Fort Jackson Natural Gas & Electric Utility Services

Award Notice Posted

Solicitation number
spe60016r0805
Agency
Awarded
to Dominion Privatization South Carolina LLC
Set-aside
No set-aside

Opportunity facts

Contract number
SP0600-18-C-8325 Federal contract award
NAICS code
221210 Natural Gas Distribution
PSC
Not on record
Place of performance
Fort Jackson Army Base, South Carolina Columbus, South Carolina 29207, United States

Notice details come from SAM.gov. Updated .

Notice text

14 versions

Update #14 · Latest ·

Awarded Vendors: South Carolina Electric & Gas, Co.. Contract Award Dollar Amount: $33,658,296.00. Contract Award Date: 2018-09-28.

Update #13 ·

Awarded Vendors: Dominion Privatization South Carolina, LLC. Contract Award Dollar Amount: $142,280,462. Contract Award Date: 2018-09-28.

Update #12 ·


NOTE: The deadline date to post questions or to request site visits is 9 May 2016.
Amendment 0001 is posted to update FAR clauses and revise/add additional information regarding the Pre-proposal Conference and Site Visits.
Amendment 0002 is posted to update RFP Sections B.2.2. Schedule B-2 Fixed Price Economic Price Adjustment with correct footnote; C.12 Operations and Maintainance/Quality Management with the correct name of Operation and Maintenance Plan/Quality Management Plan; L.4 Proposal Preparation Instructions with the correct name of Operation and Maintenance Plan/Quality Management Plan.
Amendment 0003 is posted to extend the proposal submission date to:
Date: Tuesday, June 7, 2016
Time: 3:00 p.m. EST
Amendment 0004 is posted to replace JA1, Fort Jackson Electric Distribution System (January 28, 2016) and JA2, Fort Jackson Electric Natural Gas Distribution System (January 28, 2016) in their entirety and replace them with JA1, Fort Jackson Electric Distribution System (April 22, 2016) and JA2, Fort Jackson Electric Natural Gas Distribution System (April 22, 2016) respectively.
Amendment 0005 is posted to replace JA39, Past Performance Information (posted: February 5, 2016) and JA 41, Wage Determination (posted: February 5, 2016) in their entirety and replace them with JA39A, Past Performance Information (posted: April 28, 2016) and JA 41A, Wage Determination (posted: April 28, 2016) respectively.
Amendment 0006 is posted to extend the proposal submission date to:
Date: Tuesday, June 28, 2016
Time: 3:00 p.m. EST
.

Update #11 ·


NOTE: The deadline date to post questions or to request site visits is 9 May 2016.

Amendment 0001 is posted to update FAR clauses and revise/add additional information regarding the Pre-proposal Conference and Site Visits.

Amendment 0002 is posted to update RFP Sections B.2.2. Schedule B-2 Fixed Price Economic Price Adjustment with correct footnote; C.12 Operations and Maintainance/Quality Management with the correct name of Operation and Maintenance Plan/Quality Management Plan; L.4 Proposal Preparation Instructions with the correct name of Operation and Maintenance Plan/Quality Management Plan.

Amendment 0003 is posted to extend the proposal submission date to:
    
     Date: Tuesday, June 7, 2016
     Time:  3:00 p.m. EST

Amendment 0004 is posted to replace JA1, Fort Jackson Electric Distribution System (January 28, 2016) and JA2, Fort Jackson Electric Natural Gas Distribution System (January 28, 2016) in their entirety and replace them with JA1, Fort Jackson Electric Distribution System (April 22, 2016) and JA2, Fort Jackson Electric Natural Gas Distribution System (April 22, 2016) respectively.

Amendment 0005 is posted to replace JA39, Past Performance Information (posted: February 5, 2016) and JA 41, Wage Determination (posted: February 5, 2016) in their entirety and replace them with JA39A, Past Performance Information (posted: April 28, 2016) and JA 41A, Wage Determination (posted: April 28, 2016) respectively.

Amendment 0006 is posted to extend the proposal submission date to:
    
     Date: Tuesday, June 28, 2016
     Time:  3:00 p.m. EST

Update #10 ·


NOTE: The deadline date to post questions or to request site visits is 9 May 2016.
Amendment 0001 is posted to update FAR clauses and revise/add additional information regarding the Pre-proposal Conference and Site Visits.
Amendment 0002 is posted to update RFP Sections B.2.2. Schedule B-2 Fixed Price Economic Price Adjustment with correct footnote; C.12 Operations and Maintainance/Quality Management with the correct name of Operation and Maintenance Plan/Quality Management Plan; L.4 Proposal Preparation Instructions with the correct name of Operation and Maintenance Plan/Quality Management Plan.
Amendment 0003 is posted to extend the proposal submission date to:
Date: Tuesday, June 7, 2016
Time: 3:00 p.m. EST
Amendment 0004 is posted to replace JA1, Fort Jackson Electric Distribution System (January 28, 2016) and JA2, Fort Jackson Electric Natural Gas Distribution System (January 28, 2016) in their entirety and replace them with JA1, Fort Jackson Electric Distribution System (April 22, 2016) and JA2, Fort Jackson Electric Natural Gas Distribution System (April 22, 2016) respectively.
Amendment 0005 is posted to replace JA39, Past Performance Information (posted: February 5, 2016) and JA 41, Wage Determination (posted: February 5, 2016) in their entirety and replace them with JA39A, Past Performance Information (posted: April 28, 2016) and JA 41A, Wage Determination (posted: April 28, 2016) respectively..

Update #9 ·


NOTE: The deadline date to post questions or to request site visits is 9 May 2016.

Amendment 0001 is posted to update FAR clauses and revise/add additional information regarding the Pre-proposal Conference and Site Visits.

Amendment 0002 is posted to update RFP Sections B.2.2. Schedule B-2 Fixed Price Economic Price Adjustment with correct footnote; C.12 Operations and Maintainance/Quality Management with the correct name of Operation and Maintenance Plan/Quality Management Plan; L.4 Proposal Preparation Instructions with the correct name of Operation and Maintenance Plan/Quality Management Plan.

Amendment 0003 is posted to extend the proposal submission date to:
    
     Date: Tuesday, June 7, 2016
     Time:  3:00 p.m. EST

Amendment 0004 is posted to replace JA1, Fort Jackson Electric Distribution System (January 28, 2016) and JA2, Fort Jackson Electric Natural Gas Distribution System (January 28, 2016) in their entirety and replace them with JA1, Fort Jackson Electric Distribution System (April 22, 2016) and JA2, Fort Jackson Electric Natural Gas Distribution System (April 22, 2016) respectively.

Amendment 0005 is posted to replace JA39, Past Performance Information (posted: February 5, 2016) and JA 41, Wage Determination (posted: February 5, 2016) in their entirety and replace them with JA39A, Past Performance Information (posted: April 28, 2016) and JA 41A, Wage Determination (posted: April 28, 2016) respectively.

Update #8 ·

Update 4/28/16:
Points of Contact for DLA Energy are as follows:
Vicki Warner, Contracting Officer, 703-617-1509, vicki.warner@dla.mil
Tricia Castillo, Contract Specialist, 703-617-1512, tricia.castillo@dla.mil
Nikki Hession, Contract Specialist, 703-617-1493, nikki.hession@dla.mil
Maurice Kirk, Contract Specialist, 703-617-1506, maurice.kirk@dla.mil
Instructions for access to the FBO Secure Site



To access the secured, but unclassified, documents in the FBO system, vendors must follow these instructions:



1. Register in the System for Award Management (SAM) database at https://www.sam.gov/portal/public/SAM/. For assistance with SAM, please contact the SAM help desk. Contact information is available at https://www.fsd.gov/.



2. Once registered in SAM, go to the FBO website at https://www.fbo.gov/ and log in. Verify your SAM registration within the FBO system. For assistance with FBO, please consult the FBO Vendor Guide, which is available at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf.



3. After your SAM registration is verified in the FBO system, please follow the steps as outlined below:



a) Begin by clicking on the secured document link, which should then provide you with the corresponding link for the DD Form 2345, Military Critical Technical Data Agreement. The DD2345 is also available at http://www.dlis.dla.mil/JCP/forms/DD2345Form.pdf.


b) Fill out the DD 2345 and submit a hard copy of the original form, together with all required documentation, to the Defense Logistics Information Service (DLIS), U.S./Canada Joint Certification Program (JCP), at the address listed on the form.


c) JCP will return an approved and signed certified form, which will include your certification and expiration date. Please note that delays may be incurred if forms and/or required documentation are incomplete or incorrect.


d) For assistance with the DD2345, or to inquire about the acceptability of electronic provision of documentation, please contact the U.S./Canada Joint Certification Office, DLIS. Contact information is available at http://www.dlis.dla.mil/jcp/team.aspx. DLA Energy is not involved in the approval process and cannot provide assistance with processing.


e) Once approval is received, it can take up to 24 hours for the JCP information to reach all systems.



4. Once you receive the approved DD2345 from JCP, and have verified your status on the JCP website, enter the FBO system and click on the secure document link. The FBO system will require you to enter your MPIN. If you are not prompted to enter a MPIN, please contact the FBO help desk. Contact information can be found at https://www.fsd.gov/.



a) The MPIN is a mandatory data element created by the SAM registrant which must have nine characters [consisting of at least one letter (upper or lower case) and one number, with no spaces or special characters permitted]


b) The MPIN allows access to related acquisition systems (i.e. ORCA and PPIRS). It also validates access to sensitive, but unclassified, documents associated with a notice posted to FBO.



5. Following verification of the MPIN in FBO, vendors must then submit a request for explicit access to the secure documents through the FBO system by clicking on the secure document line, then clicking the "Request Explicit Access" button. Upon requesting explicit access in the FBO system, vendors should send an email notification to the DLA Energy personnel assigned to the procurement, so that they can approve the request in the FBO system. Vendors will receive an email once the access request has been approved by DLA Energy.



Once the MPIN has been verified in the FBO system and explicit access has been granted, vendors will be able to enter the system and view the secure documents.

.

Update #7 ·

Update 4/28/16:
Points of Contact for DLA Energy are as follows:

Vicki Warner, Contracting Officer, 703-617-1509, vicki.warner@dla.mil
Tricia Castillo, Contract Specialist, 703-617-1512, tricia.castillo@dla.mil
Nikki Hession, Contract Specialist, 703-617-1493, nikki.hession@dla.mil
Maurice Kirk, Contract Specialist, 703-617-1506, maurice.kirk@dla.mil

Instructions for access to the FBO Secure Site



To access the secured, but unclassified, documents in the FBO system, vendors must follow these instructions:


 


1.            Register in the System for Award Management (SAM) database at https://www.sam.gov/portal/public/SAM/.  For assistance with SAM, please contact the SAM help desk.  Contact information is available at https://www.fsd.gov/.



2.            Once registered in SAM, go to the FBO website at https://www.fbo.gov/ and log in.  Verify your SAM registration within the FBO system.  For assistance with FBO, please consult the FBO Vendor Guide, which is available at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf.



3.           After your SAM registration is verified in the FBO system, please follow the steps as outlined below:


 


a)            Begin by clicking on the secured document link, which should then provide you with the corresponding link for the DD Form 2345, Military Critical Technical Data Agreement.  The DD2345 is also available at http://www.dlis.dla.mil/JCP/forms/DD2345Form.pdf.


b)          Fill out the DD 2345 and submit a hard copy of the original form, together with all required documentation, to the Defense Logistics Information Service (DLIS), U.S./Canada Joint Certification Program (JCP), at the address listed on the form.


c)            JCP will return an approved and signed certified form, which will include your certification and expiration date.  Please note that delays may be incurred if forms and/or required documentation are incomplete or incorrect.


d)            For assistance with the DD2345, or to inquire about the acceptability of electronic provision of documentation, please contact the U.S./Canada Joint Certification Office, DLIS.  Contact information is available at http://www.dlis.dla.mil/jcp/team.aspx.  DLA Energy is not involved in the approval process and cannot provide assistance with processing.


e)            Once approval is received, it can take up to 24 hours for the JCP information to reach all systems.


 


4.            Once you receive the approved DD2345 from JCP, and have verified your status on the JCP website, enter the FBO system and click on the secure document link.  The FBO system will require you to enter your MPIN.  If you are not prompted to enter a MPIN, please contact the FBO help desk.  Contact information can be found at https://www.fsd.gov/.


 


a)            The MPIN is a mandatory data element created by the SAM registrant which must have nine characters [consisting of at least one letter (upper or lower case) and one number, with no spaces or special characters permitted]


b)          The MPIN allows access to related acquisition systems (i.e. ORCA and PPIRS). It also validates access to sensitive, but unclassified, documents associated with a notice posted to FBO.



5.            Following verification of the MPIN in FBO, vendors must then submit a request for explicit access to the secure documents through the FBO system by clicking on the secure document line, then clicking the "Request Explicit Access" button.  Upon requesting explicit access in the FBO system, vendors should send an email notification to the DLA Energy personnel assigned to the procurement, so that they can approve the request in the FBO system.  Vendors will receive an email once the access request has been approved by DLA Energy.



Once the MPIN has been verified in the FBO system and explicit access has been granted, vendors will be able to enter the system and view the secure documents.

Update #6 ·

Amendment 0001 is posted to update FAR clauses and revise/add additional information regarding the Pre-proposal Conference and Site Visits..

Update #5 ·

Amendment 0001 is posted to update FAR clauses and revise/add additional information regarding the Pre-proposal Conference and Site Visits.

Update #4 ·

Instructions for access to the FBO Secure Site



To access the secured, but unclassified, documents in the FBO system, vendors must follow these instructions:



1. Register in the System for Award Management (SAM) database at https://www.sam.gov/portal/public/SAM/. For assistance with SAM, please contact the SAM help desk. Contact information is available at https://www.fsd.gov/.



2. Once registered in SAM, go to the FBO website at https://www.fbo.gov/ and log in. Verify your SAM registration within the FBO system. For assistance with FBO, please consult the FBO Vendor Guide, which is available at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf.



3. After your SAM registration is verified in the FBO system, please follow the steps as outlined below:



a) Begin by clicking on the secured document link, which should then provide you with the corresponding link for the DD Form 2345, Military Critical Technical Data Agreement. The DD2345 is also available at http://www.dlis.dla.mil/JCP/forms/DD2345Form.pdf.


b) Fill out the DD 2345 and submit a hard copy of the original form, together with all required documentation, to the Defense Logistics Information Service (DLIS), U.S./Canada Joint Certification Program (JCP), at the address listed on the form.


c) JCP will return an approved and signed certified form, which will include your certification and expiration date. Please note that delays may be incurred if forms and/or required documentation are incomplete or incorrect.


d) For assistance with the DD2345, or to inquire about the acceptability of electronic provision of documentation, please contact the U.S./Canada Joint Certification Office, DLIS. Contact information is available at http://www.dlis.dla.mil/jcp/team.aspx. DLA Energy is not involved in the approval process and cannot provide assistance with processing.


e) Once approval is received, it can take up to 24 hours for the JCP information to reach all systems.



4. Once you receive the approved DD2345 from JCP, and have verified your status on the JCP website, enter the FBO system and click on the secure document link. The FBO system will require you to enter your MPIN. If you are not prompted to enter a MPIN, please contact the FBO help desk. Contact information can be found at https://www.fsd.gov/.



a) The MPIN is a mandatory data element created by the SAM registrant which must have nine characters [consisting of at least one letter (upper or lower case) and one number, with no spaces or special characters permitted]


b) The MPIN allows access to related acquisition systems (i.e. ORCA and PPIRS). It also validates access to sensitive, but unclassified, documents associated with a notice posted to FBO.



5. Following verification of the MPIN in FBO, vendors must then submit a request for explicit access to the secure documents through the FBO system by clicking on the secure document line, then clicking the "Request Explicit Access" button. Upon requesting explicit access in the FBO system, vendors should send an email notification to the DLA Energy personnel assigned to the procurement, so that they can approve the request in the FBO system. Vendors will receive an email once the access request has been approved by DLA Energy.



Once the MPIN has been verified in the FBO system and explicit access has been granted, vendors will be able to enter the system and view the secure documents.

.

Update #3 ·

Instructions for access to the FBO Secure Site



To access the secured, but unclassified, documents in the FBO system, vendors must follow these instructions:


 


1.            Register in the System for Award Management (SAM) database at https://www.sam.gov/portal/public/SAM/.  For assistance with SAM, please contact the SAM help desk.  Contact information is available at https://www.fsd.gov/.



2.            Once registered in SAM, go to the FBO website at https://www.fbo.gov/ and log in.  Verify your SAM registration within the FBO system.  For assistance with FBO, please consult the FBO Vendor Guide, which is available at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf.



3.           After your SAM registration is verified in the FBO system, please follow the steps as outlined below:


 


a)            Begin by clicking on the secured document link, which should then provide you with the corresponding link for the DD Form 2345, Military Critical Technical Data Agreement.  The DD2345 is also available at http://www.dlis.dla.mil/JCP/forms/DD2345Form.pdf.


b)          Fill out the DD 2345 and submit a hard copy of the original form, together with all required documentation, to the Defense Logistics Information Service (DLIS), U.S./Canada Joint Certification Program (JCP), at the address listed on the form.


c)            JCP will return an approved and signed certified form, which will include your certification and expiration date.  Please note that delays may be incurred if forms and/or required documentation are incomplete or incorrect.


d)            For assistance with the DD2345, or to inquire about the acceptability of electronic provision of documentation, please contact the U.S./Canada Joint Certification Office, DLIS.  Contact information is available at http://www.dlis.dla.mil/jcp/team.aspx.  DLA Energy is not involved in the approval process and cannot provide assistance with processing.


e)            Once approval is received, it can take up to 24 hours for the JCP information to reach all systems.


 


4.            Once you receive the approved DD2345 from JCP, and have verified your status on the JCP website, enter the FBO system and click on the secure document link.  The FBO system will require you to enter your MPIN.  If you are not prompted to enter a MPIN, please contact the FBO help desk.  Contact information can be found at https://www.fsd.gov/.


 


a)            The MPIN is a mandatory data element created by the SAM registrant which must have nine characters [consisting of at least one letter (upper or lower case) and one number, with no spaces or special characters permitted]


b)          The MPIN allows access to related acquisition systems (i.e. ORCA and PPIRS). It also validates access to sensitive, but unclassified, documents associated with a notice posted to FBO.



5.            Following verification of the MPIN in FBO, vendors must then submit a request for explicit access to the secure documents through the FBO system by clicking on the secure document line, then clicking the "Request Explicit Access" button.  Upon requesting explicit access in the FBO system, vendors should send an email notification to the DLA Energy personnel assigned to the procurement, so that they can approve the request in the FBO system.  Vendors will receive an email once the access request has been approved by DLA Energy.



Once the MPIN has been verified in the FBO system and explicit access has been granted, vendors will be able to enter the system and view the secure documents.

Update #2 ·

DLA Energy, in conjunction with the United States Army, plans to offer the privatization of the Electric (NAICS 221122) and Natural Gas (NAICS 221210) utility systems at Fort Jackson, South Carolina.


Utilities Privatization (UP) is defined as the transfer of ownership and responsibility to a municipal, private, regional, district, or cooperative utility company or other entity, for the operations, maintenance, repair, future upgrades, and future utility systems replacements. The conveyance may consist of all right, title, and interest of the United States in the utility system. UP will be accomplished in accordance with 10 U.S.C. §2688 - Utility Systems: Conveyance Authority.



As a result of this solicitation, the firm(s) will be selected to assume ownership of the Electric and/or Natural Gas utility systems. The new owner(s) shall operate and maintain the system and provide utility services to the Government. Any resulting contract, if awarded, will require the Contractor to furnish all facilities, labor, materials, tools, and equipment necessary to own, maintain, and operate the utility system. All responsibility for maintaining reliable service, including such items as environmental compliance, maintenance costs, major system renovations, construction, equipment, manpower, and overhead costs shall become the utility system owner's responsibility. The Contractor shall manage the maintenance, repairs, replacement, etc., of the system to ensure continuous, adequate, and dependable service for each Government or tenant connection within the service area. The Contractor shall be responsible for funding all capital investments required to acquire, maintain, and operate the utility system in a safe, reliable condition and to meet the requirements listed in the contract.



Real property interests will be conveyed in the form of a Right to Access or an Easement as a reference to the resultant contract. The utility system will be conveyed via a Bill of Sale upon award of the contract. Past performance information from potential offerors shall be submitted as directed in the solicitation.



A Sources Sought Notice for this requirement was previously publicized under solicitation number SPE600-16-R-0805 on October 5, 2015. The Sources Sought Notice has closed and market research is complete. This requirement will be unrestricted. All responsible sources are encouraged to submit an offer.



Other-than-small businesses are required to submit a subcontracting plan with their offer. Interested sources may contact Vicki Warner at Vicki.Warner@dla.mil, Tricia Ann Castillo at Tricia.Castillo@dla.mil, or Nikki Hession at Nikki.Hession@dla.mil to be added to our offeror mailing list.



A copy of the solicitation will be available on or after January 28, 2016, via the Federal Business Opportunity (FBO) system (https://www.fbo.gov).



Secure Documents



As this requirement will be an unrestricted, competitive action, several of the solicitation documents will be posted as "secured" on the Federal Business Opportunity ("FedBizOpps" or "FBO") website. In order to view those documents, vendors will need to obtain special access. The process of obtaining access is somewhat lengthy, therefore all interested vendors are encouraged to begin that process as soon as possible. Instructions for obtaining access are provided below.



Should any party have issues with obtaining access to FBO or the secure documents, they must notify the contracting office no later than January 15, 2016. Notifications to the contracting office of the inability to access secure documents after that suspense will not be a consideration in extensions to the Request for Proposal date. To ensure all parties are able to retrieve secure documents for this solicitation, a test document has been placed under secure package: SPE600-16-R-0805-01.



Please note that FBO has updated their security requirements, which requires that previously registered users must reactivate their account. See www.fbo.gov for more information.



Instructions for access to the FBO Secure Site



To access the secured, but unclassified, documents in the FBO system, vendors must follow these instructions:



1. Register in the System for Award Management (SAM) database at https://www.sam.gov/portal/public/SAM/. For assistance with SAM, please contact the SAM help desk. Contact information is available at https://www.fsd.gov/.



2. Once registered in SAM, go to the FBO website at https://www.fbo.gov/ and log in. Verify your SAM registration within the FBO system. For assistance with FBO, please consult the FBO Vendor Guide, which is available at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf.



3. After your SAM registration is verified in the FBO system, please follow the steps as outlined below:



a) Begin by clicking on the secured document link, which should then provide you with the corresponding link for the DD Form 2345, Military Critical Technical Data Agreement. The DD2345 is also available at http://www.dlis.dla.mil/JCP/forms/DD2345Form.pdf.


b) Fill out the DD 2345 and submit a hard copy of the original form, together with all required documentation, to the Defense Logistics Information Service (DLIS), U.S./Canada Joint Certification Program (JCP), at the address listed on the form.


c) JCP will return an approved and signed certified form, which will include your certification and expiration date. Please note that delays may be incurred if forms and/or required documentation are incomplete or incorrect.


d) For assistance with the DD2345, or to inquire about the acceptability of electronic provision of documentation, please contact the U.S./Canada Joint Certification Office, DLIS. Contact information is available at http://www.dlis.dla.mil/jcp/team.aspx. DLA Energy is not involved in the approval process and cannot provide assistance with processing.


e) Once approval is received, it can take up to 24 hours for the JCP information to reach all systems.



4. Once you receive the approved DD2345 from JCP, and have verified your status on the JCP website, enter the FBO system and click on the secure document link. The FBO system will require you to enter your MPIN. If you are not prompted to enter a MPIN, please contact the FBO help desk. Contact information can be found at https://www.fsd.gov/.



a) The MPIN is a mandatory data element created by the SAM registrant which must have nine characters [consisting of at least one letter (upper or lower case) and one number, with no spaces or special characters permitted]


b) The MPIN allows access to related acquisition systems (i.e. ORCA and PPIRS). It also validates access to sensitive, but unclassified, documents associated with a notice posted to FBO.



5. Following verification of the MPIN in FBO, vendors must then submit a request for explicit access to the secure documents through the FBO system by clicking on the secure document line, then clicking the "Request Explicit Access" button. Upon requesting explicit access in the FBO system, vendors should send an email notification to the DLA Energy personnel assigned to the procurement, so that they can approve the request in the FBO system. Vendors will receive an email once the access request has been approved by DLA Energy.



Once the MPIN has been verified in the FBO system and explicit access has been granted, vendors will be able to enter the system and view the secure documents.

.

Update #1 ·

DLA Energy, in conjunction with the United States Army, plans to offer the privatization of the Electric (NAICS 221122) and Natural Gas (NAICS 221210) utility systems at Fort Jackson, South Carolina.


Utilities Privatization (UP) is defined as the transfer of ownership and responsibility to a municipal, private, regional, district, or cooperative utility company or other entity, for the operations, maintenance, repair, future upgrades, and future utility systems replacements.  The conveyance may consist of all right, title, and interest of the United States in the utility system.  UP will be accomplished in accordance with 10 U.S.C. §2688 - Utility Systems: Conveyance Authority. 



As a result of this solicitation, the firm(s) will be selected to assume ownership of the Electric and/or Natural Gas utility systems.  The new owner(s) shall operate and maintain the system and provide utility services to the Government.  Any resulting contract, if awarded, will require the Contractor to furnish all facilities, labor, materials, tools, and equipment necessary to own, maintain, and operate the utility system.  All responsibility for maintaining reliable service, including such items as environmental compliance, maintenance costs, major system renovations, construction, equipment, manpower, and overhead costs shall become the utility system owner's responsibility.  The Contractor shall manage the maintenance, repairs, replacement, etc., of the system to ensure continuous, adequate, and dependable service for each Government or tenant connection within the service area.  The Contractor shall be responsible for funding all capital investments required to acquire, maintain, and operate the utility system in a safe, reliable condition and to meet the requirements listed in the contract. 



Real property interests will be conveyed in the form of a Right to Access or an Easement as a reference to the resultant contract.  The utility system will be conveyed via a Bill of Sale upon award of the contract.  Past performance information from potential offerors shall be submitted as directed in the solicitation.



A Sources Sought Notice for this requirement was previously publicized under solicitation number SPE600-16-R-0805 on October 5, 2015.  The Sources Sought Notice has closed and market research is complete.  This requirement will be unrestricted.  All responsible sources are encouraged to submit an offer.    



Other-than-small businesses are required to submit a subcontracting plan with their offer.  Interested sources may contact Vicki Warner at Vicki.Warner@dla.mil, Tricia Ann Castillo at Tricia.Castillo@dla.mil, or Nikki Hession at Nikki.Hession@dla.mil to be added to our offeror mailing list.    



A copy of the solicitation will be available on or after January 28, 2016, via the Federal Business Opportunity (FBO) system (https://www.fbo.gov). 



Secure Documents



As this requirement will be an unrestricted, competitive action, several of the solicitation documents will be posted as "secured" on the Federal Business Opportunity ("FedBizOpps" or "FBO") website.  In order to view those documents, vendors will need to obtain special access.  The process of obtaining access is somewhat lengthy, therefore all interested vendors are encouraged to begin that process as soon as possible.  Instructions for obtaining access are provided below.



Should any party have issues with obtaining access to FBO or the secure documents, they must notify the contracting office no later than January 15, 2016.  Notifications to the contracting office of the inability to access secure documents after that suspense will not be a consideration in extensions to the Request for Proposal date.  To ensure all parties are able to retrieve secure documents for this solicitation, a test document has been placed under secure package: SPE600-16-R-0805-01. 



Please note that FBO has updated their security requirements, which requires that previously registered users must reactivate their account.  See www.fbo.gov for more information.



Instructions for access to the FBO Secure Site



To access the secured, but unclassified, documents in the FBO system, vendors must follow these instructions:


 


1.            Register in the System for Award Management (SAM) database at https://www.sam.gov/portal/public/SAM/.  For assistance with SAM, please contact the SAM help desk.  Contact information is available at https://www.fsd.gov/.



2.            Once registered in SAM, go to the FBO website at https://www.fbo.gov/ and log in.  Verify your SAM registration within the FBO system.  For assistance with FBO, please consult the FBO Vendor Guide, which is available at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf.



3.           After your SAM registration is verified in the FBO system, please follow the steps as outlined below:


 


a)            Begin by clicking on the secured document link, which should then provide you with the corresponding link for the DD Form 2345, Military Critical Technical Data Agreement.  The DD2345 is also available at http://www.dlis.dla.mil/JCP/forms/DD2345Form.pdf.


b)          Fill out the DD 2345 and submit a hard copy of the original form, together with all required documentation, to the Defense Logistics Information Service (DLIS), U.S./Canada Joint Certification Program (JCP), at the address listed on the form.


c)            JCP will return an approved and signed certified form, which will include your certification and expiration date.  Please note that delays may be incurred if forms and/or required documentation are incomplete or incorrect.


d)            For assistance with the DD2345, or to inquire about the acceptability of electronic provision of documentation, please contact the U.S./Canada Joint Certification Office, DLIS.  Contact information is available at http://www.dlis.dla.mil/jcp/team.aspx.  DLA Energy is not involved in the approval process and cannot provide assistance with processing.


e)            Once approval is received, it can take up to 24 hours for the JCP information to reach all systems.


 


4.            Once you receive the approved DD2345 from JCP, and have verified your status on the JCP website, enter the FBO system and click on the secure document link.  The FBO system will require you to enter your MPIN.  If you are not prompted to enter a MPIN, please contact the FBO help desk.  Contact information can be found at https://www.fsd.gov/.


 


a)            The MPIN is a mandatory data element created by the SAM registrant which must have nine characters [consisting of at least one letter (upper or lower case) and one number, with no spaces or special characters permitted]


b)          The MPIN allows access to related acquisition systems (i.e. ORCA and PPIRS). It also validates access to sensitive, but unclassified, documents associated with a notice posted to FBO.



5.            Following verification of the MPIN in FBO, vendors must then submit a request for explicit access to the secure documents through the FBO system by clicking on the secure document line, then clicking the "Request Explicit Access" button.  Upon requesting explicit access in the FBO system, vendors should send an email notification to the DLA Energy personnel assigned to the procurement, so that they can approve the request in the FBO system.  Vendors will receive an email once the access request has been approved by DLA Energy.



Once the MPIN has been verified in the FBO system and explicit access has been granted, vendors will be able to enter the system and view the secure documents.

Files

Show all 22

Notice history

Notice Type Posted
This notice Award Award Notice
Fort Jackson Electric and Natural Gas Utility Services Latest pre-solicitation Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors