FOR NE GENERAL MACC HOLDERS - Replace Roofs on Bldg 8 and 9, NSA Mechanicsburg

Award Notice Posted

Solicitation number
N4008513R3537
Agency
Awarded
to Watermark Environmental Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
N4008510D9448-0009 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Naval Support Activity, Mechanicsburg, Pa Bldgs 8 and 9 Mechanicburg, Pennsylvania 19111, United States

Notice details come from SAM.gov. Updated .

Notice text

THIS SOLICITATION IS FOR THE NE IPT GENERAL MACC HOLDERS ONLY (Contract #s  N40085-10-D-9448, 9449, 9450,9451,9452, 9453 and 9454)

This is a construction project to replace roofs on bldgs 8 and 9 at the Naval Support Activity, Mechanicsburg, PA    POC:  Tramaine Sims, 757-341-1976 and Betsy Carmack, 757-341-0081
 

PROPOSED TASK ORDER "DESIGN/BID/BUILD - REPLACE ROOFS - BLDG 8 and 9, MECHANICSBURG, PA
 


BLDG 8 -The work includes, but is not limited to, removal and disposal of the following existing materials on Building 8 where indicated or implied on the Drawings: gravel surfaced multiple-ply built-up roof systems and associated roof flashings; metal fascias and sheet metal assemblies; exterior ladder assembly; wood blocking; deteriorated gypsum decking; wall and overhang mounted lighting; steel canopy framing and supports at overhang; and removal of abandoned units and curbs where indicated.  NOTE: Demolition shall be performed on off-hours.  The work also includes, but is not limited to, the installation of the following materials on Building 8 where indicated or implied on the Drawings: cementitious wood fiberboard decking (to replace deteriorated


Replace Roof - Bldg. 8 Specification No. 10-5812 NSA, Mechanicsburg, PA gypsum decking); deck enclosures; base sheet; roof insulation; gypsum coverboard; wood blocking; perimeter parapet walls; fully adhered EPDM membrane and flashings; sheet metal assemblies; EIFS on perimeter walls; exterior access ladder and cage; perimeter safety railing; and new lighting fixtures and poles where indicated.


 


BLDG 9 - The work includes, but is not limited to, removal and disposal of the following existing materials on Building 9 where indicated or implied on the Drawings: gravel surfaced multiple-ply built-up and EPDM roof systems and associated roof flashings; metal fascias and sheet metal assemblies; exterior ladder assembly; wood blocking; deteriorated gypsum and wood decking; wall mounted lighting; and removal of abandoned units and curbs where indicated.  NOTE: Demolition shall be performed on off-hours. The work also includes, but is not limited to, the installation of the following materials on Building 9 where indicated or implied on the Drawings: wood and cementitious wood fiber decking (to replace deteriorated SECTION 01 11 00 Page 1 Replace Roof - Bldg. 9 Specification No. 10-5813 NSA, Mechanicsburg, PA decking); deck enclosures; base sheet; roof insulation; gypsum coverboard; wood blocking; perimeter parapet walls; fully adhered EPDM membrane and flashings; sheet metal assemblies; EIFS on perimeter walls and where indicated; exterior access ladder and cage; perimeter safety railing; and new wall mounted lighting fixtures and poles where indicated.


 


Files

File Type Posted
AMENDMENT_03.pdf PDF
AMENDMENT_02.pdf PDF
Bldg_8_Specs.pdf PDF
General_Requirements.pdf PDF
Amendment.pdf PDF
Bldg_8_Roof_Replacement_Dwgs.pdf PDF
Bldg_9_Specs.pdf PDF
Bldg_9_DWG.pdf PDF

On GovTribe