Fermilab - Daycare Center Crawl Space Supports
Closed Solicitation Posted
- Solicitation number
- ISD-357300-RYK
- Agency
-
Fermi National Accelerator Laboratory
Office of Science, Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238120 Structural Steel and Precast Concrete Contractors
- Place of performance
- Batavia, Illinois 60510, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
Fermi Research Alliance, LLC (FRA), on behalf of the Department of Energy Fermi National Accelerator Laboratory, is seeking proposals for the removal and replacement of deteriorating crawl space jack posts, demolition of existing concrete footings, and installation of new footings at the Fermilab Daycare Center building. The subcontractor shall furnish all required supervision, labor, materials, tools, and equipment to complete the construction work in accordance with the drawings and technical specifications. The award will be made on a Lowest Price Technically Acceptable (LPTA) basis, with key evaluation criteria including the offeror's experience, past project experience, pricing, bid guarantee, and required safety documentation. Proposals are due by October 11, 2024 at 3:00 PM Central Time.
This is a small business set-aside contract under NAICS code 238120 - Structural Steel and Precast Concrete Contractors, with a size standard of $19 million. The work is subject to the Davis-Bacon Act, and certified payrolls must be submitted weekly using the LCPTracker system. If the offeror's price exceeds $25,000, a 20% bid guarantee and payment and performance bonds will be required. The place of performance is Batavia, Illinois.
Notice text
1.0 INTRODUCTION AND BACKGROUND
Fermilab is requesting a proposal for removal and replacement of crawl space jack posts, demolition of existing concrete footings, and installation of new footings at the Daycare Center building. The existing jack posts are in various stages of deterioration and require replacement. Additionally, the existing footings are undersized and new footings are required.
2.0 SCOPE
Provide all work as shown on :
Drawing set for ISD Project 10-2-153
Specification Sections:
o 010010 GENERAL REQUIREMENTS
o 013100 ENVIRONMENT, SAFETY, AND HEALTH REQUIREMENTS
o 013300 SUBMITTALS
o 014100 QUALITY REQUIREMENTS
The Subcontractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings and technical specifications. The Subcontractor’s scope of work is not limited to the general work outline described herein. The Subcontractor shall perform all work required to complete the construction work in accordance with the drawings and/or specifications. The description and quantities listed are general in nature and are only intended to describe the range and complexity of this scope of work. The description and quantities provided below are not to be used as the basis for establishing a cost proposal. Specific quantities and definitions of the scope of work for providing a proposal shall be based solely on estimates developed by the Offer from the drawings, specifications, and the information obtained from examining of the project site. Confined space training is required for work in the crawl spaces.
3.0 DELIVERABLES
The Subcontractor shall perform all work required to complete the construction work in accordance with the drawings and specifications.
4.0 QUALITY ASSURANCE
A Fermilab Construction Coordinator will be assigned to this project. See Specification Section 010010, GENERAL REQUIREMENTS. The Subcontractor is responsible for all activities necessary to manage, control, and document that work complies with the Subcontract documents. The Subcontractor’s responsibility includes ensuring adequate Quality Control services are provided for work accomplished on- and off-site by his/her organization,
Files
Show all 20
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB | Fermi National Accelerator Laboratory | No set-aside | |
| PIP-II f-37 building LWC pump room piping system installation | Fermi National Accelerator Laboratory | No set-aside | |
| Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade | Fermi National Accelerator Laboratory | Total Small Business | |
| RFP 7-B164-p-00002-00 (RR GC BPA FY27) | Office of Science | No set-aside | |
| Bar Grating and Saddle Clips | Fermi National Accelerator Laboratory | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity