F-35A Munitions and Maintenance Complex

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W91238-17-R-0078
Agency
ENDIST Sacramento US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
W9123818C0049 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Hill AFB, UT Hill AFB, Utah 84056, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Added: Mar 06, 2018 12:59 pm Extend response date to 3/21/2018.

Update #3 ·

Added: Aug 09, 2017 1:56 pm Modified: Feb 16, 2018 3:32 pmTrack Changes

The Sacramento District of the U.S. Army Corps of Engineers has a new construction requirement for the 2-Phase Design-Build F-35A Munitions Maintenance Complex at Hill AFB, UT.


The project consists of a single story, multi-bay F-35A munitions maintenance complex and an addition to Building 988, as well as renovation and modernization to Building 988. All new construction will be composed of reinforced concrete footings, foundation, and elevated floor slab to accommodate a reinforced concrete loading dock at the work bays; including insulated standing seam metal roofs. Facility will be designed as a permanent construction in accordance with UFC 1-200-01. It includes an administrative support core with standard metal stud partition walls to form private offices, men's and women's restrooms, tool room, general storage, mechanical room, electrical room, communications room, vault, and break room. The addition to Building 988 will include a storage and munitions maintenance bay with insulated steel frame walls and self-supporting 5-ton ridge crane. Each work bay to be equipped with 60 Hz/single phase and 400 Hz/3 phase power, and explosion proof lighting. The facilities include overall catenary lightning protection, surge protection, intrusion detection, fire detection and suppression, grounding, and exterior lighting as required. Project includes all supporting utilities, site improvements, communication infrastructure, and pavements; including a reinforced concrete approach apron in front of a raised loading dock. The project will comply with DOD antiterrorism protection requirements per UFC 4-010-01.


This acquisition is proceeding as as 8(a) Competitive Set-Aside resticted to Utah and Coloarado SBA districts.


Estimated Period of Performance for construction is 670 days after Notice to Proceed.


In accordance with DFARS 236.204(i), the estimated value of the resulting contract is expected to be between $10 Million - $25 Million.


This procurement will be conducted under PSC Z2EA, SIC 1541, and NAICS 236220.


The size standard for this code is 36.5M. All questions should be directed to the Contract Specialist, Ms. Deanna C. Zemovich, Deanna.C.Zemovich@usace.army.mil and the Contracting Officer, Mr. Daniel Czech at Daniel.E.Czech@usace.army.mil.


It is anticipated that the RFP will be issued on or about 9 February 2018, for downloading at the Government's website at http://www.fedbizopps.gov/. No paper copies will be issued.


The specific due date and time for receipt of proposals will be 12 March 2018, 10:00 am.


OFFERORS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.


Plans and specifications will NOT be provided in hard paper copy or CD-ROM format. The solicitation and all amendments for this acquisition will be posted on a secure Government website known as FedBizOpps (www.fbo.gov) once the RFP is issued. Viewing/downloading documents from FedBizOpps will require prior registration in the System for Award Management (SAM) at www.SAM.gov. If you are a first-time FedBizOpps user, you will also be required to register in FedBizOpps (www.fbo.gov) before accessing the RFP documents. To register, click on the Register Now button in the Vendors Block and follow the instructions. Once registered with FedBizOpps, interested parties will then be able to log in and access the RFP documents.


For further information, please click on the FedBizOpps homepage link and the Vendor User Guide. The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the ‘ADD ME TO INTERESTED VENDORS' to enter your information. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO THE SOLICITATION.

Update #2 ·

Added: Aug 09, 2017 1:56 pm Modified: Feb 09, 2018 2:53 pmTrack Changes

The Sacramento District of the U.S. Army Corps of Engineers has a new construction requirement for the 2-Phase Design-Build F-35A Munitions Maintenance Complex at Hill AFB, UT.


The project consists of a single story, multi-bay F-35A munitions maintenance complex and an addition to Building 988, as well as renovation and modernization to Building 988. All new construction will be composed of reinforced concrete footings, foundation, and elevated floor slab to accommodate a reinforced concrete loading dock at the work bays; including insulated standing seam metal roofs. Facility will be designed as a permanent construction in accordance with UFC 1-200-01. It includes an administrative support core with standard metal stud partition walls to form private offices, men's and women's restrooms, tool room, general storage, mechanical room, electrical room, communications room, vault, and break room. The addition to Building 988 will include a storage and munitions maintenance bay with insulated steel frame walls and self-supporting 5-ton ridge crane. Each work bay to be equipped with 60 Hz/single phase and 400 Hz/3 phase power, and explosion proof lighting. The facilities include overall catenary lightning protection, surge protection, intrusion detection, fire detection and suppression, grounding, and exterior lighting as required. Project includes all supporting utilities, site improvements, communication infrastructure, and pavements; including a reinforced concrete approach apron in front of a raised loading dock. The project will comply with DOD antiterrorism protection requirements per UFC 4-010-01.


This acquisition is proceeding as as 8(a) Competitive Set-Aside resticted to Utah and Coloarado SBA districts.


Estimated Period of Performance for construction is 670 days after Notice to Proceed.


In accordance with FAR 36.204(g), the estimated value of the resulting contract is expected to be $5 Million - $10 Million.


This procurement will be conducted under PSC Z2EA, SIC 1541, and NAICS 236220.


The size standard for this code is 36.5M. All questions should be directed to the Contract Specialist, Ms. Deanna C. Zemovich, Deanna.C.Zemovich@usace.army.mil and the Contracting Officer, Mr. Daniel Czech at Daniel.E.Czech@usace.army.mil.


It is anticipated that the RFP will be issued on or about 9 February 2018, for downloading at the Government's website at http://www.fedbizopps.gov/. No paper copies will be issued.


The specific due date and time for receipt of proposals will be 12 March 2018, 10:00 am.


OFFERORS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.


Plans and specifications will NOT be provided in hard paper copy or CD-ROM format. The solicitation and all amendments for this acquisition will be posted on a secure Government website known as FedBizOpps (www.fbo.gov) once the RFP is issued. Viewing/downloading documents from FedBizOpps will require prior registration in the System for Award Management (SAM) at www.SAM.gov. If you are a first-time FedBizOpps user, you will also be required to register in FedBizOpps (www.fbo.gov) before accessing the RFP documents. To register, click on the Register Now button in the Vendors Block and follow the instructions. Once registered with FedBizOpps, interested parties will then be able to log in and access the RFP documents.


For further information, please click on the FedBizOpps homepage link and the Vendor User Guide. The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the ‘ADD ME TO INTERESTED VENDORS' to enter your information. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO THE SOLICITATION.

Update #1 ·

Added: Aug 09, 2017 1:56 pm The Sacramento District of the U.S. Army Corps of Engineers has a new construction requirement for the 2-Phase Design-Build F-35A Munitions Maintenance Complex at Hill AFB, UT.


The project consists of a single story, multi-bay F-35A munitions maintenance complex and an addition to Building 988, as well as renovation and modernization to Building 988. All new construction will be composed of reinforced concrete footings, foundation, and elevated floor slab to accommodate a reinforced concrete loading dock at the work bays; including insulated standing seam metal roofs. Facility will be designed as a permanent construction in accordance with UFC 1-200-01. It includes an administrative support core with standard metal stud partition walls to form private offices, men's and women's restrooms, tool room, general storage, mechanical room, electrical room, communications room, vault, and break room. The addition to Building 988 will include a storage and munitions maintenance bay with insulated steel frame walls and self-supporting 5-ton ridge crane. Each work bay to be equipped with 60 Hz/single phase and 400 Hz/3 phase power, and explosion proof lighting. The facilities include overall catenary lightning protection, surge protection, intrusion detection, fire detection and suppression, grounding, and exterior lighting as required. Project includes all supporting utilities, site improvements, communication infrastructure, and pavements; including a reinforced concrete approach apron in front of a raised loading dock. The project will comply with DOD antiterrorism protection requirements per UFC 4-010-01.

This acquisition is proceeding as as 8(a) Competitive Set-Aside resticted to Utah and Coloarado SBA districts.

Estimated Period of Performance for construction is 580 days after Notice to Proceed.

In accordance with FAR 36.204(g), the estimated value of the resulting contract is expected to be $5 Million - $10 Million.

This procurement will be conducted under FSC Z2EA, SIC 1541, and NAICS 236220.

The size standard for this code is 36.5M. All questions should be directed to the Contract Specialist, Mr. La Vaughn Williams, LaVaughn.T.Williams@usace.army.mil  and the Contracting Officer, Mr. Daniel Czech at Daniel.E.Czech@usace.army.mil.


It is anticipated that the RFP will be issued on or about 25 August 2017, for downloading at the Government's website at http://www.fedbizopps.gov/. No paper copies will be issued.


The specific due date and time for receipt of proposals will be identified in the solicitation.


OFFERORS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.


Plans and specifications will NOT be provided in hard paper copy or CD-ROM format. The solicitation and all amendments for this acquisition will be posted on a secure Government website known as FedBizOpps (www.fbo.gov) once the RFP is issued. Viewing/downloading documents from FedBizOpps will require prior registration in the System for Award Management (SAM) at www.SAM.gov. If you are a first-time FedBizOpps user, you will also be required to register in FedBizOpps (www.fbo.gov) before accessing the RFP documents. To register, click on the Register Now button in the Vendors Block and follow the instructions. Once registered with FedBizOpps, interested parties will then be able to log in and access the RFP documents.


For further information, please click on the FedBizOpps homepage link and the Vendor User Guide. The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the ‘ADD ME TO INTERESTED VENDORS' to enter your information. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO THE SOLICITATION.


 


 

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
F35A Munitions Maintenance Complex Award Award Notice
F-35A Munitions and Maintenance Complex This notice · Latest pre-solicitation Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity