J-2 Standard Specification Index.pdf
PDF 422 KB Posted
- Attached to
- Forest Road 29 MP 15. 9, 16. 1, & 18. 3, Culvert Replacements Federal contract opportunity
- Solicitation number
- 1205G220R0001
About this file
This document provides details for a federal contract opportunity to replace culverts on Forest Road 29 at mileposts 15.9, 16.1, and 18.3 on the Olympic National Forest in Washington. The project consists of removing existing culverts and replacing them with galvanized metal culverts. Work will include working within an approved window under a hydraulic permit and include fish and wildlife provisions. Construction methods will include survey and staking, contractor testing, installing and maintaining erosion control, clearing and grubbing, excavation and backfill, riprap placement, and aggregate surface placing. The solicitation number is 1205G220R0001. The contracting agency is the US Department of Agriculture Forest Service Pacific Northwest Region. The anticipated award amount is between $100,000 and $500,000. The proposed contract type is firm-fixed price. The small business set-aside requires Davis Bacon wage rates, bid bonds, and payment and performance bonds. The response deadline is February 14, 2020 with work expected to begin August 1, 2020 and be complete by September 30, 2020. Offerors will be evaluated on past performance, experience, and price, with past performance and experience combined being as important as price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J-8 Wage Determination No. WA20200001.pdf | ||
| Sol_No_1205G220R0001.pdf | ||
| J-3 Supplemental Specifications.pdf | ||
| J-10 Bid Bond SF24.pdf | ||
| J-12 Performance Bond SF 25.pdf | ||
| J-4 FSR 29 MP15.9 Plans.pdf | ||
| J-5 FSR 29 MP16.1 Plans.pdf | ||
| J-6 FSR 29 MP18.3 Plans.pdf | ||
| J-9 PNW Fire Protection and Suppression Plan.pdf | ||
| J-1 Definition and Acronyms.pdf | ||
| J-7 WDFW USFS MOU 2012 Combined_Executed.pdf | ||
| J-11 Payment Bond SF 25a.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J.2 Standard Specification Index
STANDARD SPECIFICATIONS
FOR CONSTRUCTION OF
ROADS AND BRIDGES
ON FEDERAL HIGHWAY PROJECTS
FP-03
US CUSTOMARY UNITS
Project
Name:
FSR 29 M.P. 15.9, 16.1 and 18.3
Culvert Replacement(s)
Date: 2/25/2020
Title Revised
Date
M.P.
15.7
Preface 03/15/2004 X
100 General Requirements X
101 - Terms, Format, and Definitions X
00 FLH FP-03 Corrections 07/25/2005 X
01 Meaning of Terms 01/22/2009
01 Meaning of Terms 01/22/2009 X
03 Abbreviations and Symbols 06/16/2006 X
04 Symbols 03/29/2007 X
04 Definitions 11/06/2007
102 - Bid, Award, and Execution of Contract X
00 Delete 102 in its entirety 02/16/2005 X
103 - Scope of Work X
00 Intent of Contract 02/16/2005 X
104 - Control of Work X
00 Deletions to 104 06/16/2006 X
03 Specifications and Drawings 02/22/2005
03 Specifications and Drawings 01/22/2009
03 Specifications and Drawings 02/22/2005
06 Use of Roads by Contractor 02/17/2005 X
07 Other Contracts 02/17/2005 X
105 - Control of Material X
02 Material Sources 02/17/2005
02 Material Sources 02/17/2005
02 Material Sources 01/18/2007 X
02 Material Sources 02/17/2005
02 Material Sources 02/17/2005 X
02 Government-provided sources 03/29/2005
02 Contractor-provided material sources 03/08/2007 X
05 Use of Material Found in the Work 05/12/2004 X
106 - Acceptance of Work X
01 Conformity with contract requirements 01/17/2013 X
01 Conformity with contract requirements 07/31/2007
07 Partial and Final Acceptance 05/11/2004 X
107 - Legal Relations and Responsibility To the Public X
02 Protection and Restoration of Property and
Landscape
02/17/2005
05 Responsibility for Damage Claims 05/11/2004 X
06 Contractor Responsibility for Work 06/16/2006 X
08 Sanitation, Health, and Safety 05/11/2004
08 Sanitation, Health & Safety 03/29/2005
09 Legal Relationship of the Parties 06/16/2006 X
10 Environmental Protection 06/16/2006 X
11 Protection of Forests, Parks, and Public Lands 02/17/2005
108 - Prosecution and Progress X
00 Delete Section 108 in entirety 02/16/2005 X
109 - Measurement and Payment X
00 Deletions 02/17/2005 X
02 Measurement Terms and Definitions 06/16/2006 X
03 Weighing Procedures and Devices 02/17/2005
03 Weighing Procedures and Devices 03/29/2005
150 Project Requirements X
151 – Mobilization X
03 Payment 08/05/2005
152 - Construction Survey and Staking X
00 Construction Survey and Staking 08/05/2005 X
153 - Contractor Quality Control X
02 Contractor Quality Control Plan 02/17/2005 X
04 Records 10/24/2007 X
154 - Contractor Sampling and Testing X
01 Description 05/24/2005 X
155 - Schedules for Construction Contracts X
00 Contractor Quality Control Plan, Records 05/11/2004 X
156 - Public Traffic X
00 Complete specification 04/17/2007 X
03 Accommodating Traffic During Work 02/24/2005 X
04 Maintaining Roadways During Work 02/24/2005
08 Traffic and Safety Supervisor 02/24/2005
157 - Soil Erosion Control X
03 General 02/24/2005 X
170 - Develop Water Supply and Watering
00 Complete Specification 03/30/2005
171 - Weed and Disease Prevention X
00 Complete Specification 03/30/2005 X
183 - P Line Survey
00 Complete Specification 03/30/2005
185 - Low Volume Road Design
00 Complete Specification 02/24/2005
200 Earthwork X
201 - Clearing and Grubbing X
00 Deletions 08/05/2009 X
01 Description 02/18/2005 X
04 Clearing 02/18/2005
04 Clearing 02/22/2005 X
04 Clearing 03/03/2005
06 Disposal 02/18/2005
06 Disposal 02/23/2005
06 Disposal 02/23/2005
06 Disposal 11/04/2004
06 Disposal 05/12/2004
06 Disposal 11/09/2005 X
203 - Removal of Structures and Obstructions X
01 Description 02/25/2005 X
02 Material 02/18/2005
04 Removing Material 02/18/2005 X
05 Disposing of Material 02/24/2005
05 Disposing of Material 02/18/2005 X
05 Disposing of Material 02/18/2005
08 Payment 02/24/2005 X
204 - Excavation and Embankment X
00 Complete Specification 03/26/2009 X
05 Conservation of Topsoil 02/18/2005
06 Roadway Excavation 03/02/2005
06 Roadway Excavation 03/02/2005
06 Roadway Excavation 03/02/2005
09 Preparing Foundation for Embankment
Construction
03/02/2005
10 Embankment Construction 03/02/2005
11 Compaction 04/11/2005
13 Sloping, Shaping, and Finishing 03/02/2005
13 Sloping, Shaping, and Finishing 03/02/2005
14 Disposal of Unsuitable or Excess Material 03/02/2005
15 Acceptance 02/07/2007
205 - Rock Blasting
02 Regulations 05/13/2004
06 Preblast condition survey and vibration monitoring and control
05/12/2004
07 Test Blasting 05/12/2004
08 Controls 05/12/2004
209 - Structure Excavation and Backfill X
00 Complete Spec. 209A; Exc & Backfill for selected Minor Structures. NOT a Replacement for 209.
03/24/2008
10 Backfill 10/23/2007 X
11 Compacting 02/24/2005 X
211 – Roadway Obliteration
01 Description 03/30/2005
01 Description 03/30/2005
02 Construction Requirements 02/25/2005
212 – Linear Grading
00 Complete Specification (composite road construction)
05/19/2005
213 – Subgrade Stabilization
02 FLH FP-03 Correction metric 09/06/2005
250 Structural Embankments X
251 – Riprap X
03 General 06/18/2007 X
252 – Special Rock Embankment and Rock Buttress
02 Material – Placing Rock 05/13/2004
255 – Mechanically Stabilized Earth Walls
02 Material – Acceptance 02/25/2005
262 – Reinforced Soil Embankment
00 Complete Specification 05/14/2004
01 Table 262-1 Sampling & Testing
Requirements
05/14/2004
300 Aggregate Courses X
301 – Untreated Aggregate Courses
00 Title Change 03/03/2005
01 Work 03/03/2005
02 Material 05/16/2005
03 General 09/14/2005
04 Mixing and Spreading 03/03/2005
05 Compacting 05/17/2005
06 Surface Tolerance 03/03/2005
08 Acceptance 03/03/2005
08 Acceptance 03/03/2005
08 Acceptance 03/30/2005
09 Measurement 07/07/2005
10 Payment 03/03/2005
302 - Treated Aggregate Courses
00 Deletes 302 in its entirety 02/16/2005
03 FLH FP-03 Corrections metric 08/12/2004
303 - Road Reconditioning
01 Description 03/02/2005
06 Aggregate Surface Reconditioning 05/17/2005
07 Roadway Reconditioning 03/02/2005
11 Measurement 03/29/2005
306 - Dust Palliative
03 General 03/02/2005
04 Preparation and Application 03/02/2005
06 Acceptance 03/02/2005
10 Table 306-1 Sampling & Testing 03/02/2005
320 - Stockpiled Aggregates
00 Complete Specification 03/02/2005
321 - Major Aggregate Courses
00 Complete Specification 12/19/2005
322 - Minor Aggregate Courses
00 Complete Specification 10/14/2011
324 – Minor Aggregate, Commercial Source
00 Complete Specification 08/28/2008 X
400 Asphalt Pavements and Surface Treatments
401 - Super pave Hot Asphalt Concrete Pavement
01 FLH FP-03 Correction metric uscu 08/12/2004
04 FLH FP-03 Correction uscu 08/12/2004
402 - Hot Asphalt Concrete Pavement by Hveem or Marshall Mix
Design Method
03 FLH FP-03 Correction metric uscu 08/12/2004
403 - Hot Asphalt Concrete Pavement
06 Surface Preparation 05/17/2005
16 Pavement Smoothness & Testing 03/02/2005
17 Acceptance 03/02/2005
17 Acceptance 03/02/2005
404 - Minor Hot Asphalt Concrete
02 Composition of Mix (Job-Mix Formula) 03/02/2005
04 Weather Limitations 03/02/2005
06 Placing 03/02/2005
07 Compacting (a) 03/02/2005
07 Compacting (b) 03/02/2005
09 Acceptance 03/02/2005
409 - Asphalt Surface Treatment
02 Material 05/12/2004
06 Weather, date, time 05/12/2004
08 Application 06/21/2005
10 FLH FP-03 Corrections uscu 08/12/2004
11 table409-2 12/18/2004
12 FLH FP-03 Correction uscu 08/12/2004
13 Acceptance & Testing 05/13/2004
411 - Asphalt Prime Coat
06 Application 05/12/2004
414 - Asphalt Pavement Crack and Joint Sealing
02 Material 05/12/2004
05 Cleaning & Sealing 05/12/2004
430 - Asphalt Pavement Patching
00 Complete Specification 05/12/2004
550 Bridge Construction
552 - Structural Concrete
13 FLH FP-03 Correction metric uscs 08/12/2004
571 - Prefabricated Bridges
00 Complete Specification 03/15/2005
572 - Log Stringer Bridges
00 Complete Specification 05/12/2004
573 - Bridge Repair
00 Complete Specification 05/12/2004
600 Incidental Construction
601 - Minor Concrete
00 Replace Specification 05/14/2004
02 Table 601-2 Sampling & Testing 03/02/2005
602 - Culverts and Drains X
03 General 09/06/2005 X
06 Laying Plastic Pipe 08/05/2009 X
603 - Structural Plate Structures X
03 General 03/02/2005
04 Erecting 03/02/2005
607 - Cleaning, Reconditioning, and Repairing Existing Drainage
04 Cleaning Culverts in Place 03/02/2005
625 - Turf Establishment X
03 General 02/25/2005
03 General 07/02/2007 X
04 Preparing Seedbed 02/25/2005
05 Watering 03/30/2005
05 Watering 03/02/2005
07 Seeding 02/25/2005
633 - Permanent Traffic Control
02 Material 03/03/2005
03 General 03/03/2005
05 Panels 03/03/2005
634 - Permanent Pavement Marking
03 General 03/03/2005
635 - Temporary Traffic Control X
03 General 05/13/2004 X
648 - Stream Simulation
00 Complete Specification 03/15/2005
650 - Road Closure Devices
00 Complete Specification 06/28/2007
651 - Development of Pits & Quarries X
00 Complete Specification 03/02/2005 X
700 Material X
703 – Aggregate X
05 Subbase, Base, & Surface Course Aggregate 08/14/2009 X
06 Flakiness Index and Adherent Coatings 03/02/2005
07 FLH FP-03 Correction metric uscu 03/02/2005
10 FLH FP-03 Correction 03/02/2005
704 - Soil
02 FLH FP-03 Correction Bedding Material 03/02/2005
02 FLH FP-03 Modification - Bedding Material metric uscu
03/02/2005
705 – Rock X
02 Riprap Rock 08/05/2009 X
08 Channel Rock 04/17/2008 X
712 - Joint Material
01 Sealants, Fillers, Seals, and Sleeves 03/02/2005
713 - Roadside Improvement Material X
05 Mulch 03/02/2005 X
714 - Geotextile and Geocomposite Drain Material X
03 Geogrids 02/25/2005
718 - Traffic Signing and Marking Material X
02 Protective Overlay Film and Edge Film 03/02/2005
05 Aluminum Panels 02/25/2008 X
08 FLH FP-03 Correction metric 03/27/2007
14 FLH FP-03 Correction metric uscu 03/02/2005
15 FLH FP-03 Corrections metric 03/27/2007
15 FLH FP-03 Correction metric 03/27/2007
725 - Miscellaneous Material X
02 Calcium Chloride, Calcium Chloride Flakes and Magnesium Chloride
03/02/2005
File details come from the government source that posted it. Updated .