REGISTER.pdf

PDF 78 KB Posted

Attached to
FR Vistor Center Heat Pump Federal contract opportunity
Solicitation number
W9128F-16-T-E003
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

About this file

Register

View the file

Other files for this federal contract opportunity

Other files attached to FR Vistor Center Heat Pump, newest first.
File Type Posted
SF_30_Amend__2.pdf PDF
Specs_2.pdf PDF
Furnace_Pictures.pdf PDF
Exsisting_Unit_Pictures.pdf PDF
SF_18_Solicitation.pdf PDF
Specs.pdf PDF
Building_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES

Install Heat Pump at Ft. Randall Dam Visitor Center

01 01 00 SD-01 Preconstruction Submittals

1.22.2Site Supervisor(s)

1.23Project Reporting

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

SD-07 Certificates

1.6.1.5Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

1.7.2.3 GCritical Lift Plan

1.8Activity Hazard Analysis (AHA)

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

Certificate of Compliance

License Certificates

01 78 23 SD-10 Operation and Maintenance

Data

1.3 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.5 GValidation of Training Completion

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES

01 78 36.00 24 SD-11 Closeout Submittals

1.2.5Equipment Warranty Booklet

23 08 00.00 10 SD-02 Shop Drawings

1.5.2.2 GCommissioning Plan

SD-03 Product Data

3.2.1 GPre-Functional Performance Test

Checklists

3.2.2 GFunctional Performance Tests

SD-06 Test Reports

3.3Commissioning Report

SD-07 Certificates

1.5.1Commissioning Firm

1.5.2Commissioning Specialist

23 64 26 SD-03 Product Data

2.5.7 GCalibrated Balancing Valves

2.5.8 GAutomatic Flow Control Valves

2.5.9Pump Discharge Valve

GWater Temperature Mixing Valve

2.5.10 GWater Temperature Regulating

Valves

2.5.11Water Pressure Reducing Valve

2.5.12Pressure Relief Valve

2.5.13Combination Pressure and

Temperature Relief Valves

2.6.8 GExpansion Joints

2.7 GPumps

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES

23 64 26 2.6.3Combination Strainer and Pump

Suction Diffuser

2.8Expansion Tanks

Air Separator Tanks

GWater Treatment Systems

SD-06 Test Reports

GPressure Tests Reports

GCondenser Water Quality Test

Reports

SD-07 Certificates

Piping for High-Pressure

Compressed-Air Systems

SD-08 Manufacturer’s Instructions

GLesson plan for the Instruction

Course

SD-10 Operation and Maintenance

Data

GWater Treatment Systems

2.5.7 GCalibrated Balancing Valves

2.5.8 GAutomatic Flow Control Valves

2.5.9 GPump Discharge Valve

GWater Temperature Mixing Valve

2.5.10 GWater Temperature Regulating

Valves

2.5.11 GWater Pressure Reducing Valve

2.5.12 GPressure Relief Valve

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES

23 64 26 2.5.13 GCombination Pressure and

Temperature Relief Valves

2.6.8 GExpansion Joints

2.7 GPumps

2.6.3 GCombination Strainer and Pump

Suction Diffuser

2.8 GExpansion Tanks

GAir Separator Tanks

23 81 47 SD-02 Shop Drawings

1.4.6 GSystem Diagrams

GWell and Piping System Layout

Drawings

SD-03 Product Data

2.2.1 GWater-Source Water-to-Air Heat

Pumps

2.1.2Refrigerants

GPipe, Fittings, and Piping

Components

2.5.8 GAir Separators

GU-Bend Assemblies

SD-06 Test Reports

3.13.5.2 GWater-Source Water-To-Air Heat

Pumps - Field Acceptance Test

Plan

3.13.5.2 GClosed Circuit Coolers - Field

Acceptance Test Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES

23 81 47 3.13.5.3 GWater-Source Water-To-Air Heat

Pumps - Field Acceptance Test

Report

3.13.5.3 GClosed Circuit Coolers - Field

Acceptance Test Report

SD-07 Certificates

2.2.1 GARI/ISO Performance Data For

Water Source Heat Pumps

GSystem Designer

SD-08 Manufacturer’s Instructions

3.2.1Water-Source Water-To-Air Heat

Pumps - Installation Instructions

3.13.7 GON-SITE TRAINING

SD-10 Operation and Maintenance

Data

2.2.1 GWater-source water-to-air heat

pumps

2.2.2 GClosed Circuit Coolers

SD-11 Closeout Submittals

3.2.1 GAs-Built Drawings

2.1.1 SEnergy Efficient Equipment for

Water Source Heat Pump Systems and Ground Source Closed-loop

Heat Pump Systems

2.1.2 SOzone Depleting Substances

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES

23 81 47 3.1.1 SIndoor Air Quality During

Construction

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .