1, Warren Grove Gunnery Range has a requirement for the construction of concrete slabs for a Trans Cube Fuel Storage Tank and a Dispensing Station.
  2. This project will support the future installation of an above ground 5,000 gallon Trans Cube Fuel Storage Tank and Fuel Dispensing Station.  The general scope of this project includes the construction of two (2) concrete fuel storage pads, a concrete fuel dispensing pad, traffic bollards, & electrical requirements. The scope of work for this project will require the contractor to provide and install all material, equipment, labor, & supervision required for a complete and useable system.
  3. Installation will include the pouring of two (2) adjacent concrete slabs for Fuel Storage Tank, construct a dispensing concrete pad, traffic bollards, & Electrical Requirements in accordance with the Scope of Work (SOW).
  4. This project is on a secure military facility. All personnel accessing the site will be required to submit personal information for a background investigation with the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance with AFI 10-245, AFI 31-101 and AFMAN 31-113. The Government reserves the right to limit access to the facility based on adverse results to the background investigation.All personnel accessing the military facility consent to search of their persons and property.
  5. Contract Award is expected in late August 2021.Period of Performance will begin as soon as practically possible.
  6. Magnitude of Construction: FAR 36.20(c) - Between $100,000 and $250,000
  7. Bid Bond: Bid Bond is required. ref:  FAR 52.228-1
  8. Payment Bonds, Performance Bonds, and Insurance will ALL be required after contract award.
  9. The Contactor awarded the contract, will be required to have full-time Site Supervision on the project site at all times during construction activities. Note: He does not have to “watch” an empty site. This requirement is while personnel are on site working, testing is being accomplished, deliveries are being made...The Site Superintendent is considered a key position and may NOT be delegated below the Prime Contractor level.
  10. Vendors MUST be registered in SAM at time of Bid Opening. ref: 52.204-7(b)(1)
  11. Pre-Bid Conference / Meeting: The Pre-Bid Conference will be conducted. Connection details are posted in Attachment 03 Section 00100 - Instruction to Offerors
  12. The 177th Fighter Wing is located adjacent to Atlantic City International Airport in Egg Harbor Township, NJ. 08234.

Attachments

Files attached to this notice, newest first
File Type Posted
W50S8F-21-B-0002_WGR Fuel Pad_BidOpen_PPT.ppt PPT presentation
Manual OF 1419 and OF 1419A.pdf PDF
Abstract-Digitally signed by KO.pdf PDF
Bid Opening Sign in Sheet.pdf PDF
W50S8F-21-B-0002_WGR Fuel Dispensing_Bid_QA_20210803.pdf PDF
W50S8F-21-B-0002_WGR Fuel Dispensing Station_Pre-Bid_Conf_PPT_REV01.pptx PPTX presentation
Attach_04_Rev_01_21_B_0002_WGR_SOW_R01_20210723.pdf PDF
Amend 01 W50S8F-21-B-0002 WGR Fuel Dispensing Station.pdf PDF
Attach_01_21-B-0002_Attachment_Schedule_Rev_01.xlsx XLSX spreadsheet
Site Visit Sign-in Sheet-.pdf PDF
Attach_05_21-B-0002_WGR Fuel Pad Material Submittal_Register_AF Form 66_ProjectMates_TEMPLATE_FY20_JM.xlsx XLSX spreadsheet
Attach_01_21-B-0002_Attachment_Schedule.xlsx XLSX spreadsheet
Attach_03_21-B-0002_WGR Fuel Pad_Sect_00100_Instructions-.docx DOCX document
Attach_04_21-B-0002_WGR Fuel Pad_SOW_20210611.pdf PDF
W50S8F-21-B-0002_WGR Fuel Pad_SF1442.pdf PDF
Attach_012_21-B-0002_WGR Fuel Pad_177WGR_VicinityMaps.pdf PDF
Attach_010_21-B-0002_WGR Fuel Pad_OPSEC_Letter.docx DOCX document
Attach_09_21-B-0002_WGR Fuel Pad_EnviroManagSystem.pdf PDF
Attach_02_21-B-0002_WGR Fuel Pad_NOTES.docx DOCX document
Attach_06_21-B-0002_WGR Fuel Pad_Pics.pdf PDF
Attach_07_21-B-0002_WGR Fuel Pad DOL Wage Rate.pdf PDF
Attach_08_21-B-0002_WGR Fuel Pad_InsuranceRequire.docx DOCX document
Show all 22

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Fuel Dispensing Station Award Award Notice
Fuel Dispensing Station This notice · Latest solicitation Solicitation
Fuel Dispensing Station Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity