Forest Road 29 MP 15. 9, 16. 1, & 18. 3, Culvert Replacements
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 1205G220R0001
- Agency
- Region 6 - Pacific Northwest Region Forest Service, Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Olympia WA 98512 USA
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service Pacific Northwest Region will issue a Request for Proposals on or around February 14, 2020 to replace culverts at mile markers 15.9, 16.1, and 18.3 on Forest Road 29 in the Olympic National Forest in Washington. The solicitation will include options for removing the existing culverts and installing new galvanized metal culverts at each of the three locations. Offerors will be evaluated based on their past performance, experience, and price, with past performance and experience combined being as important as price. Work must begin by August 1, 2020 and be completed by September 30, 2020.
This is a 100% set-aside for small businesses requiring Davis-Bacon wage rates. The estimated value is between $100,000 and $500,000, and the NAICS code is 237110. The contract type will be firm-fixed price, and offerors must provide bid, payment, and performance bonds and register with SAM. Construction must be completed by September 30, 2020 for one of the three culvert locations, with the possibility of additional funding for the other two locations. Interested parties should contact the identified project manager.
Notice text
3 versions
Update #3 · Latest ·
Forest Road 29 MP 15.9, 16.1, & 18.3, Culvert Replacements
The project consists of removing an existing culvert(s) and replacing with galvanized metal culvert(s).
Access to the project site may be limited due to seasonal snow fall, therefore interested offerors should consider visiting the site prior to the release of the final solicitation.
The government will provide final design drawings of the culvert(s) with the final solicitation.
Work will include working within an approved work window under the guidelines of a hydraulic permit, a limited road closure and include fish and wildlife provisions. Work on the ground is expected to begin as early as August 1, 2020 with the entire project completion by September 30, 2020.
Offerors will be evaluated on: past performance, experience and price. Past performance and experience combined are as important as price.
Construction methods will include survey and staking, contractor testing, installing and maintaining soil erosion and pollution control measures, clearing and grubbing, excavation and backfill, riprap placement, aggregate surface placing, and installing and maintaining approved closure sign and barriers.
Project Location
The project is located on the Olympic National Forest on the Pacific Ranger Districts. From Forks, Washington, travel north on US Highway 101 for one mile. Then turn east (RIGHT) onto Forest Service Road 29 and proceed the project sites.
Project Manager is Mr. Shannon Henriquez, 360-956-2264, or email shannon.henriquez@usda.gov .
The Forest Service will proceed to issue a solicitation as a Request for Proposals (RFP) on, or about, APR. 20, 2020. Solicitation will be for three option items: FSR 29 MP 15.9; M.P. 16.1; and M.P. 18.3. Currently, funds are available for one of the options. Additional funds are being sought. This acquisition is 100 percent set-aside for small business concerns. The Forest Service will award a firm fixed-price contract to that responsible Offeror whose offer, conforming to the solicitation, is fair and reasonable, and has been determined to be the best value to the Forest Service. Offers will be evaluated based upon: price; experience and past performance. The government estimated value is between $100,000 and $500,000.
A bid bond is required. Performance and payment bonds are required for this project. Construction Wage Rates (former known as Davis-Bacon wage rates) apply to any resulting contract. The proposed contract-type is firm-fixed price.
All responsible sources may submit an offer which will be considered by the government. Prospective contractor must be registered in the System for Award Management (SAM) database prior to award of a contract. Lack of registration in the SAM on the part of the offeror will render an offeror ineligible for award. Offerors may obtain information on registration and annual confirmation requirements by contacting askSAM@gsa.gov, or via the Internet at http://www.sam.gov.
For additional information contact Mr. Miley Sutherland, Contracting Officer at 360-956-2471, or Mr. Shannon Henriquez, 360-956-2264, or email shannon.henriquez@usda.gov .
Update #2 ·
Forest Road 29 MP 15.9, 16.1, & 18.3, Culvert Replacements
Project is currently being reviewed. Solicitation will be released upon approval of the national office.
The project consists of removing an existing culvert(s) and replacing with galvanized metal culvert(s).
Access to the project site may be limited due to seasonal snow fall, therefore interested offerors should consider visiting the site prior to the release of the final solicitation.
The government will provide final design drawings of the culvert(s) with the final solicitation.
Work will include working within an approved work window under the guidelines of a hydraulic permit, a limited road closure and include fish and wildlife provisions. Work on the ground is expected to begin as early as August 1, 2020 with the entire project completion by September 30, 2020.
Offerors will be evaluated on: past performance, experience and price. Past performance and experience combined are as important as price.
Construction methods will include survey and staking, contractor testing, installing and maintaining soil erosion and pollution control measures, clearing and grubbing, excavation and backfill, riprap placement, aggregate surface placing, and installing and maintaining approved closure sign and barriers.
Project Location
The project is located on the Olympic National Forest on the Pacific Ranger Districts. From Forks, Washington, travel north on US Highway 101 for one mile. Then turn east (RIGHT) onto Forest Service Road 29 and proceed the project sites.
Project Manager is Mr. Shannon Henriquez, 360-956-2264, or email shannon.henriquez@usda.gov .
The Forest Service will proceed to issue a solicitation as a Request for Proposals (RFP) on, or about, FEB. 14, 2020. Solicitation will be for three option items: FSR 29 MP 15.9; M.P. 16.1; and M.P. 18.3. Currently, funds are available for one of the options. Additional funds are being sought. This acquisition is 100 percent set-aside for small business concerns. The Forest Service will award a firm fixed-price contract to that responsible Offeror whose offer, conforming to the solicitation, is fair and reasonable, and has been determined to be the best value to the Forest Service. Offers will be evaluated based upon: price; experience and past performance. The government estimated value is between $100,000 and $500,000.
A bid bond is required. Performance and payment bonds are required for this project. Construction Wage Rates (former known as Davis-Bacon wage rates) apply to any resulting contract. The proposed contract-type is firm-fixed price.
All responsible sources may submit an offer which will be considered by the government. Prospective contractor must be registered in the System for Award Management (SAM) database prior to award of a contract. Lack of registration in the SAM on the part of the offeror will render an offeror ineligible for award. Offerors may obtain information on registration and annual confirmation requirements by contacting askSAM@gsa.gov, or via the Internet at http://www.sam.gov.
For additional information contact Mr. Miley Sutherland, Contracting Officer at 360-956-2471, or Mr. Shannon Henriquez, 360-956-2264, or email shannon.henriquez@usda.gov .
Update #1 ·
Forest Road 29 MP 15.9, 16.1, & 18.3, Culvert Replacements
The project consists of removing an existing culvert(s) and replacing with galvanized metal culvert(s).
Access to the project site may be limited due to seasonal snow fall, therefore interested offerors should consider visiting the site prior to the release of the final solicitation.
The government will provide final design drawings of the culvert(s) with the final solicitation.
Work will include working within an approved work window under the guidelines of a hydraulic permit, a limited road closure and include fish and wildlife provisions. Work on the ground is expected to begin as early as August 1, 2020 with the entire project completion by September 30, 2020.
Offerors will be evaluated on: past performance, experience and price. Past performance and experience combined are as important as price.
Construction methods will include survey and staking, contractor testing, installing and maintaining soil erosion and pollution control measures, clearing and grubbing, excavation and backfill, riprap placement, aggregate surface placing, and installing and maintaining approved closure sign and barriers.
Project Location
The project is located on the Olympic National Forest on the Pacific Ranger Districts. From Forks, Washington, travel north on US Highway 101 for one mile. Then turn east (RIGHT) onto Forest Service Road 29 and proceed the project sites.
Project Manager is Mr. Shannon Henriquez, 360-956-2264, or email shannon.henriquez@usda.gov .
The Forest Service will proceed to issue a solicitation as a Request for Proposals (RFP) on, or about, FEB. 14, 2020. Solicitation will be for three option items: FSR 29 MP 15.9; M.P. 16.1; and M.P. 18.3. Currently, funds are available for one of the options. Additional funds are being sought. This acquisition is 100 percent set-aside for small business concerns. The Forest Service will award a firm fixed-price contract to that responsible Offeror whose offer, conforming to the solicitation, is fair and reasonable, and has been determined to be the best value to the Forest Service. Offers will be evaluated based upon: price; experience and past performance. The government estimated value is between $100,000 and $500,000.
A bid bond is required. Performance and payment bonds are required for this project. Construction Wage Rates (former known as Davis-Bacon wage rates) apply to any resulting contract. The proposed contract-type is firm-fixed price.
All responsible sources may submit an offer which will be considered by the government. Prospective contractor must be registered in the System for Award Management (SAM) database prior to award of a contract. Lack of registration in the SAM on the part of the offeror will render an offeror ineligible for award. Offerors may obtain information on registration and annual confirmation requirements by contacting askSAM@gsa.gov, or via the Internet at http://www.sam.gov.
For additional information contact Mr. Miley Sutherland, Contracting Officer at 360-956-2471, or Mr. Shannon Henriquez, 360-956-2264, or email shannon.henriquez@usda.gov .
Attachments
| File | Type | Posted |
|---|---|---|
| J-8 Wage Determination No. WA20200001.pdf | ||
| Sol_No_1205G220R0001.pdf | ||
| J-3 Supplemental Specifications.pdf | ||
| J-10 Bid Bond SF24.pdf | ||
| J-2 Standard Specification Index.pdf | ||
| J-12 Performance Bond SF 25.pdf | ||
| J-4 FSR 29 MP15.9 Plans.pdf | ||
| J-5 FSR 29 MP16.1 Plans.pdf | ||
| J-6 FSR 29 MP18.3 Plans.pdf | ||
| J-9 PNW Fire Protection and Suppression Plan.pdf | ||
| J-7 WDFW USFS MOU 2012 Combined_Executed.pdf | ||
| J-11 Payment Bond SF 25a.pdf | ||
| J-1 Definition and Acronyms.pdf |
Show all 13
Notice history
| Notice | Type | Posted |
|---|---|---|
| FSR 29 M. P. 15. 9, 16. 1, & 18. 3 Culvert Replacement(s) | Award Notice | |
| Forest Road 29 MP 15. 9, 16. 1, & 18. 3, Culvert Replacements | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity