Forest Service - 23N60 3. 2 ERFO MSE Wall
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 127EAW25R0046
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- California, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service is soliciting proposals for the construction of a Mechanically Stabilized Earth (MSE) wall along Forest Service Road 23N60 near Mable Creek in the Plumas National Forest, California. This road repair project addresses damage from significant rainfall and erosion in the North Complex fire scar area and includes roadway excavation, MSE wall installation with drainage systems, riprap placement, erosion control measures, and road surface reconstruction. Contractors must possess California road repair licenses and submit comprehensive documentation including bonds, materials approvals, and safety plans, while adhering to strict work restrictions such as limited hours and archaeological monitoring requirements. The contract will be awarded using a tradeoff source selection method evaluating proposals based on past performance, work plan, key personnel, performance schedule, and price. Critical dates include an organized site visit on August 5, 2025 at 10:00 AM PDT, a deadline for Request for Information submissions to Contract Specialist Tanya Torres by August 8, 2025 at 10:00 AM PDT, and proposal submissions due by August 19, 2025 at 11:00 AM.
This opportunity is designated as a Total Small Business Set Aside with an estimated contract value between $500,000 and $1,000,000 under NAICS code 237310 for Highway, Street, and Bridge Construction. No incumbent contractors are identified in the solicitation documents. The project includes specific quantities such as 1,050 cubic yards of roadway excavation, 2,304 square feet of wire-faced MSE wall, and 115-125 linear feet of underdrain systems across 10 pay items. The performance period is 90 calendar days starting 10 days after contract award, with an estimated start date of September 2025. The work will be performed in the Plumas National Forest, specifically in Township 21N, Range 7E, Section 5, with contractors required to work within California's fire precautionary period restrictions from April 1 through December 1.
Notice text
2 versions
Update #2 · Latest ·
DATE 8/12/2025
PROJECT: 23N60 3.2 ERFO MSE Wall
Plumas National Forest
Amendment A00001
The purpose of solicitation amendment A00001 is to provide Request For Information (RFI) Responses. The RFI responses are incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.
See attachment for additional information.
====================================================
127EAW25R0046 - 23N60 3.2 ERFO MSE Wall
Plumas National Forest
FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $500,000 and $1,000,000
Set Aside: Total Small Business Set Aside
IMPORTANT NOTES:
Refer to Section L, Paragraph L.2, on Page 34 for detailed instructions regarding the submission of proposals, including the required documents and information to be provided.
All Requests for Information (RFI's) shall be submitted to the Contract Specialist, Tanya Torres on the attached RFI form not later than 1000 AM hours PDT, August 8th, 2025.
An organized site visit is scheduled for 5 August, 2025 at 10:00 AM hours PDT; please refer to page 38 for detailed information regarding the site visit.
In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Update #1 ·
127EAW25R0046 - 23N60 3.2 ERFO MSE Wall
Plumas National Forest
FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $500,000 and $1,000,000
Set Aside: Total Small Business Set Aside
IMPORTANT NOTES:
Refer to Section L, Paragraph L.2, on Page 34 for detailed instructions regarding the submission of proposals, including the required documents and information to be provided.
All Requests for Information (RFI's) shall be submitted to the Contract Specialist, Tanya Torres on the attached RFI form not later than 1000 AM hours PDT, August 8th, 2025.
An organized site visit is scheduled for 5 August, 2025 at 10:00 AM hours PDT; please refer to page 38 for detailed information regarding the site visit.
In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Forest Service - 23N60 3. 2 ERFO MSE Wall | Award Notice | |
| This notice | Solicitation | |
| Forest Service - 23N60 3. 2 ERFO MSE Wall | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| GOGA 336173 - Repair Conzelman Road | National Office | No set-aside | |
| GAOA Facilities, Barracks Inyo NF | Forest Service | Total Small Business | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business |