About this opportunity

The Department of the Air Force Reserve Command seeks to procure the furnishing, installation, and testing of two 12-strand Single Mode Fiber Optic Cables from Information Transfer Building (ITB) 700 to Hangar 5 and Building 404 at Dobbins Air Reserve Base in Georgia. This telecommunications infrastructure project requires contractors to provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to complete the fiber optic cable installation. All equipment and materials must be new rather than refurbished, and the contractor must comply with current TIA telecommunication installation and testing commercial standards as well as base installation standards. The solicitation was posted on May 20, 2025, with a proposal submission deadline of July 8, 2025. Technical specifications include blown fiber installation requirements, underground conduit systems with specific depth requirements (36 inches beneath roads and parking areas with 12 inches of clean fill cover), crushed stone drainage in handholes, PVC spacers for conduit support, and concrete encasement for conductors under streets or parking lots.

This opportunity is designated as a 100% set-aside for Small Business in accordance with FAR 19.502-2, classified under NAICS code 237130 for Power and Communication Line and Related Structures Construction. The work will be performed at Dobbins Air Reserve Base located on Industrial Drive in Marietta, Georgia. The project involves installing two separate fiber optic cable runs connecting the Information Transfer Building to two distinct locations on the base, requiring underground conduit installation and compliance with base civil engineering specifications including underground marker tape requirements and manhole stabilization with crushed stone. The solicitation includes restricted attachments available through SAM.GOV by request, and an amendment dated June 25, 2025, provided answers to questions received during the solicitation period. No incumbent contractors or specific award values were identified in the available documentation.

Notice text

5 versions

Update #5 · Latest ·

Diversity Fiber Connecting ITB 700 to Hangar 5 / Bldg. 404 Dobbins Air Reserve Base has a requirement to Furnish, Install and Test (EFI and T) two 12-strand Single Mode (SM) Fiber Optic Cables (FOC) from Information Transfer Building (ITB) 700 to Hangar 5 and Bldg 404 at Dobbins ARB, GA. This requirement is 100 % set-aside for Small Business. Set-aside is in accordance with FAR 19.502-2.Work consists of but is not limited to provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet this requirement. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished.Attachment 1 SOO is Restricted and will be available at SAM.GOV by request. To be granted access to this Solicitation, Offeror must have completed the National Institute of Standards and Technology (NIST) assessment and uploaded it to Supplier Performance Risk System (SPRS). Your entity NIST assessments must be documented in SPRS an must be current (date of assessment must not be older than 3 years). See the Defense Federal Acquisition Regulation System (DFARS), section 252.204-7019 and 252.204-7020. Posted Attach 11 Questions and Answers 26 Jun 2025. Admendment 3 made 7 July 2025 with minor changes to Attachment 5 Sec L pg 2 with the changes as follows.From : Each proposal shall include two (2) volumes containing all of the required information in Table Proposal Organization and Content and Page Limitations.The electronic copy shall not belinked to any other document. Any proposal with sound/video files embedded will not be evaluated.To: Each proposal shall include two (2) volumes containing all of the required information Content and Page Limitations as applicable. The electronic copy shall notbe linked to any other document. Any proposal with sound/video files embedded will not be evaluated

Update #4 ·

Diversity Fiber Connecting ITB 700 to Hangar 5 / Bldg. 404 Dobbins Air Reserve Base has a requirement to Furnish, Install and Test (EFI and T) two 12-strand Single Mode (SM) Fiber Optic Cables (FOC) from Information Transfer Building (ITB) 700 to Hangar 5 and Bldg 404 at Dobbins ARB, GA. This requirement is 100 % set-aside for Small Business. Set-aside is in accordance with FAR 19.502-2.Work consists of but is not limited to provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet this requirement. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished.Attachment 1 SOO is Restricted and will be available at SAM.GOV by request. To be granted access to this Solicitation, Offeror must have completed the National Institute of Standards and Technology (NIST) assessment and uploaded it to Supplier Performance Risk System (SPRS). Your entity NIST assessments must be documented in SPRS an must be current (date of assessment must not be older than 3 years). See the Defense Federal Acquisition Regulation System (DFARS), section 252.204-7019 and 252.204-7020

Update #3 ·

Diversity Fiber Connecting ITB 700 to Hangar 5 / Bldg. 404 Dobbins Air Reserve Base has a requirement to Furnish, Install and Test (EFI and T) two 12-strand Single Mode (SM) Fiber Optic Cables (FOC) from Information Transfer Building (ITB) 700 to Hangar 5 and Bldg 404 at Dobbins ARB, GA. This requirement is 100 % set-aside for Small Business. Set-aside is in accordance with FAR 19.502-2.Work consists of but is not limited to provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet this requirement. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished.Attachment 1 SOO is Restricted and will be available at SAM.GOV by request. To be granted access to this Solicitation, Offeror must have completed the National Institute of Standards and Technology (NIST) assessment and uploaded it to Supplier Performance Risk System (SPRS). Your entity NIST assessments must be documented in SPRS an must be current (date of assessment must not be older than 3 years). See the Defense Federal Acquisition Regulation System (DFARS), section 252.204-7019 and 252.204-7020

Update #2 ·

Diversity Fiber Connecting ITB 700 to Hangar 5 / Bldg. 404 Dobbins Air Reserve Base has a requirement to Furnish, Install and Test (EFI and T) two 12-strand Single Mode (SM) Fiber Optic Cables (FOC) from Information Transfer Building (ITB) 700 to Hangar 5 and Bldg 404 at Dobbins ARB, GA. This requirement is 100 % set-aside for Small Business. Set-aside is in accordance with FAR 19.502-2.Work consists of but is not limited to provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet this requirement. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished.Attachment 1 SOO is Restricted and will be available at SAM.GOV by request.

Update #1 ·

Diversity Fiber Connecting ITB 700 to Hangar 5 / Bldg. 404 Dobbins Air Reserve Base has a requirement to Furnish, Install and Test (EFI and T) two 12-strand Single Mode (SM) Fiber Optic Cables (FOC) from Information Transfer Building (ITB) 700 to Hangar 5 and Bldg 404 at Dobbins ARB, GA. This requirement is 100 % set-aside for Small Business. Set-aside is in accordance with FAR 19.502-2.Work consists of but is not limited to provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet this requirement. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished.Attachment 1 SOO is Restricted and will be available at SAM.GOV by request.

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Install Diversity Fiber Connecting ITB 700 to Hangar 5 & Bldg. 404 Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Robins RAPID Construction OTA Progressive Design Build Fiber Replacement Warner Robins, Georgia 31098, United States · NAICS 236220 Air Force Sustainment Center No set-aside
Womble Work Center Fiber Optic Installation Mount Ida, Arkansas 71957, United States · NAICS 238210 Region 8 - Southern Region Total Small Business
Fiber, trans, 4 NAICS 333998 Land and Maritime No set-aside
Folsom Dam Electronic Access Control and Surveillance (EACSS) Fiber Backbone Up NAICS 237130 — Service-Disabled Veteran-Owned Small Business
Plant 42 Commercial Internet Services Edwards, California 93524, United States · NAICS 517111 Air Force Test Center No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors