FCC Yazoo City - Hot Water Pumps Replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 26Z3AP2
- Agency
- Federal Correctional Complex Yazoo City Correctional Facilities, Department of Justice
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 333414 Heating Equipment (except Warm Air Furnaces) Manufacturing
- PSC
- 4520 Space And Water Heating Equipment
- Place of performance
- Yazoo City, Mississippi 39194, United States
- Points of contact
-
- Carlos Tate c3tate@bop.gov (662) 716-1020
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Bureau of Prisons at Federal Correctional Complex Yazoo City seeks replacement of two existing hot water pumps at the facility's Low I Powerhouse, with proposals due June 22, 2026. No set-aside is used.
Place of performance is Yazoo City, Mississippi. The contractor must remove existing pumps and install two new base-mounted, double-suction split-case centrifugal pumps (Bell & Gossett e-HSC Model 4x6x12 or approved equivalent), each driven by a 50 HP motor meeting NEMA premium efficiency standards. Design specifications require 700 GPM flow at 152 feet total dynamic head operating at 1,780 RPM, minimum hydraulic efficiency of 82%, minimum shutoff head of 170 feet, and maximum NPSHr of 11.1 feet. The contractor must provide all labor, materials, rigging, and equipment for legal disposal of existing pumps and installation of new isolation valves, suction diffusers, check valves, pressure gauges, and expansion joints with control rods. Work includes field verification of piping and clearances, final laser alignment and lubrication after grouting, system startup and commissioning via factory-authorized representative, system balancing, cleaning, vibration testing, and delivery of O&M manuals, warranty documentation, and laser alignment reports. The contractor must demonstrate a minimum of seven years' documented experience with similar systems and comply with all Federal Bureau of Prisons security procedures, requiring staff escort at all times on the facility. Performance is scheduled at 40 hours per week Monday through Friday, 7:30 A.M. to 3:30 P.M., not to exceed 250 calendar days from notice to proceed. NAICS code is 333414; PSC code is 4520.
Notice text
The primary objective of this project is to replace two (2) existing hot water pumps at the Federal Correctional Complex (FCC) Yazoo City, Low I Powerhouse, located in Yazoo City, Mississippi (26Z3AP2 YA... p. 1). The contractor will provide all labor, materials, and equipment required to legally dispose of the old pumps and install new base-mounted, double-suction split-case centrifugal pumps (26Z3AP2 YA... pp. 1-2).
Key Equipment Specifications
- Pump Model: Bell & Gossett e-HSC Model 4x6x12 or approved equivalent (26Z3AP2 YA... p. 2).
- Performance Targets: Design flow of 700 GPM at 152 feet of total dynamic head, operating at 1780 RPM (26Z3AP2 YA... p. 2).
- Efficiency Standards: Minimum hydraulic efficiency of 82% with a design BHP of 33 (26Z3AP2 YA... p. 2).
- Motor Requirements: Driven by a 50 HP motor adhering to NEMA premium efficiency standards (26Z3AP2 YA... p. 2).
- Additional Metrics: Minimum shutoff head of 170 feet and a maximum Net Positive Suction Head required (NPSHr) of 11.1 feet at the design point (26Z3AP2 YA... p. 2).
Contractor Duties & Milestones
- Pre-Installation: Field-verify all piping sizes, elevations, and equipment clearances before procuring materials (26Z3AP2 YA... p. 2).
- Installation: Legally dispose of existing pumps, isolation valves, and expansion joints (26Z3AP2 YA... p. 2). Install new full-port isolation valves, suction diffusers, check valves, pressure gauges, and expansion joints with control rods (26Z3AP2 YA... p. 2).
- Alignment & Protection: Run final laser alignment and lubrication after grouting while ensuring modifications prevent any mechanical strain on pump nozzles (26Z3AP2 YA... p. 2).
- Commissioning: Manage system startup, balancing, cleaning, and vibration testing using a factory-authorized representative (26Z3AP2 YA... p. 2). Provide the COR with 48 hours' notice prior to system shutdowns (26Z3AP2 YA... p. 2).
- Handover: Deliver O&M manuals, laser alignment reports, warranty documentation, and manufacturer-specified hours of owner training (26Z3AP2 YA... p. 3).
- Experience: Must demonstrate a minimum of seven (7) years of documented experience with systems of similar complexity meeting Hydraulic Institute (HI) and NEMA standards (26Z3AP2 YA... p. 3).
Timeline & Security Constraints
Attached is the SOW. Site visit will be held 6/16/26 at 10 AM CST. Please contact B. Wiles @ bhwiles@bop.gov if interested no later than 6/12/26 12 Noon CST.
- Work Schedule: Monday through Friday, 7:30 AM to 3:30 PM, excluding federal holidays (26Z3AP2 YA... p. 1). Schedule changes require 48-hour advance approval from the COR (26Z3AP2 YA... p. 1).
- Project Duration: Total project timeline must not exceed 250 calendar days from the issuance of the notice to proceed (26Z3AP2 YA... p. 1).
- Security & Inmate Interaction: Workers will be escorted by Bureau of Prisons staff at all times and are restricted from unsupervised contact or interaction with inmates (26Z3AP2 YA... pp. 2-3).
Attachments
| File | Type | Posted |
|---|---|---|
| 26Z3AP2 YAZ SOW Hot Water Pumps.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| FCC Yazoo City - Hot Water Pumps Replacement | Award Notice | |
| FCC Yazoo City - Hot Water Pumps Replacement | Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities