Existing: Greenstreak Model 705
WATERSTOP MATERIALS AND LOCATIONS
(From Contract Drawings - Sheet R-106) Pier Extension Slab Expansion Joint (Replace with Greenstreak 700 or equivalent) Existing Greenstreak 705 to remain or to be spliced & repaired with matching 705 waterstop.
Existing Greenstreak 609 to Remain (If damaged, replace with Greenstreak 581 or equivalent as shown on sheet S-501)
Required Splice Location
480V 100amp 3 phase (Located Inside Building) 480V 100amp 3 phase (Mounted to Exterior of Warehouse) 240V 50amp (Located Inside Warehouse) Previous Location of Power Equipment (Equipment to be removed prior to construction)
NOTES:
1. The buried cable/conduit route shown in the image does not reflect the actual location and is to be used for general information only.
The ‘Power Sources’ listed above will be available for contractor’s use during construction.
The ‘Abandoned Power Cables’ were used by a previous contractor and will be abandoned in place following the completion of that contract. These cables will be available for use during construction. However, USACE makes no guarantee of the location or condition of these cables. The contractor may choose to use these abandoned cables at their own risk or may provide their own services.
Abandoned Cable #1 Abandoned Cable #2 Abandoned Cable #3
POWER SOURCES
ABANDONED POWER CABLES
POWER AVAILABILITY
4/0 Alum.
#2 Alum #2 Alum image1.png image2.jpeg image3.png image4.emf image5.png