GROUP4-10-R-J041_Revision_0002.pdf

PDF 992 KB Posted

Attached to
Fort Pierce Shore Protection Project, Beach Renourishment 2018
Solicitation number
GROUP4-10-R-J041
Issued by

About this file

Revision 0002

View the file

Other files

File Type Posted
15-043_Capron_Shoal_3ft_ALL.xyz XYZ file
GROUP4-10-R-J041_Revision_0001.pdf PDF
5304-29_FT_PIERCE_1FT_DATA.xyz XYZ file
113090_Fort_Pierce_FY18_20170921.pdf PDF
Ft_Pierce_SPP_FY17_GDR-final.pdf PDF
G4J041Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUP4-10-R-J041 SF 1442-A1 Revision 0002

ADDENDUM TO THE STANDARD FORM 1442

Fort Pierce Shore Protection Project, Beach Renourishment 2018, St. Lucie County, Florida

SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING

CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER

W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003); Cavache, Inc.

(W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005);

Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP-13-D-0007); Dutra Dredging Company (W912EP-13-D-0008);

Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13- D-0010); Mike Hooks, Inc. (W912EP-13-D-0011); Weeks Marine, Inc. (W912EP-13-D-0012);

Southern Dredging Co., Inc. (W912EP-13-D-0013); Manson Construction Company (W912EP-13-D-0014); C. F. Bean LLC (W912EP-13-D-0015) PROPOSALS WILL NOT BE

CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS

INCLUDED IN THE Group 4 Dredging MATOC Pool.

TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:

(1) Availability of technically acceptable dredge(s).

(2) Past performance, to include the MATOC (The government reserves the right to obtain copies of all Contractor Performance Assessment Reporting System (CPARS) records contained in the US Army Corps of Engineers CPARS database for the Prime Contractor (Offeror) and all Major Sub-Contractors).

SUBMISSION REQUIREMENTS: Contractors are required to submit the following:

(1) A letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.

(2) Completed Bid Schedule (see Section 00010A)

(3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph 2.4(c) of the MATOC

(4) Completed “Addendum to the Standard Form 1442 with the latest revision”.

(5) Revisions – Offers must acknowledge receipt of this Revision by completing “Notice to Offerors--Blocks 14, 15 and 20” of each revision.

THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:

Block 9 -- For additional information contact:

Claurice M. Dingle 904-232-1387 Claurice.m.dingle@usace.army.mil.

Block 10 -- Magnitude of Construction is between $5,000,000.00 and $10,000,000.00.

GROUP4-10-R-J041 SF 1442-A2 Revision 0002

Block 11 -- The Contractor shall begin performance within 45 calendar days and complete it within 110 calendar days after receiving notice to proceed. This performance period is mandatory. NOTE: If there are optional line items, refer to FAR 52.211-10 for breakdown of period of performance.

Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.

Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than November 14, 2017, at 2:00 P.M. EST.

USA Engineer District, Jacksonville

Contracting Division 701 San Marco Blvd Jacksonville, Florida 32207-8175

NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below:

Block 14 -- Name and Address of Offeror (including Zip Code):

DUNS: ___________________ CAGE: _________________

Block 15 -- Telephone No. (include area code): _______________________

Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print):

Type/Print ________________________________________________

Signature: ________________________________________________ e-Mail: ________________________________________________

Offer Date: _______________________________________________

Block 26 -- This Task Order will be administered by:

South Florida Area Office

4400 PGA Blvd Suite 203 Palm Beach, FL 33410

Block 27 -- Payment will be made by:

USACE Finance Center 5722 Integrity Drive

ATTN: CEFC-AO-P

Millington, TN 38054-5005

SF 30 CONTINUATION SHEET

Fort Pierce Shore Protection Project Beach Renourishment 2018

GROUP4-10-R-J041 2 Revision 0002

SUMMARY OF CHANGES

1. SPECIFICATIONS:

The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.

Changes to Specifications:

DELETE unsigned Design Authentication and REPLACE with the attached signed Design Authentication.

DELETE Section 01 22 00 and REPLACE with the attached revised Section 01 22 00.

DELETE Submittal Register and REPLACE with the attached revised Submittal Register.

DELETE Section 01 57 20 and REPLACE with the attached revised Section 01 57 20.

DELETE Section 35 20 25 and REPLACE with the attached revised Section 35 20 25.

2. DRAWINGS: No change to drawings.

(End of Summary of Changes)

Revision 0002

For t Pi er ce Shor e Pr ot ect i on Pr oj ect GROUP4-10-R-J041 Beach Renour i shment 2018

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 SUMMARY

1. 1. 1 Ref er ence

1. 2 QUALI TY CONTROL SYSTEM ( QCS)

1. 2. 1 Def i ni t i on

1. 2. 2 I nst r uct i ons

1. 3 DEFI NI TI ONS

1. 3. 1 Compensat i ng Sl opes

1. 4 SUBMI TTALS

1. 5 JOB PAYMENT I TEMS

1. 5. 1 Mobi l i zat i on and Demobi l i zat i on ( Li ne I t em 0001)

1. 5. 2 Const r uct i on/ Vi br at i on Cont r ol s & Moni t or i ng ( Li ne I t ems 0007, 0018 and 0026)

1. 5. 3 Envi r onment al Speci es Moni t or i ng ( Li ne I t ems 0008, 0019 and

0027)

1. 5. 4 Tur bi di t y Moni t or i ng ( Li ne I t ems 0009, 0020 and 0028)

1. 5. 5 Mobi l i zat i on and Demobi l i zat i on f or Non- Capt ur e Sea Tur t l e

Tr awl Sweepi ng ( Hopper Dr edge Onl y) ( Li ne I t em 0010)

1. 6 UNI T PRI CE PAYMENT I TEMS

1. 6. 1 Beach Fi l l ( Li ne I t ems 0002, 0013 and 0021)

1. 6. 1. 1 Payment

1. 6. 1. 2 Measur ement

1. 6. 1. 3 Uni t of Measur e

1. 6. 2 Scr eeni ng ( Li ne I t ems 0003, 0014 and 0022) )

1. 6. 2. 1 Payment

1. 6. 2. 2 Measur ement

1. 6. 2. 3 Uni t of Measur e

1. 6. 3 Beach Ti l l i ng ( Li ne I t ems 0004, 0015 and 0023)

1. 6. 3. 1 Payment

1. 6. 3. 2 Measur ement

1. 6. 3. 3 Uni t of Measur e

1. 6. 4 Remedi at i on of Noncompl i ant Mat er i al ( Li ne I t ems 0005, 0016 and 0024)

1. 6. 4. 1 Payment

1. 6. 4. 2 Measur ement

1. 6. 4. 3 Uni t of Measur e

1. 6. 5 Tr anspor t at i on and Di sposal of Unaccept abl e Mat er i al ( Li ne

I t ems 0006, 0017 and 0025)

1. 6. 5. 1 Payment

1. 6. 5. 2 Measur ement

1. 6. 5. 3 Uni t of Measur e

1. 6. 6 Sea Tur t l e Non- Capt ur e Tr awl Sweepi ng ( Hopper Dr edge

Onl y) ( Li ne I t em 0011)

1. 6. 6. 1 Payment

1. 6. 6. 2 Measur ement

SECTI ON 01 22 00 Page 1 Revi s i on 0002

1. 6. 6. 3 Uni t of Measur e

1. 6. 7 St andby Ti me ( Base Li ne I t em 0012)

1. 6. 7. 1 Measur ement and Payment

1. 6. 7. 2 Uni t of Measur e

PART 2 PRODUCTS ( NOT APPLI CABLE)

PART 3 EXECUTI ON

3. 1 PAYMENT PROCEDURES

3. 1. 1 Request i ng Pr ogr ess Payment

3. 1. 2 Opt i ons and Modi f i cat i on CLI NS

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 22 00 Page 2 Revi s i on 0002

SECTI ON 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on descr i bes how Li ne I t ems wi l l be measur ed and pai d f or when maki ng pr ogr ess payment s. Wor k t o be measur ed i s descr i bed i n speci f i cat i on sect i ons l i s t ed f or each Li ne I t em. Measur ement pr ocedur es f or payment , r equi r ed quant i t y sur vey or pr ocur ement document at i on and payment r est r i ct i ons ar e descr i bed i n appl i cabl e speci f i cat i on sect i ons.

Al l ocat e cost s f or wor k not speci f i cal l y ment i oned t o t he Li ne I t em most c l osel y associ at ed wi t h wor k i nvol ved. Unl ess t her e i s a speci f i c Li ne I t em f or admi ni st r at i ve cost s, such as Qual i t y Cont r ol and Saf et y, al l ocat e such cost s pr opor t i onal l y acr oss al l Li ne I t ems.

1. 1. 1 Reference

The publ i cat i on l i s t ed bel ow f or ms a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. Thi s publ i cat i on i s r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 1110- 2- 1003 ( 2013) Engi neer i ng and Desi gn, Hydr ogr aphi c Sur veyi ng

1. 2 QUALI TY CONTROL SYSTEM ( QCS)

1. 2. 1 Definition

The t er ms " Cont r act Li ne I t em Number ( CLI N) " and " Li ne I t em" ar e i nt er changeabl e her ei n ( e. g. : CLI N 0001 i s Li ne I t em 0001) . The t er m " CLI N" i s a cont r act i ng t er m used i n t he Qual i t y Cont r ol Syst em ( QCS) payment dat a base.

1. 2. 2 Instructions

See Sect i on 01 45 05 DREDGI NG/ BEACH FI LL PLACEMENT - CONTRACTOR QUALI TY CONTROL f or i nst r uct i ons on l i nki ng a CLI N t o a schedul e of val ues of pay act i v i t i es and const r uct i on schedul e, and i n- dept h payment pr ocedur e.

1. 3 DEFINITIONS

1. 3. 1 Compensat i ng Sl opes

The al l owance f or mat er i al t o be pl aced above t he speci f i ed f i l l t ol er ance t o compensat e f or t he speci f i ed f or eshor e s l ope bei ng bel ow gr ade due t o sedi ment r el ocat ed by nat ur al f or ces bet ween t he t i me of pl acement and payment sur veys. Thi s i s per mi t t ed f or payment pur poses onl y.

SECTI ON 01 22 00 Page 3 Revi s i on 0002

1. 4 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Tr ansmi t submi t t al i t ems i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES. Submi t t he f ol l owi ng pr econst r uct i on submi t t al i t ems no l at er t han 30 cal endar days af t er Not i ce t o Pr oceed:

SD- 01 Pr econst r uct i on Submi t t al s

Schedul e of Val ues; G, RO

Pr ovi de a br eakdown of l ump sum i t ems i nt o pr oposed pay act i v i t i es. Schedul e of Val ues wi l l become basi s f or CLI N and Pay Act i v i t y dat a i n t he QCS payment dat a base.

1. 5 JOB PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act l ump sum payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE wi t h t he uni t " JOB" and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar l ump sum or uni t pr i ce payment i t em, shal l be i ncl uded i n t he l i s t ed l ump sum i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The l ump sum pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.

Pr ogr ess payment s f or l ump sum CLI Ns wi l l be made i n accor dance wi t h t he Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s c l ause of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. Pr ovi de a l i s t of pay act i v i t i es, ( Schedul e of Val ues) t o br eakdown bi d f or each l ump sum CLI N. Wi t hi n 20 cal endar days af t er r ecei v i ng Not i ce t o Pr oceed, submi t Schedul e of Val ues f or Gover nment appr oval . An unbal anced Schedul e of Val ues and Pay Act i v i t y Schedul e wi l l be r et ur ned f or r evi s i on. I f t hi s cont r act cont ai ns ei t her t he Cont i nui ng Cont r act s c l ause or t he Cont i nui ng Cont r act s ( Al t er nat e) c l ause, t he Cont r act or shoul d t ake i nt o account t he amount r eser ved f or cont r act payment s when pr epar i ng t he const r uct i on schedul e.

1. 5. 1 Mobi l i zat i on and Demobi l i zat i on ( Li ne I t em 0001)

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o mobi l i zat i on and demobi l i zat i on and est abl i shment of i ni t i al pr oj ect management and coor di nat i on. See Cl ause PAYMENT FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.

1. 5. 2 Const r uct i on/ Vi br at i on Cont r ol s & Moni t or i ng ( Li ne I t ems 0007, 0018 and 0026)

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o t he pr ot ect i on of exi st i ng st r uct ur es f r om const r uct i on act i v i t i es and moni t or i ng. See Sect i on 02 22 13 VI BRATI ON MONI TORI NG REQUI REMENTS FOR

EXI STI NG STRUCTURES.

SECTI ON 01 22 00 Page 4 Revi s i on 0002

1. 5. 3 Envi r onment al Speci es Moni t or i ng ( Li ne I t ems 0008, 0019 and 0027)

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o moni t or i ng envi r onment al speci es. See Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.

1. 5. 4 Tur bi di t y Moni t or i ng ( Li ne I t ems 0009, 0020 and 0028)

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o obt ai ni ng, anal yzi ng, and r epor t i ng t he r esul t s of moni t or i ng f or t ur bi di t y. See Section 01 57 25 TURBI DI TY AND DI SPOSAL MONI TORI NG.

1. 5. 5 Mobi l i zat i on and Demobi l i zat i on f or Non- Capt ur e Sea Tur t l e Tr awl Sweepi ng ( Hopper Dr edge Onl y) ( Li ne I t em 0010)

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o t he mobi l i zat i on and demobi l i zat i on f or sea t ur t l e non- capt ur e t r awl sweepi ng.

See Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.

1. 6 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.

Each Uni t Pr i ce CLI N may be a s i ngl e pay act i v i t y i t em or may be br oken down i nt o pay act i v i t i es wi t h smal l er quant i t i es equal t o CLI N t ot al .

Cont r act uni t pr i ce mul t i pl i ed by agr eed quant i t y i s f ul l compensat i on.

1. 6. 1 Beach Fi l l ( Li ne I t ems 0002, 0013 and 0021)

1. 6. 1. 1 Payment

a. Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o bar r i cades and si gns, r emoval of exi st i ng debr i s such as snags, dr i f t wood, wr ack, and r ef use, pi pel i ne cr ossi ng, excavat i on and t r anspor t at i on of beach and dune f i l l , const r uct i ng t he beach and dune pr of i l e and f i nal dr essi ng; noi se cont r ol ; di ve r epor t s; i nst al l at i on, oper at i on, or mai nt enance of t he el ect r oni c posi t i onal moni t or i ng equi pment ; and pr event i on of i nvasi ve and nui sance speci es t r ansf er .

See Sect i ons 01 57 20 ENVI RONMENTAL PROTECTI ON, 01 57 25 TURBI DI TY AND DI SPOSAL MONI TORI NG, and 35 20 25 BEACH FI LL.

b. I n addi t i on t o t he above, payment wi l l be made f or i n- pl ace beach and dune f i l l t o t he t ol er ances i ndi cat ed i n Sect i on 35 20 25 BEACH FI LL. Payment quant i t i es shal l be det er mi ned by t he Cont r act i ng Of f i cer ' s Repr esent at i ve usi ng aver age end ar ea met hod of cal cul at i on. When beach f i l l i s pl aced up- sl ope above sl ough zone t o compensat e f or wave act i on, payment of end ar ea wi l l be based on a cut and f i l l cal cul at i on. Ther e wi l l be no compensat i ng s l opes i n t he dune r est or at i on ar ea. No payment wi l l be made f or mat er i al pl aced on t he up- sl ope above t he t ol er ance A( u) t hat exceeds A( s) ( Ref er t o Beach Fi l l Tol er ance f i gur e i ndi cat ed i n t he par agr aph CONSTRUCTI ON FORMS AND DETAI LS of Sect i on 35 20 25 BEACH FI LL) .

SECTI ON 01 22 00 Page 5 Revi s i on 0002

1. 6. 1. 2 Measurement

a. The maps and/ or dr awi ngs al r eady pr epar ed ( c l ause CONTRACT DRAWI NGS, MAPS, AND SPECI FI CATI ONS of Sect i on 00700 CONTRACT CLAUSES i n t he cont r act ) ar e bel i eved t o r epr esent accur at el y t he exi st i ng condi t i ons at t he t i me t he sur veys wer e per f or med, but t he dept hs and el evat i ons shown t her eon may be ver i f i ed and cor r ect ed by el evat i ons and soundi ngs t aken bef or e commenci ng t he wor k. Once quant i t i es wi t hi n a speci f i ed r each or sect i on have been det er mi ned t hr ough t he use of i n- pl ace measur ement , t hey wi l l not be r eopened except on evi dence of col l usi on, f r aud, or obvi ous er r or .

b. Beach and dune f i l l sat i sf act or i l y pl aced wi l l be measur ed f or payment by use of t he aver age end ar ea met hod. The quant i t i es wi l l be comput ed by t he Gover nment i n accor dance wi t h c l ause QUANTI TY SURVEYS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. Measur ement of quant i t y pl aced f or pay pur poses wi l l be based on or i gi nal and f i nal cr oss sect i ons made on t he sect i on or r each i ndi cat ed on t he dr awi ngs. The Cont r act or shal l gi ve t went y- f our ( 24) hour s advance not i ce, i n wr i t i ng, t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve of t he need t o per f or m t he or i gi nal and f i nal sur veys. Qual i t y Cont r ol Sur veys shal l be t he r esponsi bi l i t y of t he Cont r act or . Mont hl y par t i al payment s wi l l be based on appr oxi mat e quant i t i es det er mi ned by measur ement of t he i n- pl ace beach and dune f i l l and i n accor dance wi t h c l ause QUANTI TY SURVEYS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.

c. I n accor dance wi t h c l ause QUANTI TY SURVEYS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1, Cont r act i ng Of f i cer ' s Repr esent at i ve wi l l per f or m pr e- and post - const r uct i on t opogr aphi c sur vey at 100- f oot st at i ons wi t h el evat i ons t aken at 10- f oot r ange i nt er val s f r om t he basel i ne t o t he t oe sl ope el evat i on. I n or der t o achi eve f i nal gr ade i n s l ough zone, Cont r act or shal l pl ace mat er i al t o f i nal gr ade wi t hi n t ol er ance f or ent i r e s l ope or may st ockpi l e beach f i l l up- sl ope of s l ough zone. Af t er st ockpi l ed beach f i l l i s measur ed f or payment , Cont r act or shal l shape sl ope t o wi t hi n one ( 1. 0) f oot of f i nal gr ade f r om t op of s l ope t o wat er l i ne pr oduci ng a smoot h uni f or m sl ope use compensat i ng s l opes. See Sect i on 35 20 25 BEACH FI LL, subpar agr aph " Dr essi ng f or Payment " . Once post - const r uct i on sur vey i s per f or med, no measur ement s wi l l be r evi sed except on suspi c i on of f r aud or obvi ous er r or .

1. 6. 1. 3 Uni t of Measur e

Cubi c yar d.

1. 6. 2 Scr eeni ng ( Li ne I t ems 0003, 0014 and 0022) )

1. 6. 2. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o separ at i on of any mat er i al gr eat er t han 3/ 4 i nches i n di amet er by a met hod t o be det er mi ned by t he Cont r act or and appr oved by Cont r act i ng Of f i cer . See Section 35 20 25 BEACH FI LL.

1. 6. 2. 2 Measurement

Separ at i on of mat er i al gr eat er t han 3/ 4 i nches i n di amet er wi l l be measur ed f or payment by t he Beach f i l l quant i t y sat i sf act or i l y pl aced. The est i mat ed vol ume i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE i s

SECTI ON 01 22 00 Page 6 Revi s i on 0002 pr ovi ded f or bi ddi ng pur poses onl y and wi l l be det er mi ned on act ual quant i t y pl aced.

1. 6. 2. 3 Uni t of Measur e

Cubi c yar d.

1. 6. 3 Beach Ti l l i ng ( Li ne I t ems 0004, 0015 and 0023)

1. 6. 3. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o beach t i l l i ng. See Sect i ons 01 57 20 ENVI RONMENTAL PROTECTI ON and 35 20 25

BEACH FI LL.

1. 6. 3. 2 Measurement

Beach t i l l i ng wi l l be measur ed f or payment by t he act ual ar ea t i l l ed t o t he t ent h of a acr e.

1. 6. 3. 3 Uni t of Measur e

Acre.

1. 6. 4 Remedi at i on of Noncompl i ant Mat er i al ( Li ne I t ems 0005, 0016 and 0024)

1. 6. 4. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o r emedi at i on of noncompl i ant mat er i al f ound on t he beach and dune f i l l t empl at e and det er mi ned by t he Cont r act i ng Of f i cer t o have or i gi nat ed f r om wi t hi n t he bor r ow ar ea onl y. Remedi at i on pr ocedur es ar e i ndi cat ed i n par agr aph QUALI TY CONTROL FOR BEACH FI LL of Sect i on 35 20 25 BEACH FI LL.

No payment wi l l be made f or r emedi at i on of noncompl i ant mat er i al r esul t i ng f r om over excavat i on or excavat i on out si de t he l i mi t s of t he bor r ow ar ea.

I f per f or mance of t hi s l i ne i t em i s not r equi r ed or i mpl ement ed per t he NOTES i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE, no payment wi l l be made t o t he Cont r act or f or t hi s l i ne i t em.

1. 6. 4. 2 Measurement

Remedi at i on of noncompl i ant mat er i al wi l l be measur ed f or payment by t he act ual ar ea of noncompl i ant mat er i al bl ended wi t h adj acent mat er i al t o t he t ent h ( 0. 1) of an acr e. The est i mat ed vol ume i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE i s pr ovi ded f or bi ddi ng pur poses onl y.

1. 6. 4. 3 Uni t of Measur e

Acre.

1. 6. 5 Tr anspor t at i on and Di sposal of Unaccept abl e Mat er i al ( Li ne I t ems 0006, 0017 and 0025)

1. 6. 5. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o t r anspor t at i on and di sposal of unaccept abl e mat er i al af t er i t has been det er mi ned by t he Cont r act i ng Of f i cer t o have or i gi nat ed i n t he bor r ow ar ea and r emoved by scr eeni ng. See Sect i on 35 20 25 BEACH FI LL. I f

SECTI ON 01 22 00 Page 7 Revi s i on 0002 per f or mance of t hi s l i ne i t em i s not r equi r ed or i mpl ement ed per t he NOTES i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE, no payment wi l l be made t o t he Cont r act or f or t hi s l i ne i t em.

1. 6. 5. 2 Measurement

Tr anspor t at i on and di sposal of unaccept abl e mat er i al wi l l be measur ed f or payment by t he quant i t y di sposed. The est i mat ed vol ume i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE i s pr ovi ded f or bi ddi ng pur poses onl y and wi l l be det er mi ned on act ual quant i t y di sposed.

1. 6. 5. 3 Uni t of Measur e

Cubi c yar d.

1. 6. 6 Sea Tur t l e Non- Capt ur e Tr awl Sweepi ng ( Hopper Dr edge Onl y) ( Li ne I t em 0011)

1. 6. 6. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o t he Sea Tur t l e Non- Capt ur e Tr awl Sweepi ng. Thi s pr i ce shal l i ncl ude al l cost s f or f ur ni shi ng l abor , equi pment , f uel , oi l , mat er i al s, and suppl i es r equi r ed f or t r awl sweepi ng t o c l ear sea t ur t l es f r om t he vi c i ni t y of t he dr edge, and shal l i ncl ude t he cost of r epor t i ng as speci f i ed. See Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON. I f per f or mance of t hi s l i ne i t em i s not r equi r ed or i mpl ement ed per t he NOTES i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE, no payment wi l l be made t o t he Cont r act or f or t hi s l i ne item.

1. 6. 6. 2 Measurement

Sea Tur t l e Non- Capt ur e Tr awl Sweepi ng wi l l be measur ed f or payment based upon t he dur at i on of per f or mance on a dai l y basi s. A day of t r awl sweepi ng i s def i ned as 24 hour s of cont i nuous t r awl i ng. The Cont r act or shal l conduct non- capt i ve t r awl sweepi ng as descr i bed i n Par agr aph " Sea Tur t l e Non- Capt ur e Tr awl Sweepi ng" i n Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.

1. 6. 6. 3 Uni t of Measur e

Day.

1. 6. 7 St andby Ti me ( Base Li ne I t em 0012)

1. 6. 7. 1 Measur ement and Payment

St andby t i me i s def i ned as when t he dr edge pl ant i s not i n oper at i on at t he di r ect i on of t he Cont r act i ng Of f i cer or Admi ni st r at i ve Cont r act i ng Of f i cer . St andby t i me shal l be ut i l i zed onl y due t o t he pr esence of endanger ed speci es i n t he i mmedi at e ar ea of t he dr edgi ng oper at i ons, di f f er i ng s i t e condi t i ons, secur i t y oper at i ons or ot her condi t i ons as det er mi ned by t he Cont r act i ng Of f i cer . St andby t i me i s not af f or ded f or del ays caused by adver se weat her condi t i ons. Thi s l i ne i t em i s not subj ect t o t he var i at i on i n est i mat ed quant i t y c l ause, and payment wi l l onl y be made f or act ual st andby t i me r equi r ed by t he Cont r act i ng Of f i cer .

See Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.

SECTI ON 01 22 00 Page 8 Revi s i on 0002

1. 6. 7. 2 Uni t of Measur e

Hour.

PART 2 PRODUCTS ( NOT APPLI CABLE)

PART 3 EXECUTI ON

3. 1 PAYMENT PROCEDURES

Upon r ecei v i ng i ni t i al Resi dent Management Syst em i mpor t f i l e, go t o " Pay Act i v i t i es" and est abl i sh a l i nk bet ween bi d br eakdown schedul e of val ues of " Pay Act i v i t i es" t o cont r act CLI Ns usi ng " Schedul e Act i v i t i es" dat a ent r y page.

3. 1. 1 Request i ng Pr ogr ess Payment

For pr ogr ess payment s, ensur e " Act i v i t y Schedul e" , " Feat ur e Schedul e" , submi t t al r egi st er , and punchl i st s ar e al l up t o dat e. Use " Pr ogr ess Payment s" t o " r equest Act i v i t y Ear ni ngs" f or bot h " Act i v i t y Ear ni ngs" dat a ent r y page and " Ot her Ear ni ng" . Pr ovi de har d copi es of suppor t i ng i nvoi ces and quant i t y measur ement s t o suppor t al l r equest ed ear ni ngs.

Ensur e t hat sum of payment act i v i t i es do not exceed cont r act awar d CLI N f undi ng amount s, or " unbal anced" CLI Ns er r or wi l l pr event pr ocessi ng t he payment.

3. 1. 2 Opt i ons and Modi f i cat i on CLI NS

When addi t i onal wor k i s added by modi f i cat i on, exi st i ng CLI Ns f undi ng amount s must be updat ed, or new CLI Ns f or modi f i cat i on wi l l be cr eat ed.

I f cont r act has opt i on CLI Ns not yet awar ded, opt i on CLI Ns wi l l appear as zer o dol l ar CLI Ns unt i l opt i on i s awar ded by modi f i cat i on. No payment may be r equest ed f or Opt i ons or Modi f i cat i on CLI Ns unt i l cont r act modi f i cat i on has been f unded and si gned.

- - End of Sect i on - -

SECTI ON 01 22 00 Page 9 Revi s i on 0002

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES

Fort Pierce Shore Protection Project (Revision 0002)

01 22 00 SD-01 Preconstruction Submittals

G ROSchedule of Values

01 30 00 SD-01 Preconstruction Submittals

List of Subcontractors

SD-07 Certificates

Signature Authority

Drug-Free Work Place Record

01 32 01 SD-01 Preconstruction Submittals

1.2.1 G RORMS Schedules

1.2.2 G ROBar Chart

1.2.2 G RO'S' Curve

SD-07 Certificates

1.4Progress Photographs

01 33 00 SD-01 Preconstruction Submittals

G ROExport File

01 35 25 SD-01 Preconstruction Submittals

G RODive Operations Plan

SD-07 Certificates

G RODive Personnel Qualifications

01 35 26 SD-01 Preconstruction Submittals

1.6 G DOAccident Prevention Plan (APP)

1.7 G DOActivity Hazard Analysis (AHA)

3.1.1 G DOSafe Access Plan

3.1.1 G DOSafe Access Plan

SD-02 Shop Drawings

1.6.1 G DOCrane Critical Lift Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES

01 35 26 1.6.1 G ROStandard Lift Plan (SLP)

SD-06 Test Reports

1.11Notifications and Reports

1.11.1Accident Reports

1.11.2Crane Reports

SD-07 Certificates

1.8Confined Space Entry Permit

1.8Hot work permit

1.13License Certificates

1.5.2.4 G DOCrane Operators

1.11.4Third Party Certification of

Barge-Mounted Mobile Cranes

1.11.3Certificate of Compliance

01 45 05 SD-01 Preconstruction Submittals

G ROQuality Control Plan

SD-07 Certificates

Letter of Authority

G ROPersonnel Qualifications

01 50 02 SD-01 Preconstruction Submittals

Mobilization/Demobilization Plan

3.6Security Plan

SD-02 Shop Drawings

3.5Contractor's Temporary Facilities

SD-03 Product Data

3.8.1 G ROFinal Cleaning

01 57 20 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES

01 57 20 G DOEnvironmental Protection Plan

G DOTurtle Deflector Device

SD-07 Certificates

Marine Turtle Permit

Sea Turtle Nesting Monitor and

Relocation Qualifications

G DOBird Monitoring Qualifications

G DOManatee Observer Qualifications

G DOEndangered Species Observer and Trawl Supervisor

Qualifications (For Hopper

Dredges Only)

SD-11 Closeout Submittals

Logs/Final Summary Report

Project Environmental Summary

Sheet

Logs/Summary of Bird Nesting

Monitoring

Piping Plover Surveys

Logs/Summary of Marine Turtle

Nesting and Relocation

Trawl Sweeping Daily Logs

01 57 25 SD-03 Product Data

Calibration Standard

SD-06 Test Reports

Turbidity Monitoring

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES

02 22 13 SD-01 Preconstruction Submittals

G DOVibration Control Specialist

G DOVibration Control Specialist

Alternate

G DOVibration Monitoring

Technician(s)

G DOStructural Inspection/Evaluation

Engineer

G DOPre-Construction Structural

Survey

G DOVibration Control Plan

SD-06 Test Reports

Vibration Monitoring Report

Daily Instrument Logs

G DOPost-Construction Structural

Survey

35 20 25 SD-02 Shop Drawings

G ROGeneral Work Plan

G DOMaterial Screening And Removal

Plan

Progress Maps; G, DO

Relocation of Navigation Aids

G ROConstruction and Grade Stakes

Recovery Plan

G DORock Removal Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES

35 20 25 3.6.5Noncompliant and Unacceptable

Material Contingency Plan

Electronic Tracking System

Charts

Dredge Location Control

Color-Coded Plot

G DOAcceptance Sections Plan

SD-04 Samples

Quality Control for Beach Fill

SD-07 Certificates

G RONotice of Intent to Dredge

G ROEquipment and Performance

Data

G ROGrade Stake Recovery

G ROBuoy and Anchoring Inventory

Recovery

1.7.5Historical Period Shipwreck Sites

Daily/Monthly Report of

Operations

Notice of Misplaced Material

Declaration of Inspection

35 20 26 SD-01 Preconstruction Submittals

Dredge Plant Instrumentation

Plan

G, SAM-OP-J

G ROContractor Quality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES

35 20 26 SD-06 Test Reports

G ROData Appropriately Archived e-mail

SD-07 Certificates

G ROLetter of National Dredging

Quality Management Program

Certification

35 20 28 SD-01 Preconstruction Submittals

Dredge Plant Instrumentation

Plan Revisions or Addendum

G, SAM-OP-J

G ROContactor Quality Control Plan, section 3.2.5

SD-07 Certificates

G ROLetter of National Dredging

Quality Management Program

Certification

SD-06 Test Reports

G ROData Appropriately Archived e-mail, section 3.2.11

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 57 20

ENVI RONMENTAL PROTECTI ON

PART 1 GENERAL

1. 1 SCOPE

1. 2 ENVI RONMENTAL LAWS, REGULATI ONS AND DOCUMENTS

1. 2. 1 Mi scel l aneous Envi r onment al Laws And Regul at i ons

1. 2. 2 NEPA Ref er ence

1. 3 REFERENCES

1. 4 QUALI TY CONTROL

1. 5 PERMI TS AND AUTHORI ZATI ONS

1. 6 SUBMI TTALS

1. 7 SUBCONTRACTORS

1. 8 NOTI FI CATI ON

1. 9 CONTRACTOR PERSONNEL QUALI FI CATI ONS I N POLLUTI ON CONTROL

PART 2 PRODUCTS ( NOT APPLI CABLE)

PART 3 EXECUTI ON

3. 1 PROTECTI ON OF ENVI RONMENTAL RESOURCES

3. 1. 1 Gener al Pr oj ect Envi r onment al Desi gn and I nst al l at i on Cr i t er i a

3. 1. 1. 1 Sewage- Based Syst ems Envi r onment al Desi gn and I nst al l at i on

Criteria

3. 1. 2 Pr ot ect i on of Land Resour ces

3. 1. 2. 1 Wor k Ar ea Li mi t s

3. 1. 2. 2 Cont r act or Faci l i t i es and Ot her Wor k Ar eas

3. 1. 2. 3 Sol i d Wast es

3. 1. 2. 4 Fuel , Oi l , and Lubr i cant s

3. 1. 2. 5 Hazar dous Wast e

3. 1. 2. 6 Hazar dous Mat er i al s

3. 1. 2. 7 Di sposal of Ot her Mat er i al s

3. 1. 3 Pr eser vat i on and Recover y of Hi st or i c, Ar cheol ogi cal , and

Cul t ur al Resour ces

3. 1. 3. 1 Appl i cabl e Law

3. 1. 3. 2 Known Resour ces

3. 1. 3. 3 I nadver t ent Di scover i es

3. 1. 3. 4 Cl ai ms f or Downt i me due t o I nadver t ent Di scover i es

3. 1. 4 Pr ot ect i on of Wat er Resour ces

3. 1. 4. 1 Moni t or i ng of Wat er Ar eas

3. 1. 4. 2 Tur bi di t y

3. 1. 4. 3 Oi l , Fuel , and Hazar dous Subst ance Spi l l Pr event i on and

Mitigation

3. 1. 5 Pr ot ect i on of Fi sh and Wi l dl i f e Resour ces

3. 1. 5. 1 Endanger ed Speci es Pr ot ect i on

3. 1. 5. 2 Endanger ed Speci es Obser ver s ( Hopper Dr edge Onl y)

3. 1. 5. 3 Manat ee, Sea Tur t l e, and Whal e Si ght i ng Repor t s

3. 1. 5. 4 Di sposi t i on of Endanger ed or Thr eat ened Speci es Car casses

3. 1. 5. 5 Repor t Submi ssi on

SECTI ON 01 57 20 Page 1 Revi s i on 0002

3. 1. 5. 6 Hopper Dr edge Equi pment

3. 1. 5. 7 Sea Tur t l e Non- Capt ur e Tr awl Sweepi ng ( For Hopper Dr edges

Only)

3. 1. 5. 8 Suspensi on of Dr edgi ng ( Hopper Dr edge Onl y)

3. 1. 5. 8. 1 Excessi ve Tur t l e Take

3. 1. 5. 8. 2 Gener al Gui del i nes f or Cor ps Di scr et i onar y Aut hor i t y t o I ni t i at e Tur t l e Tr awl i ng

3. 1. 5. 9 Sea Tur t l e ( Wor k St oppage) Wi ndow and Moni t or i ng

3. 1. 5. 10 Beach Pl acement Rest r i ct i ons

3. 1. 5. 11 Escar pment s

3. 1. 5. 12 Har dbot t om Pr ot ect i on

3. 1. 5. 13 Pr ot ect i on of Mi gr at or y Bi r d Speci es

3. 1. 5. 14 Pr ot ect i on of Pi pi ng Pl over

3. 1. 6 Seagr ass Pr ot ect i on Measur es

3. 1. 7 Pr ot ect i on of Ai r Resour ces

3. 1. 7. 1 Par t i cul at es

3. 1. 7. 2 Odor s

3. 1. 8 Pr ot ect i on of Sound I nt r usi ons

3. 2 POSTCONSTRUCTI ON CLEANUP

3. 3 PRESERVATI ON AND RESTORATI ON OF LANDSCAPE AND MARI NE VEGETATI ON

DAMAGES

3. 4 I NVASI VE AND NUI SANCE SPECI ES

3. 4. 1 Pr event i on of I nvasi ve and Nui sance Speci es Tr ansf er

3. 4. 2 I nvasi ve and Nui sance Speci es Repor t i ng

3. 5 MAI NTENANCE OF POLLUTI ON CONTROL FACI LI TI ES

3. 6 CONSTRUCTI ON FORMS AND DETAI LS

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 57 20 Page 2 Revi s i on 0002

SECTI ON 01 57 20

ENVI RONMENTAL PROTECTI ON

PART 1 GENERAL

1. 1 SCOPE

Thi s Sect i on cover s pr event i on of envi r onment al damage as t he r esul t of const r uct i on oper at i ons under t hi s cont r act and f or t hose measur es set f or t h i n ot her Techni cal Requi r ement s of t hese speci f i cat i ons. For t he pur pose of t hi s speci f i cat i on, envi r onment al damage i s def i ned as t he pr esence of hazar dous, physi cal , chemi cal , or bi ol ogi cal el ement s or agent s whi ch adver sel y af f ect human heal t h or wel f ar e; unf avor abl y al t er ecol ogi cal bal ances; af f ect ot her speci es, bi ol ogi cal communi t i es, or ecosyst ems; or degr ade t he qual i t y of t he envi r onment f or aest het i c, cul t ur al , and/ or hi st or i cal pur poses. The cont r ol of envi r onment al damage r equi r es consi der at i on of l and, wat er , and ai r , and i ncl udes management of v i sual aest het i cs, noi se, sol i d wast e, r adi ant ener gy and r adi oact i ve mat er i al s, as wel l as ot her pol l ut ant s.

1. 2 ENVI RONMENTAL LAWS, REGULATI ONS AND DOCUMENTS

1. 2. 1 Mi scel l aneous Envi r onment al Laws And Regul at i ons

Ther e ar e numer ous envi r onment al l aws and r egul at i ons. At t he Feder al l evel , t he appl i cabl e l aws and r egul at i ons i ncl ude compl i ance wi t h t he Cl ean Wat er Act ( CWA) ; Cl ean Ai r Act ( CAA) ; Coast al Zone Management Act ( CZMA) ; Compr ehensi ve Envi r onment al Response, Compensat i on, and Li abi l i t y Act ( CERCLA) ; Endanger ed Speci es Act ( ESA) ; Fi sh and Wi l dl i f e Coor di nat i on Act ( FWCA) ; Mar i ne Pr ot ect i on, Resear ch, and Sanct uar i es Act ( MPRSA) ;

Magnuson- St evens Fi sher y Conser vat i on and Management Act ( MSFCMA) ;

Nat i onal Envi r onment al Pol i cy Act ( NEPA) ; Nat i onal Hi st or i c Pr eser vat i on Act ( NHPA) ; Nat i onal Pol l ut i on Di schar ge El i mi nat i on Syst em ( NPDES) ;

Resear ch and Sanct uar i es Act ; Nat i ve Amer i can Gr aves Pr ot ect i on and Repat r i at i on Act ( NAGPRA) ; Resour ce Conser vat i on and Recover y Act ( RCRA) ;

Ri ver s and Har bor s Act ( R&H) ; Saf e Dr i nki ng Wat er Act ( SDWA) ; Toxi c Subst ance Cont r ol Act ( TSCA) ; Wi l d and Sceni c Ri ver s Act ( WSRA) ; Feder al I nsect i c i de, Fungi c i de, and Rodent i c i de Act ( FI FRA) ; Mar i ne Mammal Pr ot ect i on Act ( MMPA) ; Mi gr at or y Bi r d Tr eat y Act ; Code of Feder al Regul at i ons ( CFRs) ; Execut i ve Or der s; and, Envi r onment al Pr ot ect i on Agency ( EPA) r equi r ement s.

1. 2. 2 NEPA Ref er ence

Commi t ment s made i n t he NEPA document have been i ncor por at ed i nt o t hese speci f i cat i ons. The NEPA document can be f ound at t he f ol l owi ng websi t e:

http://www.saj.usace.army.mil/About/Divisions-Offices/Planning/Environmental-Branch/ Environmental-Documents/

1. 3 REFERENCES

Any publ i cat i on l i s t ed bel ow f or ms a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. Publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y.

SECTI ON 01 57 20 Page 3 Revi s i on 0002

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual

EM 1110- 1- 1003 ( 1996) NAVSTAR Gl obal Posi t i oni ng Syst em Surveying

1. 4 QUALI TY CONTROL

The Cont r act or shal l est abl i sh and mai nt ai n qual i t y cont r ol f or envi r onment al pr ot ect i on of al l i t ems set f or t h her ei n. The Cont r act or shal l r ecor d on dai l y qual i t y cont r ol r epor t s or at t achment s t her et o, any pr obl ems i n compl yi ng wi t h l aws, r egul at i ons and or di nances, and cor r ect i ve act i on t aken.

1. 5 PERMI TS AND AUTHORI ZATI ONS

The Cont r act or shal l compl y wi t h al l r equi r ement s under t he t er ms and condi t i ons set out i n t he f ol l owi ng per mi t ( s) and aut hor i zat i on( s) obt ai ned by t he Cor ps of Engi neer s l i s t ed bel ow.

a. Fl or i da Depar t ment of Envi r onment al Pr ot ect i on Per mi t No.

0327791- 001- JC; Ef f ect i ve Dat e: May 2, 2016; Expi r at i on Dat e: May 2, 2031 and Modi f i cat i ons No. 0327791- 002- JN i ssued on Mar ch 13, 2017 .

The above per mi t s i ndi cat e i ssui ng agency appr oval of wor k r equi r ed by t hi s cont r act . Per mi t s and envi r onment al compl i ance document s, i ncl udi ng Envi r onment al Compl i ance Mat r i x ( ECM) def i ni ng r ol es and r esponsi bi l i t i es, ar e avai l abl e at t he f ol l owi ng web addr ess:

http://www.saj.usace.army.mil/About/Divisions-Offices/Planning/Environmental-Branch/ Environmental-Compliance/

The Cont r act or shal l obt ai n and compl y wi t h t he r equi r ement s of al l ot her per mi t s or l i censes r equi r ed f or const r uct i on of t hi s pr oj ect i n accor dance wi t h t he Cl ause PERMI TS AND RESPONSI BI LI TI ES of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.

1. 6 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES.

Submi t t he f ol l owi ng pr econst r uct i on submi t t al i t ems no l at er t han 30 cal endar days af t er Not i ce t o Pr oceed:

SD- 01 Pr econst r uct i on Submi t t al s

Envi r onment al Pr ot ect i on Pl an; G, DO

No l at er t han 30 cal endar days af t er Not i ce t o Pr oceed, t he Cont r act or shal l submi t an Envi r onment al Pr ot ect i on Pl an f or r evi ew and accept ance by t he Cont r act i ng Of f i cer . The Gover nment wi l l consi der an i nt er i m pl an f or t he f i r st 30 days of oper at i ons. However , t he Cont r act or shal l f ur ni sh an accept abl e f i nal pl an no l at er t han 30 cal endar days af t er r ecei pt of Not i ce t o Pr oceed. Accept ance of t he Cont r act or ' s pl an shal l not r el i eve

SECTI ON 01 57 20 Page 4 Revi s i on 0002 t he Cont r act or of hi s r esponsi bi l i t y f or adequat e and cont i nui ng cont r ol of pol l ut ant s and ot her envi r onment al pr ot ect i on measur es. Accept ance of t he pl an i s condi t i onal and pr edi cat ed on sat i sf act or y per f or mance dur i ng const r uct i on. The Gover nment r eser ves t he r i ght t o r equi r e t he Cont r act or t o make changes t o t he Envi r onment al Pr ot ect i on Pl an or oper at i ons i f t he Cont r act i ng Of f i cer det er mi nes t hat envi r onment al pr ot ect i on r equi r ement s ar e not bei ng met . No physi cal wor k at t he s i t e shal l begi n pr i or t o accept ance of t he Cont r act or ' s pl an or an i nt er i m pl an cover i ng t he wor k t o be per f or med. The Envi r onment al Pr ot ect i on Pl an shal l i ncl ude but not be l i mi t ed t o t he f ol l owi ng:

a. A l i s t of Feder al , St at e, and l ocal l aws, r egul at i ons, and per mi t s concer ni ng envi r onment al pr ot ect i on, pol l ut i on cont r ol , and abat ement t hat ar e appl i cabl e t o t he Cont r act or ' s pr oposed oper at i ons and t he r equi r ement s i mposed by t hose l aws, r egul at i ons, and per mi t s.

b. Met hods f or pr ot ect i on of f eat ur es t o be pr eser ved wi t hi n aut hor i zed wor k ar eas. The Cont r act or shal l pr epar e a l i s t i ng of met hods t o pr ot ect r esour ces needi ng pr ot ect i on, i . e. , t r ees, shr ubs, v i nes, gr asses and gr ound cover , l andscape f eat ur es, ai r and wat er qual i t y, f i sh and wi l dl i f e, soi l , hi st or i cal , ar cheol ogi cal , and cul t ur al r esour ces.

c. Pr ocedur es t o be i mpl ement ed t o pr ovi de t he r equi r ed envi r onment al pr ot ect i on and t o compl y wi t h t he appl i cabl e l aws and r egul at i ons. The Cont r act or shal l pr ovi de wr i t t en assur ance t hat i mmedi at e cor r ect i ve act i on wi l l be t aken t o cor r ect pol l ut i on of t he envi r onment due t o acci dent , nat ur al causes, or f ai l ur e t o f ol l ow t he pr ocedur es set out i n accor dance wi t h t he envi r onment al pr ot ect i on pl an.

d. A per mi t or l i cense f or and t he l ocat i on of t he sol i d wast e di sposal ar ea.

e. Dr awi ngs showi ng l ocat i ons of any pr oposed t empor ar y excavat i ons or embankment s f or haul r oads, st r eam cr ossi ng, mat er i al st or age ar eas, st r uct ur es, sani t ar y f aci l i t i es, and st ockpi l es of excess or spoi l mat er i al s.

f . Envi r onment al moni t or i ng pl ans f or t he j ob s i t e, i ncl udi ng l and, wat er , ai r , and noi se moni t or i ng.

g. Tr af f i c cont r ol pl an.

h. Met hods of pr ot ect i ng sur f ace and gr ound wat er dur i ng const r uct i on act i v i t i es.

i . Spi l l pr event i on. The Cont r act or shal l speci f y al l pot ent i al l y hazar dous subst ances t o be used on t he j ob s i t e and i nt ended act i ons t o pr event acci dent al or i nt ent i onal i nt r oduct i on of such mat er i al s i nt o t he ai r , gr ound, wat er , wet l ands, or dr ai nage ar eas. The pl an shal l speci f y t he Cont r act or ' s pr ovi s i ons t o be t aken t o meet Feder al , St at e, and l ocal l aws and r egul at i ons r egar di ng l abel i ng, st or age, r emoval , t r anspor t , and di sposal of pot ent i al l y hazar dous subst ances.

j . Spi l l cont i ngency pl an f or hazar dous, t oxi c, or pet r ol eum

SECTI ON 01 57 20 Page 5 Revi s i on 0002 material.

k. Wor k ar ea pl an showi ng t he pr oposed act i v i t y i n each por t i on of t he ar ea and i dent i f y i ng t he ar eas of l i mi t ed use or nonuse. Pl an shoul d i ncl ude measur es f or mar ki ng t he l i mi t s of use ar eas.

l . Pl an of bor r ow ar ea( s) .

m. A st at ement as t o t he per son who shal l be r esponsi bl e f or i mpl ement at i on of t he Envi r onment al Pr ot ect i on Pl an. The Cont r act or per sonnel r esponsi bl e shal l r epor t di r ect l y t o t he Cont r act or ' s t op management and shal l have t he aut hor i t y t o act f or t he Cont r act or i n al l envi r onment al pr ot ect i on mat t er s.

n. Recycl i ng and Wast e Management Pl an. Execut i ve Or der 12873 of 20 Oct ober 1993 r equi r es a number of consi der at i ons i n pl anni ng a pr oj ect . Fal l en t r ees shoul d not be bur ned or bur i ed.

Mul chi ng, compost i ng, and ot her uses f or t r ees shoul d be consi der ed. Al so, r ecover y of met al s at t he j ob s i t e, i ncl udi ng al umi num cans, shoul d be consi der ed wi t h pr oceeds t o be r et ai ned by t he Cont r act or . Non- Feder al r ecycl i ng and wast e mi ni mi zat i on ef f or t s shal l al so be i ncor por at ed i nt o t hi s pl an.

o. Tur bi di t y Moni t or i ng Pl an. A st at ement as t o t he per son who shal l be r esponsi bl e f or t ur bi di t y moni t or i ng and r epor t i ng t o be per f or med. Met hod of t ur bi di t y moni t or i ng and r epor t i ng t hat wi l l be per f or med. The t ur bi di t y moni t or i ng r equi r ement s of any speci al ar eas such as out st andi ng Fl or i da wat er s.

p. Oper at i onal pl an t o achi eve pr ot ect i on of sea t ur t l es dur i ng hopper dr edge( s) oper at i on.

q. Const r uct i on act i v i t i es shal l be conduct ed i n a manner as not t o i mpact mi gr at or y bi r ds or i nduce t hei r nest i ng.

r . The Cont r act or shal l pr ovi de one whal e obser ver t ext mai l box per dr edge e- mai l addr ess or t el ephone number t o r ecei ve r eal t i me whal e al er t s t hr oughout t he cal v i ng season.

Tur t l e Def l ect or Devi ce; G, DO

I f t he Cont r act or pr oposes t o use a hopper dr edge f or t hi s wor k, det ai l dr awi ngs shal l be submi t t ed showi ng t he pr oposed devi ce and i t s at t achment t o t he Cont r act or ' s equi pment no l at er t han 30 cal endar days af t er Not i ce t o Pr oceed. Cont r act or ' s dr awi ngs t o be submi t t ed shal l i ncl ude t he appr oach angl e f or any and al l dept hs t o be dr edged dur i ng t hi s cont r act . A copy of t he appr oved dr awi ngs and cal cul at i ons shal l be avai l abl e on t he vessel dur i ng t he l i f e of t hi s cont r act . No dr edgi ng wor k shal l be al l owed t o commence unt i l appr oval of t he i nst al l ed t ur t l e def l ect or devi ce.

SD- 07 Cer t i f i cat es

Mar i ne Tur t l e Per mi t

The Cont r act or shal l submi t a copy of Fl or i da Fi sh and Wi l dl i f e Conser vat i on Commi ssi on ( FF&WCC) per mi t f or handl i ng of sea t ur t l e eggs.

SECTI ON 01 57 20 Page 6 Revi s i on 0002

Sea Tur t l e Nest i ng Moni t or and Rel ocat i on Qual i f i cat i ons

Submi t qual i f i cat i ons and per mi t no l at er t han 30 cal endar days af t er Not i ce t o Pr oceed.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .