Ft. Randall Spillway Expansion Joint and Waterstop Repair
Solicitation number
W9128F-18-R-0007
Issued by

About this file

Drawings for Amendment 0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

48'-0" TYP. PIER EXTENSION SLAB WIDTH

24'-0"24'-0" S

E E S

H E

E T C

P

APPROX. 8'-4", TYP.

M

IN

M

IN 2'-0" TYP.

A P

P R

O X

4'-0" LAP, TYP.

L A

P T

Y P

V A

R

IE

S

T O T

Y P

S E

E S

H E

E T C

P

S E

E S

H E

E T C

P

25'-0" TYP. SPILLWAY SLAB LANE WIDTH

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S I

D

F O

R T R

A N

D A

L L D

A M S

O U

T H D

A K

O T

A

O M

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

W F -1

-R -0

A N

D W

A T

E R

S T

O P R

E P

A

IR

S P

IL

L W

A Y E

X P

A N

S

IO

N J

O

IN

T D

E C

E M

B E

R

NEW #9 BARS @ 12" DRILLED

AND EPOXIED INTO EXISTING

CONCRETE, TYP.

NEW #4 TIES

@ 12", TYP.

NEW #4 TIES

@ 12", TYP.

P

IE

R E

X T E

N S

IO

N C

E N

T E

R L

IN

E

M A

X

M A

X

NEW #4 TIES

@ 12", TYP.

NEW #4 TIES

@ 12", TYP.

NEW #9 @ 12", LAP SPLICED OR

MECHANICALLY BUTT SPLICED

WITH EXISTING REINF, TYP.

SCALE: 1/2" = 1'-0"

TYPICAL REINFORCEMENT PLAN

REQ'D FOR PROJECT)

(APPROX 275 TOTAL

DOWEL, TYP.

NEW #6 VERTICAL

& BOTTOM, TYP.

NEW #7 @ 12" TOP

PVC WATERSTOP.

LOCATION. MAINTAIN EXISTING

TYP. MATCH EXISTING JOINT

SLAB CONSTRUCTION JOINT (CJ),

AT MANDATORY PIER EXTENSION

REINFORCEMENT DISCONTINUOUS

CONCRETE

@ MID-DEPTH OF NEW

#7 BARS W/ 5' RADIUS

2 NEW 10'-0" LONG

THROUGH OPTIONAL CJ

REINFORCEMENT CONTINUOUS

TESTING AND AVOID DRILLING THROUGH IT.

LOCATE EXISTING VERTICAL PIER REINF WITH NONDESTRUCTIVE

TOP LAYER OF #7 BARS DRILLED & EPOXIED 12" INTO PIER EXTENSION.

& BOTTOM, TYP.

NEW #7 @ 12" TOP

JOINT

NEW EXPANSION

NO WATERSTOP REQUIRED.

WITH EXISTING SPILLWAY SLAB LANE JOINTS.

JOINT. WHERE CJ IS USED, IT SHALL ALIGN

OPTIONAL SPILLWAY SLAB CONSTRUCTION

REINFORCEMENT CONTINUOUS THROUGH

TYP.

ANCHOR BAR TO REMAIN,

EXISTING #11 VERTICAL

OF SLAB

TO REMAIN, APPROX MID-DEPTH

EXISTING #9 @ 12" EACH WAY

DOWELS, TYP.

EXISTING VERTICAL

* NOTES:

1. FOR "PARTIAL DEPTH REMOVAL" AREAS SHOWN ON CP102, THE CONTRACTOR MAY LAP SPLICE NEW WITH EXISTING #9 BARS AS

SHOWN ON THIS PLAN VIEW AND SHEET S-501. ALTERNATIVELY, THE CONTRACTOR MAY PROVIDE MECHANICAL BUTT SPLICES

AND REDUCE CONCRETE REMOVAL WIDTH TO A DIMENSION THAT WILL ALLOW SPLICE INSTALLATION, BUT NOT LESS THAN 6".

SEE SHEET S-502 FOR SECTION CUTS WITH REQUIREMENTS FOR THE MECHANICAL BUTT SPLICE OPTION, APPLICABLE ONLY FOR

"PARTIAL DEPTH REMOVAL" AREAS SHOWN ON CP102.

2. FOR "MORTAR REMOVAL" AREAS SHOWN ON CP102, INSTEAD OF REMOVING AND REPLACING CONCRETE AS SHOWN ON SHEET

S-501, THE CONTRACTOR MAY ELECT TO REMOVE AND REPLACE FULL DEPTH SLAB SECTIONS AS SHOWN ON S-503. MECHANICAL

BUTT SPLICES TO EXISTING SLAB REINFORCEMENT WILL BE REQUIRED AT ALL NEW-TO-EXISTING CONCRETE JOINTS

DOWNSTREAM OF THE PIER EXTENSION SLAB EXPANSION JOINT.

DS: NWO_Screen.dscript.dscriptPD: NWO_pdf.pltcfg9:25:06 AM 12/21/2017

...\30500 - Construction E&D\FRF0\30DA0 - Plans & Specs\CAD_BIM\_Sheets\FRF0S-101.dgn

R

F S -1

.d g n

W

B O

E C

K

R E

IN

F O

R C

E M

E N

T P

L A

N

S-101

S D

S

D E

N N

IN

G

W B

F R

D -0

N

0 2' 4'1'

D E

C

A M G

E N

E R

A L R

E V

IS

IO

N S

1, 2 & 3*

S-501-503

C H

U T

E S

L A

B S

P

IL

L W

A Y

6 1/2 "

2" MIN, TYP.

R E

B A

R B

E L

W

M

IN

D E

P T

H T

O T

A L

M

IN

WIDTH VARIES, SEE CP102

18" DEEP REMOVAL:

SEE NOTE 4 AND WIDTHS ON CP102

PARTIAL DEPTH & MORTAR REMOVAL:

FULL DEPTH REMOVAL: 5'-0"

9"

" 1 /4

TABLE

SEE

3/16" 1-1/2"

D E

P T

H

M A

T C

H E

X

IS

T

A P

P R

O X

/4

6 1/2 "

6"

/2

1'-0"

1'-0"

1'-6" MIN1'-0" MIN

1'-0"1'-0"

0% SLOPE

TYP. CONC. REMOVAL SECTION

48" LAP SPLICE. SEE NOTE 4 OF

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S

R T R

A N

D A

L L D

A M S

O U

T H D

A K

O T

A

O M

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

W F -1

-R -0

A N

D W

A T

E R

S T

O P R

E P

A

IR

S P

IL

L W

A Y E

X P

A N

S

IO

N J

O

IN

T D

E C

E M

B E

R

4% SLOPE

PIER BEYOND

NOT TO SCALE

EXISTING

FROST BLANKET

PIER

EXTENSION

SLAB

#9 @ 12"

EXISTING

REMOVE 6" PVC WATERSTOP

REMOVE 3/4" EXPANSION JOINT

EXISTING #7 @ 12"

AND MINIMUM DEPTH SHOWN

REMOVE TO SOUND CONCRETE

TAR PAPER

EXISTING

SAW CUT

FULL DEPTH

EXISTING #4 @ 6"

@ 8'-4"

ANCHOR BARS

EXISTING #11

INITIAL 1-1/2" SAWCUT, TYP.

FINAL 1-1/2" SAWCUT, TYP.

NOTE (TYP.)

DEMOLITION, SEE

DAMAGE DURING

PROTECT EDGE FROM

EXISTING #4 @ 6"

TO REMAIN

DOWELS @ 2'-0"

EXISTING #6

1A

EXISTING #7 @ 12"

TYPICAL CONCRETE REMOVAL SECTION (LAP SPLICE)

SHOWN IN THE CONCRETE REPLACEMENT SECTION BELOW.

5. WHERE REINFORCEMENT SHOWN TO REMAIN IS DAMAGED OR REMOVED DURING DEMOLITION, IT SHALL BE REPLACED AS

S-502 FOR ALTERNATE SECTION CUTS OF THE MECHANICAL BUTT SPLICE OPTION AT "PARTIAL DEPTH REMOVAL" AREAS ONLY.

AND EPOXYING NEW REINFORCEMENT INTO EXISTING CONCRETE WILL NOT BE PERMITTED AT THIS LOCATION. SEE SHEET

CONCRETE REMOVAL WIDTH TO A DIMENSION THAT WILL ALLOW SPLICE INSTALLATION, BUT NOT LESS THAN 6". DRILLING

REINFORCING WITH EXISTING. THE CONTRACTOR MAY INSTEAD PROVIDE MECHANICAL BUTT SPLICES AND REDUCE

4. FOR "PARTIAL DEPTH REMOVAL" AREAS SHOWN ON CP102, 4'-3" IS THE MINIMUM WIDTH REQUIRED TO LAP SPLICE NEW

3. REPLACE AND RE-LEVEL FROST BLANKET MATERIAL AS NECESSARY.

2. DISPOSE OF DEMOLISHED MATERIALS OFF-SITE.

REQUIREMENTS IN SPECIFICATION SECTION 03 01 32.

JAGGED EDGES WILL NOT BE PERMITTED. UTILIZE DOUBLE PERIMETER SAW CUTS TO PROTECT EDGES - SEE FURTHER

1. TOP EDGES OF EXISTING CONCRETE AT DEMOLITION LIMITS SHALL BE STRAIGHT PRIOR TO NEW CONCRETE PLACEMENT.

NOTES:

TO REMAIN

#9 @ 12"

EXISTING

NEW HOOKS TO EXISTING VERTICAL #11 BARS.

CONCRETE FROM EXISTING HOOKS OR CUT AND MECHANICALLY SPLICE

WHILE REMOVING EXISTING CONCRETE SLABS. CHIP AWAY REMAINING

LOCATE AND CHIP/SAW CUT AROUND ANCHOR BARS TO AVOID DAMAGE

TO REMAIN

#9 @ 12"

MID-DEPTH

EXISTING

NOT TO SCALE

A

3/16

NOT TO SCALE

JOINT DETAIL @ PIER EXTENSION SLAB

JOINT DETAIL @ SPILLWAY WALL B

WILL ALLOW DISASSEMBLY WITH HAND TOOLS.

BENEATH SCREW HEADS AND THREADLOCKING COMPOUND THAT

DRIVE @ 12" OC. FOR FINAL ASSEMBLY, APPLY SILICONE SEALANT

3#8" - 16 COUNTERSUNK MACHINE SCREWS W/ INTERNAL HEX

NOTES:

1. ALL STEEL EXPANSION JOINT COMPONENTS SHALL BE TYPE 316 STAINLESS.

2. JOINT IS PERPENDICULAR TO JOINT IN DETAIL A ABOVE AND APPLIES AT

EDGES OF CHUTE SLAB ADJACENT TO SPILLWAY WALL. THIS DETAIL DOES

NOT APPLY UPSTREAM OF THE JOINT IN DETAIL A.

3. SEE JOINT WIDTH REQUIREMENTS ON S-001.

STUDS @ 18" OC, TYP.

1/2" X 4" WELDED

SPONGE RUBBER

JOINT WIDTH

" MAX2

1" MIN AND 42

WEB TO ACCOMMODATE

WATERSTOP WITH TEAR

OR EQUIVALENT PVC

GREENSTREAK MODEL 700

SPONGE RUBBER

SPILLWAY CHUTE SLAB

EXISTING SPILLWAY WALL

MIN @ 12"

ANCHORS EMBEDDED 3"

REUSABLE EXPANSION

1/2" DIA. COUNTERSUNK,

CONCRETE PLACEMENT TO ENSURE PROPER FIT-UP.

PLATE SHALL BE FASTENED TOGETHER DURING

BETWEEN PLATES. THE UPSTREAM ANGLE AND COVER

10" X 1/2" PLATE IN 12'-0" TYP. LENGTHS W/ 1/4" GAPS

" STEEL BAR8

5"X8

5CONT.

FELT

NONPERFORATED

DOUBLE LAYER 30#

FELT

NONPERFORATED

DOUBLE LAYER 30#

HALF HEX BODY RIVET NUTS (SIMILAR TO NAS1329 STANDARD)

STEEL ANGLES

CONTINUOUS8

3L4X4X

NUT PLACEMENT.

NOT CONFLICT WITH RIVET

18" OC, TYP. STUDS SHALL

1/2" X 4" WELDED STUDS @

BENEATH EACH MACHINE SCREW.

VOID). ADHERE TO ANGLE

WATER FROM ACCUMULATING IN

SCREWS WHILE PREVENTING

ALLOW FUTURE REPLACEMENT OF

RUBBER (OR OTHER MATERIAL TO

" CLOSED CELL SPONGE 2

12x2x1

APPLY CONT. BEAD OF EPOXY SEALANT

INSTALL PER MFR INSTRUCTIONS.

" MAX JOINT WIDTH. 4

1AND 2

SEAL TO ACCOMMODATE 3/4" MIN

WABO EVAZOTE OR EQUIVALENT

WATERSTOP PER MFR INSTRUCTIONS.

SPLICE WITH NEW MODEL 700

IF DAMAGED DURING DEMOLITION.

" MAX JOINT WIDTH)4

3/4" MIN AND 2

581 (WITH TEAR WEB TO ACCOMMODATE

WATERSTOP. REPLACE WITH MODEL

EXISTING GREENSTREAK MODEL 609

ENTIRE SPILLWAY WIDTH, TYP.

STEEL ANGLE ALONG8

34X4x

TABLE

SEE

SLOPE

4%

MANUFACTURER'S INSTRUCTIONS.

" MAX JOINT WIDTH. INSTALL PER 2

1" MIN AND 42

WABO EVAZOTE OR EQUIVALENT SEAL TO ACCOMMODATE

NOTES:

1. ALL STEEL EXPANSION JOINT COMPONENTS SHALL BE TYPE 316 STAINLESS.

2. COVER PLATE LENGTHS SHALL BE AT LEAST 6'-0" BUT NOT GREATER THAN 20'-0".

3. STEEL ANGLES AND COVER PLATES SHALL NOT BE CONTINUOUS THROUGH PIER

EXTENSION SLAB CONSTRUCTION JOINTS UPSTREAM OF THE EXPANSION JOINT.

4. SEE JOINT WIDTH REQUIREMENTS ON SHEET S-001.

A

PIER BEYOND

NOT TO SCALE

EXISTING

FROST BLANKET

MIN

4% SLOPE,

TYP.

4% SLOPE 4% SLOPE

2'-0" MAX 2'-6" MAX

#9 @ 12"

EXISTING

TO REMAIN

DEPTH #9 @ 12"

EXISTING MID-

PLACEMENTS

SEPARATE CONCRETE

CHUTE SLAB

SPILLWAY

@ 8'-4"

ANCHOR BARS

EXISTING #11

LAP SPLICES.

@ 12", T&B. USE 48"

NEW CONT. #7 BARS

FELT

NONPERFORATED

DOUBLE LAYER 30#

3/8" R

NEW #9 BARS @ 12"

NEW #4 @ 6"

WIDTH

ALONG SPILLWAY

DOWELS @ 24"

NEW #6 HOOKED

TOP & BOTTOM

NEW #7 @ 12",

CONCRETE

INTO EXISTING

DRILLED & EPOXIED

NEW #9 @ 12"

1B

@ 12"

NEW #4 TIES

TYPICAL CONCRETE REPLACEMENT SECTION (LAP SPLICE)

NOTE:

CONTRACTOR SHALL GRIND STAINLESS STEEL ANGLES TO CREATE THE NECESSARY BONDING SURFACE FOR THE JOINT SEAL. MATERIALS

TO CUT, DRILL, GRIND, OR BLAST STAINLESS STEEL SHALL BE FREE OF IRON, SULFUR, AND CHLORINE. SEE FURTHER REQUIREMENTS IN

SPECIFICATION SECTION 03 15 00.00 10.

CONCRETE, TYP.

12" INTO EXISTING

EPOXY NEW BARS

REMOVED BY DEMO.

REPLACE IF DAMAGED/

REMAIN, OR

BARS @ 2'-0" TO

EXISTING #6 VERT.

BARS

#6 & #11 VERT.

TO ALL EXIST.

2 COATS EPOXY

FIELD APPLY

DS: NWO_Screen.dscript.dscriptPD: NWO_pdf.pltcfg9:27:51 AM 12/21/2017

...\30500 - Construction E&D\FRF0\30DA0 - Plans & Specs\CAD_BIM\_Sheets\FRF0S-501.dgn

F S -5

.d g n

W

B O

E C

K

S T

R U

C T

U R

A L D

E T

A

IL

S

S-501

W

B O

E C

K

S

D E

N N

IN

G

J

O S

B O

R N /S

D E

N N

IN

G

F R

D -0

ADVERTISEMENT

D E

C

A M G

E N

E R

A L R

E V

IS

IO

N S

6 1/2 "

6"

1'-0"

1'-6" MIN1'-0" MIN

/2

1'-0"

0% SLOPE

1'-0"1'-0"

C H

U T

E S

L A

B S

P

IL

L W

A Y

6 1/2 "

WIDTH VARIES, SEE CP102

18" DEEP REMOVAL:

FULL DEPTH REMOVAL: 5'-0"

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S

R T R

A N

D A

L L D

A M S

O U

T H D

A K

O T

A

O M

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

W F -1

-R -0

A N

D W

A T

E R

S T

O P R

E P

A

IR

S P

IL

L W

A Y E

X P

A N

S

IO

N J

O

IN

T D

E C

E M

B E

R

A

PIER BEYOND

NOT TO SCALE

EXISTING

FROST BLANKET

MIN

4% SLOPE,

TYP.

4% SLOPE 4% SLOPE

2'-0" MAX 2'-6" MAX

#9 @ 12"

EXISTING

TO REMAIN

CHUTE SLAB

SPILLWAY

@ 8'-4"

ANCHOR BARS

EXISTING #11

LAP SPLICES.

@ 12", T&B. USE 48"

NEW CONT. #7 BARS

FELT

NONPERFORATED

DOUBLE LAYER 30#

3/8" R

NEW #4 @ 6"

WIDTH

ALONG SPILLWAY

DOWELS @ 24"

NEW #6 HOOKED

TOP & BOTTOM

NEW #7 @ 12",

CONCRETE

INTO EXISTING

DRILLED & EPOXIED

NEW #9 @ 12"

2BTYPICAL CONCRETE REPLACEMENT SECTION (MECHANICAL SPLICE)

AND NEW #9 BARS @ 12"

MECHANICAL BUTT SPLICE

CONCRETE SURFACE

RECESS IN EXISTING

GRIND CONTINUOUS

@ 12"

NEW #4 TIES

S-501

NOTE:

CONTRACTOR SHALL GRIND STAINLESS STEEL ANGLES TO CREATE THE NECESSARY BONDING SURFACE FOR THE JOINT SEAL. MATERIALS

TO CUT, DRILL, GRIND, OR BLAST STAINLESS STEEL SHALL BE FREE OF IRON, SULFUR, AND CHLORINE. SEE FURTHER REQUIREMENTS IN

SPECIFICATION SECTION 03 15 00.00 10.

CONCRETE, TYP.

12" INTO EXISTING

EPOXY NEW BARS

REMOVED BY DEMO.

REPLACE IF DAMAGED/

REMAIN, OR

BARS @ 2'-0" TO

EXISTING #6 VERT.

BARS

#6 & #11 VERT.

TO ALL EXIST.

2 COATS EPOXY

FIELD APPLY

4% SLOPE

PIER BEYOND

NOT TO SCALE

EXISTING

FROST BLANKET

PIER

EXTENSION

SLAB

EXISTING #7 @ 12"

TAR PAPER

EXISTING

SAW CUT

FULL DEPTH

EXISTING #4 @ 6"

@ 8'-4"

ANCHOR BARS

EXISTING #11

NOTE (TYP.)

DEMOLITION, SEE

DAMAGE DURING

PROTECT EDGE FROM

#9 @ 12"

EXISTING

EXISTING #4 @ 6"

TO REMAIN

DOWELS @ 2'-0"

EXISTING #6

2A

TO REMAIN

#9 @ 12"

MID-DEPTH

EXISTING

EXISTING #7 @ 12"

TYPICAL CONCRETE REMOVAL SECTION (MECHANICAL SPLICE)

SHOWN IN THE CONCRETE REPLACEMENT SECTION BELOW.

5. WHERE REINFORCEMENT SHOWN TO REMAIN IS DAMAGED OR REMOVED DURING DEMOLITION, IT SHALL BE REPLACED AS

REQUIREMENTS FOR THE LAP SPLICE OPTION ON SHEET S-501.

AND EPOXYING NEW REINFORCEMENT INTO EXISTING CONCRETE WILL NOT BE PERMITTED AT THIS LOCATION. SEE

CONCRETE REMOVAL WIDTH TO A DIMENSION THAT WILL ALLOW SPLICE INSTALLATION, BUT NOT LESS THAN 6". DRILLING

REINFORCING WITH EXISTING. THE CONTRACTOR MAY INSTEAD PROVIDE MECHANICAL BUTT SPLICES AND REDUCE

4. FOR "PARTIAL DEPTH REMOVAL" AREAS SHOWN ON CP102, 4'-3" IS THE MINIMUM WIDTH REQUIRED TO LAP SPLICE NEW

3. REPLACE AND RE-LEVEL FROST BLANKET MATERIAL AS NECESSARY.

2. DISPOSE OF DEMOLISHED MATERIALS OFF-SITE.

REQUIREMENTS IN SPECIFICATION SECTION 03 01 32.

JAGGED EDGES WILL NOT BE PERMITTED. UTILIZE DOUBLE PERIMETER SAW CUTS TO PROTECT EDGES - SEE FURTHER

1. TOP EDGES OF EXISTING CONCRETE AT DEMOLITION LIMITS SHALL BE STRAIGHT PRIOR TO NEW CONCRETE PLACEMENT.

NOTES:

BUTT SPLICES, NOT LESS THAN 6". SEE NOTE 4.

WIDTH AS REQUIRED TO INSTALL MECHANICAL

EXISTING REINFORCEMENT INTACT. REMOVAL

REMOVE CONCRETE TO FULL DEPTH BUT LEAVE

REMOVE

NEW HOOKS TO EXISTING VERTICAL #11 BARS.

CONCRETE FROM EXISTING HOOKS OR CUT AND MECHANICALLY SPLICE

WHILE REMOVING EXISTING CONCRETE SLABS. CHIP AWAY REMAINING

LOCATE AND CHIP/SAW CUT AROUND ANCHOR BARS TO AVOID DAMAGE

DS: NWO_Screen.dscript.dscriptPD: NWO_pdf.pltcfg9:33:39 AM 12/21/2017

...\30500 - Construction E&D\FRF0\30DA0 - Plans & Specs\CAD_BIM\_Sheets\FRF0S-502.dgn

F S -5

.d g n

W

B O

E C

K

S T

R U

C T

U R

A L D

E T

A

IL

S

S-502

S D

S

D E

N N

IN

G

W B

F R

D -0

D E

C

A M G

E N

E R

A L R

E V

IS

IO

N S

6 1/2 "

WIDTH VARIES, SEE CP102

18" DEEP REMOVAL:

C H

U T

E S

L A

B S

P

IL

L W

A Y

SEE MORTAR REMOVAL DIMENSIONS ON CP102

6 1/2 "

6"

1'-0"

1'-6" MIN1'-0" MIN

/2

1'-0"

0% SLOPE

1'-0"1'-0"

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

A N

S

R T R

A N

D A

L L D

A M S

O U

T H D

A K

O T

A

O M

A H

A

N E

C

A P

IT

O L A

V E

O M

A H

A D

IS

T R

IC

T

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

W F -1

-R -0

A N

D W

A T

E R

S T

O P R

E P

A

IR

S P

IL

L W

A Y E

X P

A N

S

IO

N J

O

IN

T D

E C

E M

B E

R

4% SLOPE

PIER BEYOND

NOT TO SCALE

EXISTING

FROST BLANKET

PIER

EXTENSION

SLAB

EXISTING #7 @ 12"

TAR PAPER

EXISTING

SAW CUT

FULL DEPTH

EXISTING #4 @ 6"

@ 8'-4"

ANCHOR BARS

EXISTING #11

NOTE (TYP.)

DEMOLITION, SEE

DAMAGE DURING

PROTECT EDGE FROM

#9 @ 12"

EXISTING

EXISTING #4 @ 6"

TO REMAIN

DOWELS @ 2'-0"

EXISTING #6

3A

TO REMAIN

#9 @ 12"

MID-DEPTH

EXISTING

EXISTING #7 @ 12"

BUTT SPLICES, NOT LESS THAN 6". SEE NOTE 4.

WIDTH AS REQUIRED TO INSTALL MECHANICAL

EXISTING REINFORCEMENT INTACT. REMOVAL

REMOVE CONCRETE TO FULL DEPTH BUT LEAVE

NEW HOOKS TO EXISTING VERTICAL #11 BARS.

CONCRETE FROM EXISTING HOOKS OR CUT AND MECHANICALLY SPLICE

WHILE REMOVING EXISTING CONCRETE SLABS. CHIP AWAY REMAINING

LOCATE AND CHIP/SAW CUT AROUND ANCHOR BARS TO AVOID DAMAGE

TYPICAL CONCRETE REMOVAL SECTION (MECHANICAL SPLICE - MORTAR REMOVAL AREA)1

SHOWN IN THE CONCRETE REPLACEMENT SECTION BELOW.

5. WHERE REINFORCEMENT SHOWN TO REMAIN IS DAMAGED OR REMOVED DURING DEMOLITION, IT SHALL BE REPLACED AS

REINFORCEMENT INTO EXISTING CONCRETE WILL NOT BE PERMITTED AT THESE LOCATIONS.

CONCRETE JOINTS DOWNSTREAM OF THE PIER EXTENSION SLAB EXPANSION JOINT. DRILLING AND EPOXYING NEW

SHEET. MECHANICAL BUTT SPLICES TO EXISTING SLAB REINFORCEMENT WILL BE REQUIRED AT ALL NEW-TO-EXISTING

SHEET S-501, THE CONTRACTOR MAY ELECT TO REMOVE AND REPLACE FULL DEPTH SLAB SECTIONS AS SHOWN ON THIS

4. FOR "MORTAR REMOVAL" AREAS SHOWN ON CP102, INSTEAD OF REMOVING AND REPLACING CONCRETE AS SHOWN ON

3. REPLACE AND RE-LEVEL FROST BLANKET MATERIAL AS NECESSARY.

2. DISPOSE OF DEMOLISHED MATERIALS OFF-SITE.

REQUIREMENTS IN SPECIFICATION SECTION 03 01 32.

JAGGED EDGES WILL NOT BE PERMITTED. UTILIZE DOUBLE PERIMETER SAW CUTS TO PROTECT EDGES - SEE FURTHER

1. TOP EDGES OF EXISTING CONCRETE AT DEMOLITION LIMITS SHALL BE STRAIGHT PRIOR TO NEW CONCRETE PLACEMENT.

NOTES:

A

PIER BEYOND

NOT TO SCALE

EXISTING

FROST BLANKET

MIN

4% SLOPE,

TYP.

4% SLOPE 4% SLOPE

2'-0" MAX 2'-6" MAX

#9 @ 12"

EXISTING

TO REMAIN

CHUTE SLAB

SPILLWAY

@ 8'-4"

ANCHOR BARS

EXISTING #11

LAP SPLICES.

@ 12", T&B. USE 48"

NEW CONT. #7 BARS

FELT

NONPERFORATED

DOUBLE LAYER 30#

3/8" R

NEW #4 @ 6"

WIDTH

ALONG SPILLWAY

DOWELS @ 24"

NEW #6 HOOKED

TOP & BOTTOM

NEW #7 @ 12",

CONCRETE

INTO EXISTING

DRILLED & EPOXIED

NEW #9 @ 12"

3B

S-501

NOTE:

CONTRACTOR SHALL GRIND STAINLESS STEEL ANGLES TO CREATE THE NECESSARY BONDING SURFACE FOR THE JOINT SEAL. MATERIALS

TO CUT, DRILL, GRIND, OR BLAST STAINLESS STEEL SHALL BE FREE OF IRON, SULFUR, AND CHLORINE. SEE FURTHER REQUIREMENTS IN

SPECIFICATION SECTION 03 15 00.00 10.

CONCRETE, TYP.

12" INTO EXISTING

EPOXY NEW BARS

REMOVED BY DEMO.

REPLACE IF DAMAGED/

REMAIN, OR

BARS @ 2'-0" TO

EXISTING #6 VERT.

TYPICAL CONCRETE REPLACEMENT SECTION (MECHANICAL SPLICE - MORTAR REMOVAL AREA)1

DOWNSTREAM SURFACE

RECESS IN EXISTING

GRIND CONTINUOUS

CONSISTENT ACROSS SPILLWAY

REINFORCEMENT CAGE SHALL BE

NEW #4 TIES @ 12" - WIDTH OF

BARS @ 12" EACH WAY

AND NEW CONTINUOUS #9

MECHANICAL BUTT SPLICE

WITHIN #4 TIES

FLOW NOT REQ'D

#9 BARS PERP. TO

BARS

#6 & #11 VERT.

TO ALL EXIST.

2 COATS EPOXY

FIELD APPLY

DS: NWO_Screen.dscript.dscriptPD: NWO_pdf.pltcfg9:35:53 AM 12/21/2017

...\30500 - Construction E&D\FRF0\30DA0 - Plans & Specs\CAD_BIM\_Sheets\FRF0S-503.dgn

F S -5

.d g n

S-503

R

D -0

ADVERTISEMENT

E

C

A M

N

E W S

H E

E T A

D D

E D

S T

R U

C T

U R

A L D

E T

A

IL

S

D E

C

A M

N

E W S

H E

E T A

D D

E D

D E

C

A M

N

E W S

H E

E T A

D D

E D

D E

C

A M

N

E W S

H E

E T A

D D

E D

S

D E

N N

IN

G

S

D E

N N

IN

G

W

B O

E C

K

W

B O

E C

K

FRF0-CP102 (AM #0001)
FRF0S-101
FRF0S-501
FRF0S-502
FRF0S-503

File details come from the government source that posted it.