W50S8F-21-B-0002_WGR Fuel Dispensing_Bid_QA_20210803.pdf

PDF 490 KB Posted

Attached to
Fuel Dispensing Station
Solicitation number
W50S8F-21-B-0002
Issued by

View the file

Other files

File Type Posted
W50S8F-21-B-0002_WGR Fuel Pad_BidOpen_PPT.ppt PPT presentation
Manual OF 1419 and OF 1419A.pdf PDF
Bid Opening Sign in Sheet.pdf PDF
Abstract-Digitally signed by KO.pdf PDF
W50S8F-21-B-0002_WGR Fuel Dispensing Station_Pre-Bid_Conf_PPT_REV01.pptx PPTX presentation
Site Visit Sign-in Sheet-.pdf PDF
Attach_04_Rev_01_21_B_0002_WGR_SOW_R01_20210723.pdf PDF
Amend 01 W50S8F-21-B-0002 WGR Fuel Dispensing Station.pdf PDF
Attach_01_21-B-0002_Attachment_Schedule_Rev_01.xlsx XLSX spreadsheet
Attach_03_21-B-0002_WGR Fuel Pad_Sect_00100_Instructions-.docx DOCX document
Attach_010_21-B-0002_WGR Fuel Pad_OPSEC_Letter.docx DOCX document
Attach_07_21-B-0002_WGR Fuel Pad DOL Wage Rate.pdf PDF
Attach_08_21-B-0002_WGR Fuel Pad_InsuranceRequire.docx DOCX document
Attach_06_21-B-0002_WGR Fuel Pad_Pics.pdf PDF
Attach_05_21-B-0002_WGR Fuel Pad Material Submittal_Register_AF Form 66_ProjectMates_TEMPLATE_FY20_JM.xlsx XLSX spreadsheet
Attach_01_21-B-0002_Attachment_Schedule.xlsx XLSX spreadsheet
Attach_02_21-B-0002_WGR Fuel Pad_NOTES.docx DOCX document
Attach_09_21-B-0002_WGR Fuel Pad_EnviroManagSystem.pdf PDF
W50S8F-21-B-0002_WGR Fuel Pad_SF1442.pdf PDF
Attach_012_21-B-0002_WGR Fuel Pad_177WGR_VicinityMaps.pdf PDF
Attach_04_21-B-0002_WGR Fuel Pad_SOW_20210611.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: W50S8F-21-B-0002 Project Name & Number: AQRC182003: WGR Fuel Dispensing Station

Updated: Tuesday, August 3, 2021

RFI # Submitted Answered Question Response Response By

1 27-Jul-21 Is the conduit inside the Pre-engineered building required to be (RMC) conduit as well?

No. Contractor may install EMT inside the Pre-engineered building.

MC cable and PVC conduit may NOT be used.

End User

2 27-Jul-21 Is there a fuel controller that the new ‘Shut-off’ buttons are to control?

Yes, there is a fuel controller that the new ‘Shut-off’ buttons will control.

Information regarding the type, make, or model is not available at this time.

Contractor's shall operate under the Basis of Design that the new fuel controller will be similiar to the existing fuel controller located behind the existing tanks.

End User

3 27-Jul-21 Is a separate conduit required for each circuit listed in the SOW? No, as long as wire fill does not exceed NEC code. End User

4 27-Jul-21 Does the existing fuel dispenser need to stay operable until the new dispenser is working?

Yes, the existing fuel dispenser must stay operable until the new dispenser and tanks are fully operational.

Temporary shut downs of the existing system, not exceeding 3 calender days, may be coordinated with the Government.

End User

5 27-Jul-21 In the SOW 2.1.4.7, it states that the junction box shall be terminated at the edge of the fuel pad, however, in 2.1.4.8 it states that the junction box shall be 5' from the edge of the fuel pad. Please clarify

Conduit and junction box should be next to edge of pad, 5' back from front SE corner of pad. Fuel controllers and tanks will be set back approx 5 ft from front edge of pad to accommodate walking area for dispensing fuel.

End User

6 27-Jul-21 I downloaded all the addendums/changes to the solicitation WGR Fuel Dispensing Pad project. How/who do I return the signed acknowledgement?

Bidders shall Acknowledge all formal Amendments in Block 19 of the SF 1442 when submitting their Bids.

177FW MSC

177th Fighter Wing Pre-Bid RFI Questions & Clarifications

2021-08-03T15:30:19-0400
HICKERSON.TAMMY.LYNN.1030191800