Exhibit R 10-2-153_DRAWINGS_FOR_BID.pdf
PDF 11 MB Posted
- Attached to
- Fermilab - Daycare Center Crawl Space Supports
- Solicitation number
- ISD-357300-RYK
About this file
This document is a Request for Proposal (RFP) for the removal and replacement of crawl space jack posts, demolition of existing concrete footings, and installation of new footings at the Daycare Center building at Fermilab.
The scope of work includes all required supervision, labor, materials, tools, and equipment to perform the work as described in the drawings and technical specifications. The Subcontractor is responsible for all quality control activities to ensure the work complies with the Subcontract documents. A Fermilab Construction Coordinator will be assigned to the project. Confined space training is required for work in the crawl spaces. The Subcontractor shall provide all deliverables necessary to complete the construction work in accordance with the drawings and specifications.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
NORTH
PROJECTW
E
RAILYARD
STORAGE
AREA
ROAD
C
HWY. 56 BUTTERFIELD RD.
INDUSTRIAL
MAIN
TO
IN
TE
R
ST
AT
E I-8
FA
R N
SW
O
R
TH
KAUTZ RD.
CONSTRUCTION
ENTRANCE
INJECTOR
MAIN
SUBSTATION
KA
U
TZ
R
D
KAUTZ RD.
RING RD.
WILSON ST.
ENTRANCE
PINE ST.
ENTRANCE
(NO TRUCKS)
R O
AD
B
PINE ST. (OUT)
PINE ST. (IN)
KI
R
K R
D
ROAD
A
-2
ROAD
A -1
HOLTER RD
AREA
LABORATORY
CENTRAL
CDF
FE
LD
O
TT
R D
BATAVIA RD.
WILSON ST.
RECEIVINGSITE
BURLINGTON NORTHERN R.R.
TO ENTER THIS GATE
FA
RM
R D
LEGEND
SITE BOUNDARY LINES
ON SITE CONST. ROUTES
SW
ENSON
HOURS
(NO ACCESS)
EOLA RD.
ENTRANCE
TO RT. 59
HWY 38 ROOSEVELT RD.
BATAVIA RD.
EO
LA
R D
FIXED
TARGET
AREA
ROAD D
FERMILAB
VILLAGE
LOCKED
GATE
WILSON ST.
NOTE: APPROPRIATE I.D. IS REQUIRED
(LOAD LIMIT-6 TONS)
C O
M M
O N
W
EA
LT
H
E D
IS
O
N P
O W
ER
L
IN
ES
BATAVIA RD.
ENTRANCE
TO HWY 59
EL
G
IN
J
O
LI
ET
E
AS
TE
R
N R
.R
WILSON ST 6 AM TO 6
PM
PINE ST 6 AM TO 8
PM
BATAVIA RD 6 AM TO 8
PM
KAUTZ RD CLOSED
NOTE: APPROPRIATE
I.D. IS REQUIRED TO
ENTER THIS GATE
VICINITY PLAN
NOT TO SCALE
PROJECT AREA
AREA OF WORK
DAYCARE CENTER CRAWL SPACE SUPPORTSDAYCARE CENTER CRAWL SPACE SUPPORTS
Project No. 10-2-153Project No. 10-2-153
PROJECT AREA
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISION NO.FIMS. NO.
M :\A ct iv e Pr oj ec ts \1
0\ 2\
D ay ca re
C en te r C ra w l S pa ce S up po rts \3
Fi na l D es ig n\ D ra w in gs
\1 0-
2-
3_ D
AY
C
AR
E_
V2 4_
C R
EA
W
L
SP
AC
E
SU
PP
O R
TS
.rv t 4/
3/
0:
:5
AM
DAYCARE CENTER CRAWL
SPACE SUPPORTS
COVER SHEET G-1
10-2-153
Is su e D at e
P ro je ct S ta tu s
BL
TL
BL
BL 4/3/2024
4/3/2024
Sheet List
Sheet Number Sheet Name
G-1 COVER SHEET
G-2 GENERAL NOTES
S-1 EXISTING CONDITION PLAN
S-2 PHOTOS OF EXIST. CONDITIONS
S-3 PHOTOS OF EXIST. CONDITIONS
S-4 NEW PLAN
REVISIONS
REV. DESCRIPTION DATE
FOR BID 4/3/2024
4/3/2024
1.
2.
A.
3.
4.
5.
6.
7.
1.
A.
B.
1.
2.
3.
1.
A.
B.
2.
3.
4.
1.
2.
3.
4.
A.
B.
5.
6.
A.
1.
2.
3.
4.
GENERAL:
THE WORK CONSISTS OF REMOVAL AND REPLACEMENT OF CRAWL SPACE JACK-POSTS, DEMOLITION OF EXISTING CONCRETE FOOTINGS, AND INSTALLATION OF NEW UNREINFORCED CONCRETE FOOTINGS AS REQUIRED ON THE
DRAWINGS.
THE SUBCONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BEFORE STARTING WORK. IF CONDITIONS VARY FROM THOSE INDICATED ON THE DRAWINGS THE FERMILAB CONSTRUCTION COORDINATOR SHALL
BE NOTIFIED.
DIFFERENT HEIGHT JACK-POSTS MAY BE REQUIRED DEPENDING ON CRAWL SPACE HEIGHT CLEARANCES AND JACK-POST ADJUSTABILITY RANGES. SUBCONTRACTOR TO MEASURE HEIGHTS AND CONFIRM ADJUSTABILITY PRIOR
TO PURCHASING JACK-POSTS.
SCALE FOR THE DRAWINGS IS FOR GENERAL INFORMATION ONLY. LOCATIONS AND DIMENSIONS SHALL BE TAKEN AS SHOWN AND NOT SCALED.
THE SUBCONTRACTOR SHALL COORDINATE HIS WORK AND COOPERATE WITH OTHER SUBCONTRACTORS OR OTHER FERMILAB EMPLOYEES ON ADJACENT OR CONCURRENT WORK.
THE SUBCONTRACTOR SHALL COORDINATE HIS WORK WITH THE DAYCARE STAFF WHICH MAY REQUIRE PHASING OF WORK/AREAS.
THE SUBCONTRACT SHALL BE RESPONSIBLE FOR PROPER ALIGNMENT (VERTICAL AND HORIZONTAL) AT ALL INTERFACES BETWEEN NEW AND EXISTING.
ALL CONSTRUCTION MEANS AND METHODS AS WELL AS SAFETY ARE THE RESPONSIBILITY OF THE SUBCONTRACTOR.
SHORING:
INSTALL SHORING TO SUPPORT THE GROUND FLOOR. SHORING SHALL CONSIDER PROVIDING A LEVEL GRADE/DISTRIBUTION OF LOAD FOR SHORING SUPPORT. THE FOLLOWING MINIMUM GRAVITY LOADS SHALL BE USED FOR THE
DESIGN OF THE SHORING:
FLOOR LIVE LOADS: 40 PSF
FLOOR DEAD LOADS (SELF-WEIGHT OF FLOOR): 10 PSF
DEMOLITION:
SHORING SHALL BE IN PLACE PRIOR TO START OF DEMOLITION.
ALL DEMOLISHED MATERIALS SHALL BE DISPOSED OF OFF THE FERMILAB SITE BY THE SUBCONTRACTOR. PRIOR TO REMOVAL, THE SUBCONTRACTOR SHALL GIVE THE FERMILAB CONSTRUCTION COORDINATOR 24 HOURS NOTICE TO
CONDUCT A RADIATION SURVEY OF THE MATERIAL.
ALL SAWCUTTING OF CONCRETE OR DEMOLITION SHALL BE ACCOMPLISHED USING A “WET” METHOD TO MINIMIZE DUST. ALL CONCRETE SLURRY CREATED BY THE SAWCUTTING PROCESS SHALL BE IMMEDIATELY VACUUMED AND
DISPOSED OF IN ACCORDANCE WITH THE FERMILAB CONTRACT TERMS AND CONDITIONS.
SUBMIT A WRITTEN SILICA EXPOSURE CONTROL PLAN, REFER TO ES&H SPECIFICATIONS 013100.
CAST-IN-PLACE CONCRETE:
WORK SHALL CONFORM TO THE FOLLOWING SPECIFICATIONS PUBLISHED BY THE AMERICAN CONCRETE INSTITUTE.
ACI 301, “SPECIFICATIONS FOR STRUCTURAL CONCRETE”
ACI 117, “SPECIFICATIONS FOR TOLERANCES FOR CONCRETE CONSTRUCTION AND COMMENTARY”
MIXING AND PLACEMENT OF CONCRETE SHALL CONFORM TO THE LATEST ACI 304 GUIDE FOR MEASURING, MIXING AND PLACING CONCRETE, ACI 305R HOT WEATHER CONCRETING, AND ACI 306R COLD WEATHER CONCRETING.
CONCRETE DETAILS SHALL BE IN ACCORDANCE WITH THE ACI 315 DETAILING MANUAL.
CONCRETE: CONCRETE MIX DESIGN SHALL BE SUBMITTED PRIOR TO CONSTRUCTION. READY MIX OR BAGGED CONCRETE IS ACCEPTABLE.
MATERIALS:
CEMENT (U.N.O.): NORMAL PORTLAND CEMENT, ASTM C150, TYPE I OR III.
AGGREGATE: DURABLE, WELL-GRADED MINERALS CONFORMING TO ASTM C33.
WATER SHALL BE CLEAN, POTABLE AND FREE FROM DELETERIOUS MATERIALS.
ADMIXTURES: CERTIFIED BY MANUFACTURER TO BE COMPATIBLE WITH OTHER ADMIXTURES AND THAT WILL NOT CONTRIBUTE WATER-SOLUBLE CHLORIDE IONS EXCEEDING THOSE PERMITTED IN HARDENED CONCRETE. DO NOT USE CALCIUM CHLORIDE OR ADMIXTURES CONTAINING CALCIUM CHLORIDE. ADMIXTURES SHALL CONFORM TO THE FOLLOWING:
WATER REDUCING AND/OR RETARDING ADMIXTURE: ASTM C494.
PLASTICIZING AND RETARDING ADMIXTURE: ASTM C1017.
CONCRETE: NORMAL WEIGHT CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 4,000 PSI.
JACK-POSTS: STEEL JACK-POSTS SHALL BE ADJUSTABLE WITH GALVANIZED END PLATES. MINIMUM COMPRESSIVE CAPACITY OF 10,000 LBS.
SUBMIT JACK-POST PRODUCT PRIOR TO CONSTRUCTION.
INSTALLATION:
CURE CONCRETE IN ACCORDANCE WITH THE REQUIREMENTS OF ACI 308.1, “STANDARD SPECIFICATIONS FOR CURING CONCRETE.”
SET CONCRETE FOOTING ELEVATION HEIGHT AS NEEDED AND INSTALL JACK-POSTS TIGHT TO THE UNDERSIDE OF FLOOR BEAMS. WHERE APPLICABLE, IT IS PERMISSIBLE TO INSTALL NEW CONCRETE FOOTINGS OVER THE TOP OF
THE EXISTING IN LIEU OF REMOVING/DEMOLITION OF EXISTING.
NEW JACK-POSTS TO BE CENTERED ON CONCRETE FOOTINGS AND INSTALLED PER MANUFACTURER’S INSTRUCTIONS. DO NOT LIFT THE FLOOR BEAMS.
NEW CONCRETE FOOTINGS TO CURE MINIMUM 7 DAYS PRIOR TO LOADING UNLESS CONCRETE COMPRESSIVE STRENGTH TESTING IS PERFORMED, AND CONCRETE IS AT MINIMUM 75% OF DESIGN COMPRESSIVE STRENGTH.
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISION NO.FIMS. NO.
M :\A ct iv e Pr oj ec ts \1
0\ 2\
D ay ca re
C en te r C ra w l S pa ce S up po rts \3
Fi na l D es ig n\ D ra w in gs
\1 0-
2-
3_ D
AY
C
AR
E_
V2 4_
C R
EA
W
L
SP
AC
E
SU
PP
O R
TS
.rv t 4/
3/
0:
:5
AM
DAYCARE CENTER CRAWL
SPACE SUPPORTS
GENERAL NOTES G-2
10-2-153
Is su e D at e
P ro je ct S ta tu s
BL
TL
BL
BL 4/3/2024
4/3/2024
141REVISIONS
REV. DESCRIPTION DATE
FOR BID 4/3/2024
42' - 0" 8' - 0" 42' - 0"
38' - 0"
26' - 0"
7' - 3"
26' - 0"
7' - 3"
42' - 0
26' - 0"
26' - 0"
26' - 0"
41' - 0"
24' - 8"
24' - 8"
6' - 5"
7' - 0"
11' - 3"
ROTTED WOOD POST
ROTTED WOOD
POST
ABANDONED/FAILED
ABANDONED/FAILED
ABANDONED/FAILED
ABANDONED/FAILED8' - 4" 8' - 0" 8' - 0" 8' - 0"
CONC. PIERS, TYP.
OPENING
8' - 0" 8' - 0" 8' - 0"8' - 4"
REPLACED
NEW 9/15/23
8' - 4
8' - 0
8' - 0
8' - 0
8' - 4
REPLACED
9/15/23
HATCH ACCESS
9' - 3"
6' - 0"
6' - 0"
8' - 8"
9' - 9"
COMBINATION OF OLD AND
"NEWER" STEEL JACK POSTS
ON 4'X4' CONC. FOUNDATION,
TYP.
(3) 2X8 GIRDER POCKETED INTO WALL @ BOTH ENDS
2X8 @ 12" O.C. JOISTS
JACK POSTS ON CONC. FOOTING, TYP.
9 NEW POSTS INSTALLED
9/8/23 ALONG
FOUNDATION WALL
2X8 @ 16" O.C.
JOISTS
(3)2X8
2X8 @12" O.C.
(3)2X8
JACK POSTS ON STEEL
PLATES AND CONC.
FOOTING
CONC. PIERS, TYP.
2X8 @ 12" O.C.
(2)2X10 2X10 @ 12" O.C.
JACK POSTS ON CONC. 18X18 PANELS, TYP.
WOOD POST
WOOD POST
3' - 0" 5' - 2" 4' - 5"
7' - 4" 7' - 7"
6' - 2" 7' - 8"
5' - 4"
2X10 @ 12" O.C.
(5)2X8
11' - 0"
ABANDONED
ABANDONED
ABANDONED
ABANDONED
5 1/2"X7 1/2" GIRDER
JACK POST ON STEEL PLATE
GIRDER
POCKETED INTO
WALL
WOOD POST
(3) 2X8 GIRDER
POCKETED INTO
WALL @ BOTH ENDS
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISION NO.FIMS. NO.
M :\A ct iv e Pr oj ec ts \1
0\ 2\
D ay ca re
C en te r C ra w l S pa ce S up po rts \3
Fi na l D es ig n\ D ra w in gs
\1 0-
2-
3_ D
AY
C
AR
E_
V2 4_
C R
EA
W
L
SP
AC
E
SU
PP
O R
TS
.rv t 4/
3/
0:
:5
AM
DAYCARE CENTER CRAWL
SPACE SUPPORTS
EXISTING CONDITION PLAN S-1
10-2-153
Is su e D at e
P ro je ct S ta tu s
BL
TL
BL
BL 4/3/2024
4/3/2024
1/8" = 1'-0"S-1
1 EXISTING FOUNDATION PLAN
REVISIONS
REV. DESCRIPTION DATE
PROJECT
NORTH
ES
W
FOR BID 4/3/2024
3A
3B4A
4B
5A
5B
AD-22
AD-2
AD-2
AD-2
AD-2
AD-2
AD-2
AD-2
AD-3
AD-3
AD-3
AD-3
AD-3
AD-3
AD-3
AD-3
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISION NO.FIMS. NO.
M :\A ct iv e Pr oj ec ts \1
0\ 2\
D ay ca re
C en te r C ra w l S pa ce S up po rts \3
Fi na l D es ig n\ D ra w in gs
\1 0-
2-
3_ D
AY
C
AR
E_
V2 4_
C R
EA
W
L
SP
AC
E
SU
PP
O R
TS
.rv t 4/
3/
0:
:5
AM
DAYCARE CENTER CRAWL
SPACE SUPPORTS
PHOTOS OF EXIST. CONDITIONS S-2
10-2-153
Is su e D at e
P ro je ct S ta tu s
BL
TL
BL
BL 4/3/2024
4/3/2024
PHOTOGRAPH - EXISTING CONDITIONS
AREA 1
AD-2
PHOTOGRAPH - EXISTING CONDITIONS
AREA 1
AD-2
PHOTOGRAPH - EXISTING CONDITIONS
AREA 2
AD-2
PHOTOGRAPH - EXISTING CONDITIONS
AREA 2
AD-2
PHOTOGRAPH - EXISTING CONDITIONS
AREA 2
AD-2
PHOTOGRAPH - EXISTING CONDITIONS
AREA 3
AD-2
PHOTOGRAPH - EXISTING CONDITIONS
AREA 3
AD-2
PHOTOGRAPH - EXISTING CONDITIONS
AREA 3
AD-2
PHOTO KEY PLAN
REVISIONS
REV. DESCRIPTION DATE
PROJECT
NORTH
ES
W
FOR BID 4/3/2024
3A
3B4A
4B
5A
5B
AD-22
AD-2
AD-2
AD-2
AD-2
AD-2
AD-2
AD-2
AD-3
AD-3
AD-3
AD-3
AD-3
AD-3
AD-3
AD-3
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISION NO.FIMS. NO.
M :\A ct iv e Pr oj ec ts \1
0\ 2\
D ay ca re
C en te r C ra w l S pa ce S up po rts \3
Fi na l D es ig n\ D ra w in gs
\1 0-
2-
3_ D
AY
C
AR
E_
V2 4_
C R
EA
W
L
SP
AC
E
SU
PP
O R
TS
.rv t 4/
3/
0:
:5
AM
DAYCARE CENTER CRAWL
SPACE SUPPORTS
PHOTOS OF EXIST. CONDITIONS S-3
10-2-153
Is su e D at e
P ro je ct S ta tu s
BL
TL
BL
BL 4/3/2024
4/3/2024
PHOTOGRAPH - EXISTING CONDITIONS
AREA 4
AD-2
PHOTOGRAPH - EXISTING CONDITIONS
AREA 4
AD-2
PHOTOGRAPH - EXISTING CONDITIONS
AREA 5
AD-2
PHOTOGRAPH - EXISTING CONDITIONS
AREA 5
AD-2
PHOTOGRAPH - EXISTING CONDITIONS
AREA 5
AD-2
PHOTOGRAPH - EXISTING CONDITIONS
AREA 6
AD-2
PHOTOGRAPH - EXISTING CONDITIONS
AREA 6
AD-2
PHOTOGRAPH - EXISTING CONDITIONS
AREA 4
AD-2
REVISIONS
REV. DESCRIPTION DATE
PROJECT
NORTH
ES
W
FOR BID 4/3/2024
3A
3B4A
4B
5A
5B
EXISTING FOOTINGS TO REMAIN
4 NEW POSTS,
MATCH EXISTING
SPACING.
6 NEW POSTS AND 4
FOOTINGS. MATCH
EXISTING SPACING.
END POSTS TO BEAR
ON WALL FOOTING
END POST TO BEAR
ON WALL FOOTING
2 NEW POSTS
NEW FOOTING
9 POSTS TO REMAIN
4 NEW POSTS AND
FOOTINGS SPACED
AT MAX 8" O.C.
NEW FOOTING,
REUSE EXISTING
POST
3 NEW POSTS AND
4 FOOTINGS
SPACED AT MAX 8'
O.C.
2 NEW POSTS,
MATCH EXISTING
LOCATIONS
2 NEW POSTS,
MATCH EXISTING
LOCATIONS
4 NEW POSTS
4 NEW POSTS AND
4 FOOTINGS
SPACED AT MAX 8'
O.C.
COORDINATE
LOCATION WITH
EXISTING
DUCTWORK
10 NEW POSTS AND
FOOTINGS SPACED AT MAX
8'-6" O.C.
NEW FOOTING,
REUSE EXISTING
POST
9 NEW POSTS AND 7
FOOTINGS SPACED AT
MAX 7'-6" O.C.
REPLACE WOOD POSTS AT EACH END
WITH NEW STEEL POSTS. END POSTS TO
BEAR ON WALL FOOTING.
NEW FOOTING, REUSE
EXISTING POST
4 NEW POSTS AND 5
FOOTINGS SPACED AT
MAX 8' O.C.
4 NEW POSTS
6 NEW POSTS AND
FOOTINGS SPACED AT
MAX 8' O.C.
4 NEW POSTS AND
FOOTINGS SPACED AT
MAX 8' O.C.
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISION NO.FIMS. NO.
M :\A ct iv e Pr oj ec ts \1
0\ 2\
D ay ca re
C en te r C ra w l S pa ce S up po rts \3
Fi na l D es ig n\ D ra w in gs
\1 0-
2-
3_ D
AY
C
AR
E_
V2 4_
C R
EA
W
L
SP
AC
E
SU
PP
O R
TS
.rv t 4/
3/
0:
:5
AM
DAYCARE CENTER CRAWL
SPACE SUPPORTS
NEW PLAN S-4
10-2-153
Is su e D at e
P ro je ct S ta tu s
BL
TL
BL
BL 4/3/2024
4/3/2024
1/8" = 1'-0"S-4
1 NEW FOUNDATION PLAN
Post and Footing Schedule
Area # Number of Posts to be Replaced
Number of Footings to be Replaced Footing Size
1 10 10 24"x24" by 10" thick 2 9 7 20"x20" by 8" thick
3A 14 10 20"x20" by 8" thick 3B 4 5 20"x20" by 8" thick 4A 12 4 20"x20" by 10" thick 4B 3 4 20"x20" by 10" thick 5A 6 5 20"x20" by 10" thick 5B 0 0 6 10 4 20"x20" by 8" thick
NOTES:
1. SEE GENERAL NOTES FOR SHORING REQUIREMENTS.
2. TOP OF NEW FOOTINGS TO BE A MINIMUM 2" ABOVE SURROUNDING GRADE
3. LOCATE NEW STEEL POSTS TO MATCH EXISTING LOCATIONS AND UNDER GIRDER SPLICE POINTS AS APPLICABLE. NOTIFY FERMILAB IF SPACING EXCEEDS MAXIMUM SHOWN ON DRAWINGS.
REVISIONS
REV. DESCRIPTION DATE
PROJECT
NORTH
ES
W
FOR BID 4/3/2024
| G-1 - COVER SHEET |
| G-2 - GENERAL NOTES |
| S-1 - EXISTING CONDITION PLAN |
| S-2 - PHOTOS OF EXIST. CONDITIONS |
| S-3 - PHOTOS OF EXIST. CONDITIONS |
| S-4 - NEW PLAN |
File details come from the government source that posted it. Updated .