REGISTER.pdf
PDF 78 KB Posted
- Attached to
- FR Vistor Center Heat Pump Federal contract opportunity
- Solicitation number
- W9128F-16-T-E003
About this file
Register
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF_30_Amend__2.pdf | ||
| Specs_2.pdf | ||
| Furnace_Pictures.pdf | ||
| Exsisting_Unit_Pictures.pdf | ||
| SF_18_Solicitation.pdf | ||
| Specs.pdf | ||
| Building_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES
Install Heat Pump at Ft. Randall Dam Visitor Center
01 01 00 SD-01 Preconstruction Submittals
1.22.2Site Supervisor(s)
1.23Project Reporting
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
SD-07 Certificates
1.6.1.5Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
Certificate of Compliance
License Certificates
01 78 23 SD-10 Operation and Maintenance
Data
1.3 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.5 GValidation of Training Completion
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES
01 78 36.00 24 SD-11 Closeout Submittals
1.2.5Equipment Warranty Booklet
23 08 00.00 10 SD-02 Shop Drawings
1.5.2.2 GCommissioning Plan
SD-03 Product Data
3.2.1 GPre-Functional Performance Test
Checklists
3.2.2 GFunctional Performance Tests
SD-06 Test Reports
3.3Commissioning Report
SD-07 Certificates
1.5.1Commissioning Firm
1.5.2Commissioning Specialist
23 64 26 SD-03 Product Data
2.5.7 GCalibrated Balancing Valves
2.5.8 GAutomatic Flow Control Valves
2.5.9Pump Discharge Valve
GWater Temperature Mixing Valve
2.5.10 GWater Temperature Regulating
Valves
2.5.11Water Pressure Reducing Valve
2.5.12Pressure Relief Valve
2.5.13Combination Pressure and
Temperature Relief Valves
2.6.8 GExpansion Joints
2.7 GPumps
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES
23 64 26 2.6.3Combination Strainer and Pump
Suction Diffuser
2.8Expansion Tanks
Air Separator Tanks
GWater Treatment Systems
SD-06 Test Reports
GPressure Tests Reports
GCondenser Water Quality Test
Reports
SD-07 Certificates
Piping for High-Pressure
Compressed-Air Systems
SD-08 Manufacturer’s Instructions
GLesson plan for the Instruction
Course
SD-10 Operation and Maintenance
Data
GWater Treatment Systems
2.5.7 GCalibrated Balancing Valves
2.5.8 GAutomatic Flow Control Valves
2.5.9 GPump Discharge Valve
GWater Temperature Mixing Valve
2.5.10 GWater Temperature Regulating
Valves
2.5.11 GWater Pressure Reducing Valve
2.5.12 GPressure Relief Valve
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES
23 64 26 2.5.13 GCombination Pressure and
Temperature Relief Valves
2.6.8 GExpansion Joints
2.7 GPumps
2.6.3 GCombination Strainer and Pump
Suction Diffuser
2.8 GExpansion Tanks
GAir Separator Tanks
23 81 47 SD-02 Shop Drawings
1.4.6 GSystem Diagrams
GWell and Piping System Layout
Drawings
SD-03 Product Data
2.2.1 GWater-Source Water-to-Air Heat
Pumps
2.1.2Refrigerants
GPipe, Fittings, and Piping
Components
2.5.8 GAir Separators
GU-Bend Assemblies
SD-06 Test Reports
3.13.5.2 GWater-Source Water-To-Air Heat
Pumps - Field Acceptance Test
Plan
3.13.5.2 GClosed Circuit Coolers - Field
Acceptance Test Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES
23 81 47 3.13.5.3 GWater-Source Water-To-Air Heat
Pumps - Field Acceptance Test
Report
3.13.5.3 GClosed Circuit Coolers - Field
Acceptance Test Report
SD-07 Certificates
2.2.1 GARI/ISO Performance Data For
Water Source Heat Pumps
GSystem Designer
SD-08 Manufacturer’s Instructions
3.2.1Water-Source Water-To-Air Heat
Pumps - Installation Instructions
3.13.7 GON-SITE TRAINING
SD-10 Operation and Maintenance
Data
2.2.1 GWater-source water-to-air heat
pumps
2.2.2 GClosed Circuit Coolers
SD-11 Closeout Submittals
3.2.1 GAs-Built Drawings
2.1.1 SEnergy Efficient Equipment for
Water Source Heat Pump Systems and Ground Source Closed-loop
Heat Pump Systems
2.1.2 SOzone Depleting Substances
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES
23 81 47 3.1.1 SIndoor Air Quality During
Construction
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .