Fort Pierce Shore Protection Project, Beach Renourishment 2018

Award Notice Posted

Solicitation number
GROUP4-10-R-J041
Agency
Awarded
to Great Lakes Dredge & Dock Co, LLC
Set-aside
No set-aside

Opportunity facts

Contract number
W912EP-13-D-0007-W912EP18F0026 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
St. Lucie County, Florida, United States

Notice details come from SAM.gov. Updated .

Notice text

THIS NOTICE IS POSTED FOR INFORMATIONAL PURPOSES ONLY: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER(S)

For GROUP 4 use: W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003); Cavache, Inc. (W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005); Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP-13-D-0007); Dutra Dredging Company (W912EP-13-D-0008); Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13-D-0010); Mike Hooks, Inc. (W912EP-13-D-0011); Weeks Marine, Inc. (W912EP-13-D-0012); Southern Dredging Co., Inc. (W912EP-13-D-0013); Manson Construction Company (W912EP-13-D-0014); C. F. Bean LLC (W912EP-13-D-0015)


PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 4 DREDGING MATOC POOL.


DESCRIPTION OF WORK: Project work consists of a base and two options. Project work includes renourishing a beach berm to an elevation +7.4 feet NAVD88 (with additional +1 foot tolerance allowed) as well as restoring dune to elevation +11.0 feet NAVD88 (with additional +0.5 foot tolerance allowed) with width varying relatively to the established CBL. The Base berm renourishment work is between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 and R-38 while the dune restoration is between FDEP Range Monuments R-34 and R-36. The Option A berm renourishment work is between FDEP Range Monuments R-38 and R-39A. The Option B berm renourishment work is between FDEP Range Monuments R-39A and R-41. A permitted offshore borrow area known as Capron Shoal for the project is located approximately 4 nautical miles southeast of the project site. Due to the extensive hard bottom areas located offshore of the fill template area, offshore pipeline access to the beach site is prohibited.

Magnitude of construction is between $5,000,000.00 and $10,000,000.00.


The request for proposal will be issued on 28 SEPTEMBER 2017 and proposals will be due on or about 14 NOVEMBER 2017. The award of the task order will be made on the basis of Lowest Price Technical Acceptable (LPTA) or Best Value Trade-Off; for LPTA the technical evaluation factors are availability of technically acceptable plant and equipment and past performance. Districts can contact the Jacksonville District regarding contractors' performance under the MATOC and/or check contractors' past performance on PPIRS (CCASS). See attached request for proposal for submission requirements.


The request for proposal will be issued in electronic format only and will be posted on the Army Single Face to Industry (ASFI) website at https://acquisition.army.mil/asfi/. In order to receive notification of any amendments, firms must REGISTER TO RECEIVE NOTIFICATION on the Federal Business Opportunities website at http://www.fedbizopps.gov/. If you are not registered, the Government is not responsible with providing you with notification of any changes to this solicitation. NAICS Code 237990, size standard $20 million.

Files

File Type Posted
GROUP4-10-R-J041_Revision_0002.pdf PDF
GROUP4-10-R-J041_Revision_0001.pdf PDF
15-043_Capron_Shoal_3ft_ALL.xyz XYZ file
5304-29_FT_PIERCE_1FT_DATA.xyz XYZ file
Ft_Pierce_SPP_FY17_GDR-final.pdf PDF
G4J041Specifications.pdf PDF
113090_Fort_Pierce_FY18_20170921.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity