Fiber Cable Installation
Closed Solicitation Posted
- Solicitation number
- FA446024Q0246
- Agency
-
Air Mobility Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- PSC
- 7G21 It And Telecom - Network: Digital Network Products (Hardware And Perpetual License Software)
- Place of performance
- Little Rock AFB, Arkansas 72099, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This Solicitation notice is for the engineering, furnishing, installation, and testing (EFI&T) of a new 12-strand single mode fiber optic cable between Core Node 988 and Critical Access 1090 at Little Rock Air Force Base in Arkansas. The Department of the Air Force's Air Mobility Command is the contracting agency. The contractor must provide all required equipment, materials, labor, and services to complete the work in accordance with the Statement of Objectives. Offers will be evaluated using a Lowest Price Technically Acceptable (LPTA) process, with the lowest priced, technically acceptable offer selected for award. Questions are due by June 20, 2024, and quotes are due by 4:00 PM CDT on June 28, 2024.
This solicitation is set aside for 100% small business participation. The place of performance is Little Rock Air Force Base, AR 72099. The North American Industry Classification System (NAICS) code is 238210 - Electrical Contractors and Other Wiring Installation Contractors, and the Product and Service Code (PSC) is 7G21 - IT And Telecom - Network: Digital Network Products (Hardware And Perpetual License Software). The government has not identified any incumbent contractors for this requirement.
Notice text
2 versions
Update #2 · Latest ·
The Statement Of Objective (SOO) defines the requirement for the Contractor to engineer, furnish, install and test (EFI&T) a new 12-strand single mode(SM) fiber optic cable (FOC) between Core Node 988 and Critical Access 1090 at Little Rock AFB AR.
The contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in the Statement Of Objectives. The contractor shall comply with current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished.
52.212-1 Instructions to Offerors – Commercial Items Addendum
In order to be determined to be responsive, all quotes must be completed on the attached Price List, respond directly to the requirements of this solicitation, and sent to the identified POC’s. If your quote is determined to be non-responsive, it will not be further considered for award. A complete quote consists of the following:
a) Complete the price and extended price on the Price List based on the quantities provided.
b) Complete the bottom portion of page 3 of the Combined Synopsis/Solicitation document.
c)Review ENTIRE solicitation and fill in all required provisions and clauses. If the annual certification has been completed in the System for Award Management (SAM), FAR 52.212-3 does not need to be completed.
d) Responses shall include a Statement of Work based off of the attached Statement of Objectives. The Statement of Work shall outline the plan to complete the fiber installation, and address the requirements in the Statement of Objectives.
e) All vendors must have an active registration in SAM at time of quote submission.
52.212-2 Evaluation – Commercial Products and Commercial Services Addendum
Evaluation of offers will be completed following the instructions outlined in this addendum. The process of evaluation will be as follows: Lowest Price Technically Acceptable (LPTA).
All offers received will be ranked based on their overall price based on the quantities provided. Starting with the lowest price offer, evaluations will be conducted to validate compliance with h the Statement of Objectives. Once two (2) offers have been determined technically acceptable, evaluations will be concluded.
It is the intention of the Government to award one purchase order in response to this solicitation. The one (1) offer with the lowest price technically acceptable (LPTA) will be selected to receive the Service in response to this solicitation.
- All questions are due via email to all POC's listed on the solicitation NLT 4:00 PM (CDT) – 20 June 2024. Answers will subsequently be posted on SAM.gov.
2. Quotes in response to this solicitation must be submitted via email to the primary and secondary POC’s listed on SAM solicitation no later than 4:00 PM (CDT) Tuesday, 28 June 2024.
Update #1 ·
The Statement Of Objective (SOO) defines the requirement for the Contractor to engineer, furnish, install and test (EFI&T) a new 12-strand single mode(SM) fiber optic cable (FOC) between Core Node 988 and Critical Access 1090 at Little Rock AFB AR.
The contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in the Statement Of Objectives. The contractor shall comply with current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished.
52.212-1 Instructions to Offerors – Commercial Items Addendum
In order to be determined to be responsive, all quotes must be completed on the attached Price List, respond directly to the requirements of this solicitation, and sent to the identified POC’s. If your quote is determined to be non-responsive, it will not be further considered for award. A complete quote consists of the following:
a) Complete the price and extended price on the Price List based on the quantities provided.
b) Complete the bottom portion of page 3 of the Combined Synopsis/Solicitation document.
c)Review ENTIRE solicitation and fill in all required provisions and clauses. If the annual certification has been completed in the System for Award Management (SAM), FAR 52.212-3 does not need to be completed.
d) Responses shall include a Statement of Work based off of the attached Statement of Objectives. The Statement of Work shall outline the plan to complete the fiber installation, and address the requirements in the Statement of Objectives.
e) All vendors must have an active registration in SAM at time of quote submission.
52.212-2 Evaluation – Commercial Products and Commercial Services Addendum
Evaluation of offers will be completed following the instructions outlined in this addendum. The process of evaluation will be as follows: Lowest Price Technically Acceptable (LPTA).
All offers received will be ranked based on their overall price based on the quantities provided. Starting with the lowest price offer, evaluations will be conducted to validate compliance with h the Statement of Objectives. Once two (2) offers have been determined technically acceptable, evaluations will be concluded.
It is the intention of the Government to award one purchase order in response to this solicitation. The one (1) offer with the lowest price technically acceptable (LPTA) will be selected to receive the Service in response to this solicitation.
- All questions are due via email to all POC's listed on the solicitation NLT 4:00 PM (CDT) – 20 June 2024. Answers will subsequently be posted on SAM.gov.
2. Quotes in response to this solicitation must be submitted via email to the primary and secondary POC’s listed on SAM solicitation no later than 4:00 PM (CDT) Tuesday, 25 June 2024.
Files
| File | Type | Posted |
|---|---|---|
| Statement of Objectives.pdf | ||
| Combo FA446025Q0246 -Fiber.pdf | ||
| Answers - Fiber Cables.pdf | ||
| Wage Determinations.pdf | ||
| Combo FA446025Q0246 -Fiber.pdf | ||
| 52.212-1 & 2 Addendum.pdf | ||
| Statement of Objectives.pdf | ||
| Provisions and Clauses.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 56 CS FOC to Flightline and Wx Equipment, Luke AFB | Air Education and Training Command | Woman-Owned Small Business | |
| Cable, fiber optic | Naval Supply Systems Command | No set-aside | |
| Cable assembly, radio f | Aviation | Total Small Business | |
| Cable, fiber optic | Naval Supply Systems Command | No set-aside | |
| Cable assembly, radio f | Aviation | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity