Amend 01 W50S8F-21-B-0002 WGR Fuel Dispensing Station.pdf

PDF 417 KB Posted

Attached to
Fuel Dispensing Station
Solicitation number
W50S8F-21-B-0002
Issued by

View the file

Other files

File Type Posted
W50S8F-21-B-0002_WGR Fuel Pad_BidOpen_PPT.ppt PPT presentation
Manual OF 1419 and OF 1419A.pdf PDF
Bid Opening Sign in Sheet.pdf PDF
Abstract-Digitally signed by KO.pdf PDF
W50S8F-21-B-0002_WGR Fuel Dispensing_Bid_QA_20210803.pdf PDF
W50S8F-21-B-0002_WGR Fuel Dispensing Station_Pre-Bid_Conf_PPT_REV01.pptx PPTX presentation
Site Visit Sign-in Sheet-.pdf PDF
Attach_04_Rev_01_21_B_0002_WGR_SOW_R01_20210723.pdf PDF
Attach_01_21-B-0002_Attachment_Schedule_Rev_01.xlsx XLSX spreadsheet
Attach_03_21-B-0002_WGR Fuel Pad_Sect_00100_Instructions-.docx DOCX document
Attach_010_21-B-0002_WGR Fuel Pad_OPSEC_Letter.docx DOCX document
Attach_07_21-B-0002_WGR Fuel Pad DOL Wage Rate.pdf PDF
Attach_08_21-B-0002_WGR Fuel Pad_InsuranceRequire.docx DOCX document
Attach_06_21-B-0002_WGR Fuel Pad_Pics.pdf PDF
Attach_05_21-B-0002_WGR Fuel Pad Material Submittal_Register_AF Form 66_ProjectMates_TEMPLATE_FY20_JM.xlsx XLSX spreadsheet
Attach_01_21-B-0002_Attachment_Schedule.xlsx XLSX spreadsheet
Attach_02_21-B-0002_WGR Fuel Pad_NOTES.docx DOCX document
Attach_09_21-B-0002_WGR Fuel Pad_EnviroManagSystem.pdf PDF
W50S8F-21-B-0002_WGR Fuel Pad_SF1442.pdf PDF
Attach_012_21-B-0002_WGR Fuel Pad_177WGR_VicinityMaps.pdf PDF
Attach_04_21-B-0002_WGR Fuel Pad_SOW_20210611.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. Change bid due date to 25 August 2021 @ 1pm EST.

B. Include Pre-Bid sign-in sheet & pow erpoint presentation.

C. Updated SOW dated 23 July 2021.

D. Remove CLIN 002-ABI., Demo and removal of existing concrete pad.

E. No other changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Jul-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S8F21B0002

X 9B. DATED (SEE ITEM 11)

15-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Jul-2021

CODE

USPFO NJ 177 MSC

400 LANGLEY RD

EGG HARBOR TOWNSHIP NJ 08234-9500

W50S8F 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S8F21B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 17-Aug-2021 12:00 PM to 25-Aug-2021 01:00 PM.

CLIN 0002

The CLIN description has changed from ABI 0001 Existing Concrete Slab Demo to REMOVED.

The CLIN extended description has changed from:

Services Non-Personal. Contractor shall provide all material, equipment, labor & supervisioin to complete this project in accordance with the Scope of Work, & Contract Photos required for a complete & useable system.

To:

CLIN 0002 has been removed from the SOW.

The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.

DELIVERIES AND PERFORMANCE

The following Delivery Schedule for CLIN 0002 has been deleted:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

180 dys. ADC 1 F6BGRG

STEVE GASKILL

DET 1 - WG RANGE

ROUTE 539, MILEMARKER 7.5

WARREN GROVE NJ 08087

609-412-5151 FOB: Destination

F6BGRG

(End of Summary of Changes)