Ft. Knox Child Development Center (CDC)
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912QR24R0026
- Agency
- ENDIST Louisville US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Y1NZ Construction Of Other Utilities
- Place of performance
- Fort Knox, Kentucky, United States
- Points of contact
-
- Brandon Gatz brandon.h.gatz@usace.army.mil (502) 315-6571
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers (USACE) Louisville District is issuing a solicitation (W912QR24R0026) for the demolition of an existing preschool and construction of a standard design child development center (CDC) to accommodate 338 preschool children at Fort Knox, Kentucky. The project involves site work, utility connections, building construction, and interior fit-out to create the new CDC facility. Key requirements include compliance with Unified Facilities Criteria (UFC) and other applicable codes/standards, specified technical specifications for materials and systems, and adherence to project schedules. Proposals are due by June 28, 2024 at 1:00 PM Eastern.
This solicitation does not have any set-aside designations and the incumbent contractor is not specified. The contract will be awarded on a firm-fixed-price basis, but the award value or budget range is not provided. The project duration and timeline for services are also not detailed in the documentation. The place of performance is Fort Knox, Kentucky.
Notice text
9 versions
Update #9 · Latest ·
*** Amendment 0004 to address Spec Changes is forth coming**** The proposal due date remains 28 June 2024.****Amendment 0003 to extend the proposal due date to 28 June 2024 at 1:00 P.M. is hereby completed. *** Amendment 0002 to incorporate updated wage rates and to extend the proposal due date has been completed*** Amendment 0001 to incorporate an additional site visit is being completed* The posting will be logged into SAM once completed**The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a (Single Phase Source Selection Evaluation Board) for construction of a Child Development Center at Fort Knox, KY. Demolish an existing pre-school and construct a standard design child development center for 338 pre-school children.
Update #8 ·
*** Amendment 0004 to address Spec Changes is forth coming**** The proposal due date remains 28 June 2024.****Amendment 0003 to extend the proposal due date to 28 June 2024 at 1:00 P.M. is hereby completed. *** Amendment 0002 to incorporate updated wage rates and to extend the proposal due date has been completed*** Amendment 0001 to incorporate an additional site visit is being completed* The posting will be logged into SAM once completed**The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a (Single Phase Source Selection Evaluation Board) for construction of a Child Development Center at Fort Knox, KY. Demolish an existing pre-school and construct a standard design child development center for 338 pre-school children.
Update #7 ·
****Amendment 0003 to extend the proposal due date to 28 June 2024 at 1:00 P.M. is hereby completed. *** Amendment 0002 to incorporate updated wage rates and to extend the proposal due date has been completed*** Amendment 0001 to incorporate an additional site visit is being completed* The posting will be logged into SAM once completed**The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a (Single Phase Source Selection Evaluation Board) for construction of a Child Development Center at Fort Knox, KY. Demolish an existing pre-school and construct a standard design child development center for 338 pre-school children.
Update #6 ·
** Site Visit Roster has been uploaded**
*** Amendment 0002 to incorporate updated wage rates and to extend the proposal due date has been completed*** Amendment 0001 to incorporate an additional site visit is being completed* The posting will be logged into SAM once completed**The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a (Single Phase Source Selection Evaluation Board) for construction of a Child Development Center at Fort Knox, KY. Demolish an existing pre-school and construct a standard design child development center for 338 pre-school children.
Update #5 ·
*** Amendment 0002 to incorporate updated wage rates and to extend the proposal due date has been completed*** Amendment 0001 to incorporate an additional site visit is being completed* The posting will be logged into SAM once completed**The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a (Single Phase Source Selection Evaluation Board) for construction of a Child Development Center at Fort Knox, KY. Demolish an existing pre-school and construct a standard design child development center for 338 pre-school children.
Update #4 ·
*** Amendment 0002 to incorporate updated wage rates and to extend the proposal due date is forth coming*** Amendment 0001 to incorporate an additional site visit is being completed* The posting will be logged into SAM once completed**The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a (Single Phase Source Selection Evaluation Board) for construction of a Child Development Center at Fort Knox, KY. Demolish an existing pre-school and construct a standard design child development center for 338 pre-school children.
Update #3 ·
** Site Visit Roster for site visit held 29 May 2024 has been uploaded***
* Amendment 0001 to incorporate an additional site visit is being completed*** The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a (Single Phase Source Selection Evaluation Board) for construction of a Child Development Center at Fort Knox, KY. Demolish an existing pre-school and construct a standard design child development center for 338 pre-school children.
Update #2 ·
* Amendment 0001 to incorporate an additional site visit is being completed*** The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a (Single Phase Source Selection Evaluation Board) for construction of a Child Development Center at Fort Knox, KY. Demolish an existing pre-school and construct a standard design child development center for 338 pre-school children.
Update #1 ·
The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a (Single Phase Source Selection Evaluation Board) for construction of a Child Development Center at Fort Knox, KY. Demolish an existing pre-school and construct a standard design child development center for 338 pre-school children.
Attachments
| File | Type | Posted |
|---|---|---|
| W912QR24R0026_Plans-0004.pdf | ||
| W912QR24R0026_Specs-0004.pdf | ||
| W912QR24R0026-0003.pdf | ||
| FTK CDC Prebid Site Visit 2 Roster.pdf | ||
| W912QR24R0026-0002.pdf | ||
| FTK CDC Pre-bid Site Visit Roster.pdf | ||
| W912QR24R0026-0001.pdf | ||
| W912QR24R0026_Specs_Vol2-0000.pdf | ||
| W912QR24R0026_Specs_Vol3-0000.pdf | ||
| W912QR24R0026_Plans_Vol2-0000.pdf | ||
| W912QR24R0026_Plans_Vol1-0000.pdf | ||
| W912QR24R0026_Specs_Vol4-0000.pdf | ||
| W912QR24R0026_Specs_Vol1-0000.pdf |
Show all 13
Notice history
| Notice | Type | Posted |
|---|---|---|
| Ft. Knox Child Development Center (CDC) | Award Notice | |
| Ft. Knox Child Development Center (CDC) | Solicitation | |
| Ft. Knox Child Development Center (CDC) | Pre-Solicitation | |
| Construction of a Child Development Center at Fort Knox, KY. | Special Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity