Solicitation #: W50S8F-21-B-0002 Project Name & Number: AQRC182003: WGR Fuel Dispensing Station
Updated: Tuesday, August 3, 2021
RFI # Submitted Answered Question Response Response By
1 27-Jul-21 Is the conduit inside the Pre-engineered building required to be (RMC) conduit as well?
No. Contractor may install EMT inside the Pre-engineered building.
MC cable and PVC conduit may NOT be used.
End User
2 27-Jul-21 Is there a fuel controller that the new ‘Shut-off’ buttons are to control?
Yes, there is a fuel controller that the new ‘Shut-off’ buttons will control.
Information regarding the type, make, or model is not available at this time.
Contractor's shall operate under the Basis of Design that the new fuel controller will be similiar to the existing fuel controller located behind the existing tanks.
End User
3 27-Jul-21 Is a separate conduit required for each circuit listed in the SOW? No, as long as wire fill does not exceed NEC code. End User
4 27-Jul-21 Does the existing fuel dispenser need to stay operable until the new dispenser is working?
Yes, the existing fuel dispenser must stay operable until the new dispenser and tanks are fully operational.
Temporary shut downs of the existing system, not exceeding 3 calender days, may be coordinated with the Government.
End User
5 27-Jul-21 In the SOW 2.1.4.7, it states that the junction box shall be terminated at the edge of the fuel pad, however, in 2.1.4.8 it states that the junction box shall be 5' from the edge of the fuel pad. Please clarify
Conduit and junction box should be next to edge of pad, 5' back from front SE corner of pad. Fuel controllers and tanks will be set back approx 5 ft from front edge of pad to accommodate walking area for dispensing fuel.
End User
6 27-Jul-21 I downloaded all the addendums/changes to the solicitation WGR Fuel Dispensing Pad project. How/who do I return the signed acknowledgement?
Bidders shall Acknowledge all formal Amendments in Block 19 of the SF 1442 when submitting their Bids.
177FW MSC
177th Fighter Wing Pre-Bid RFI Questions & Clarifications
| 2021-08-03T15:30:19-0400 | |