Ft. Randall Spillway Expansion Joint and Waterstop Repair

Award Notice Posted

Solicitation number
W9128F-18-R-0007
Agency
Awarded
to Journey Group Companies
Set-aside
No set-aside

Opportunity facts

Contract number
W9128F-18-C-0009 Federal contract award
PSC
Not on record
Place of performance
Ft. Randall Dam Pickstown, South Dakota 57367, United States

Notice details come from SAM.gov. Updated .

Notice text

7 versions

Update #7 · Latest ·

Amendment 0002 and associated drawings have been added.

Update #6 ·

Document referenced in ProjNet Inquiry ID: 7268459 has been uploaded.

Update #5 ·

The presentation and handouts provided at the site visit have been uploaded. 

Update #4 ·

The site visit sign-in sheet has been uploaded.

Update #3 ·

Amendment 0001 with associated drawings have been added.  The proposal due date has been extended to 17 January 2018 and reference ProjNet for all questions and answers submitted for this project.

Update #2 ·

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.


A site visit will be on or around 4 January 2018. The site visit time and date will be issued with the solicitation package.


DO NOT submit requests for plans and specifications to the site visit personnel listed above. See ‘Obtaining Solicitation Documents' below.
_______________________________________________________________________________


Project Description: (Approx. quantities)


Concrete removal (partial depth removal between 12" and 18" deep and full depth removal at 18" deep) on both sides of the expansion joint between the pier extension slab and the spillway chute slab across the 1000 LF width of the spillway at Fort Randall Dam, South Dakota. Construction of the proposed expansion joint will consist of removal of existing concrete, waterstop, expansion and sealant material; and installation of new stainless steel angles, waterstops, steel reinforcement, concrete, expansion material, joint seal, and a stainless steel cover plate with hardware. Concrete removal methodology will be limited to methods that minimize microfracturing of the substrate concrete in order to maximize the bonding potential of the proposed material. Set up and operation of an on-site concrete batch plant, with experienced plant operators with NRMCA or ACI certification.


The estimated construction cost of this project is between $4,000,000 and $6,000,000.
_______________________________________________________________________________



The Contractor will be required to commence work within 10 days after notice to proceed and complete the work 270 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required.



Offerors:
Please be advised of on-line registration requirement for Representations and Certifications is now located in System for Award Management (SAM) database https://www.sam.gov/portal/public/SAM/. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to SAM.



Obtaining Solicitation Documents:


Solicitation documents will be posted to the web via Federal Business Opportunities (www.fbo.gov).


Find solicitation announcement in Fed Biz Opps (www.fbo.gov)
1. Use the ‘Quick Search' to locate the project (by entering the solicitation number) or use the advanced search features offered in the ‘Find Opportunities' (large arrow in the middle of the page) or use the ‘Opportunities' tab followed by the ‘Advanced Search' tab.
2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the right side reading ‘All Files' or from the ‘Packages' tab.
4. If you want other vendors, sub-contractors or contractors to contact you, click on the ‘Interested Vendors' tab and then ‘Add me to Interested Vendors' link at the bottom of the page.


 










Update #1 ·

On or about 14 November 2017, this office will issue Request for Proposals for construction project of the Fort Randall Spillway Expansion Joint & Waterstop Repair, Fort Randall Dam, SD. The solicitation will close on or about 13 December 2017.

This solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION.


A site visit will be on or around 30 November 2017. The site visit time and date will be issued with the solicitation package.


DO NOT submit requests for plans and specifications to the site visit personnel listed above. See ‘Obtaining Solicitation Documents' below.
_______________________________________________________________________________


Project Description: (Approx. quantities)


Concrete removal (partial depth removal between 12" and 18" deep and full depth removal at 18" deep) on both sides of the expansion joint between the pier extension slab and the spillway chute slab across the 1000 LF width of the spillway at Fort Randall Dam, South Dakota. Construction of the proposed expansion joint will consist of removal of existing concrete, waterstop, expansion and sealant material; and installation of new stainless steel angles, waterstops, steel reinforcement, concrete, expansion material, joint seal, and a stainless steel cover plate with hardware. Concrete removal methodology will be limited to methods that minimize microfracturing of the substrate concrete in order to maximize the bonding potential of the proposed material. Set up and operation of an on-site concrete batch plant, with experienced plant operators with NRMCA or ACI certification.


The estimated construction cost of this project is between $4,000,000 and $6,000,000.
_______________________________________________________________________________



The Contractor will be required to commence work within 10 days after notice to proceed and complete the work 270 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required.



Offerors:
Please be advised of on-line registration requirement for Representations and Certifications is now located in System for Award Management (SAM) database https://www.sam.gov/portal/public/SAM/. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to SAM.



Obtaining Solicitation Documents:


Solicitation documents will be posted to the web via Federal Business Opportunities (www.fbo.gov).


Find solicitation announcement in Fed Biz Opps (www.fbo.gov)
1. Use the ‘Quick Search' to locate the project (by entering the solicitation number) or use the advanced search features offered in the ‘Find Opportunities' (large arrow in the middle of the page) or use the ‘Opportunities' tab followed by the ‘Advanced Search' tab.
2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the right side reading ‘All Files' or from the ‘Packages' tab.
4. If you want other vendors, sub-contractors or contractors to contact you, click on the ‘Interested Vendors' tab and then ‘Add me to Interested Vendors' link at the bottom of the page.


 










Files

Show all 11

Notice history

Notice Type Posted
This notice Latest Award Notice
Fort Randall Spillway Project Original Award Notice