FR Vistor Center Heat Pump

Awarded Award Notice Posted

Solicitation number
W9128F-16-T-E003
Agency
ENDIST Omaha US Army Corps of Engineers, Department of Defense
Awarded
to Electair, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
W9128F-16-M-E003 Federal contract award
NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
Not on record
Place of performance
Fort Randall Project- Visitor Center 399 Powerhouse Road Pickstown, South Dakota 57367, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Added: Aug 03, 2016 4:55 pm Modified: Aug 18, 2016 3:42 pmTrack Changes The contractor shall provide all supplies, materials, equipment and labor to remove and replace existing York Affinity 2S Series Air Conditioner and replace with dual-stage 5-ton Heat Pump, with equal or greater than 15 SEER Rating, and equal to or greater than 8 HSPF, including such items as wiring, system charging, cooper piping, and electrical wiring.  New thermostat will be provided by the contractor. The contractor shall also remove and replace the existing HEIL Air handler 25KW furnance, and replace with new 25kw Air Handler Furnace Unit.  Operational testing, system and termostat programming, training session, and manuals shall be provided by the contractor.  The contractor will be required to connect the new heat pump to an existing control box.  In addition, the Contractor will be required to formally test the HVAC system, lead a training session, and provide operational and maintenance manuals as specified in the contract documents.

Per FAR 36.204, the magnitude of this construction project is under $25,000.00.

Update #1 ·

Added: Aug 03, 2016 4:55 pm The contractor shall provide all supplies, materials, equipment and labor to remove and replace existing York Affinity 2S Series Air Conditioner and replace with dual-stage 5-ton Heat Pump, with equal or greater than 15 SEER Rating, and equal to or greater than 8 HSPF, including such items as wiring, system charging, cooper piping, and electrical wiring.  New thermostat will be provided by the contractor.  Operational testing, system and termostat programming, training session, and manuals shall be provided by the contractor.  The contractor will be required to connect the new heat pump to an existing control box.  In addition, the Contractor will be required to formally test the HVAC system, lead a training session, and provide operational and maintenance manuals as specified in the contract documents.

Attachments

Files attached to this notice, newest first
File Type Posted
SF_30_Amend__2.pdf PDF
Specs_2.pdf PDF
Furnace_Pictures.pdf PDF
Exsisting_Unit_Pictures.pdf PDF
Specs.pdf PDF
SF_18_Solicitation.pdf PDF
Building_Drawings.pdf PDF
REGISTER.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity