CANCELLATION NOTICE: EOU Sunshades Creech AFB

Closed Solicitation Posted

Not the latest version. See the latest pre-solicitation from .

Solicitation number
F4FANG6133A001
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Indian Springs, Nevada 89018, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation has been cancelled. The Department of the Air Force Air Combat Command cancelled solicitation F4FANG6133A001 for EOU Sunshades at Creech AFB, determining that the requirement is no longer needed because the requiring activity identified existing Government space. No award will be made.

Prior to cancellation, the procurement was a Total Small Business Set Aside for design, fabrication, and installation of four new aircraft sunshade structures (80 feet long by 115 feet wide by 28 feet height) at Creech Air Force Base, Indian Springs, Nevada, with relocation of four existing structures and demolition of a fifth sunshade. Place of performance was Creech AFB, Nevada. The NAICS code is 332312 (Fabricated Structural Metal Manufacturing); PSC is 5450 (Miscellaneous Prefabricated Structures).

The requirement was 100% design-build. Contractor responsibilities included all engineering, stamped structural calculations sealed by a licensed engineer, FAA Form 7460-1 submission, concrete core sampling, underground utility location via AF Form 103 (Dig Permit), field surveying, and post-award dimension verification. Each sunshade required a gabled Standing Seam Metal Roof system designed for 110 MPH wind loads, LED lighting with 208Y120 three-phase service panels, NEMA 4 enclosures, hardwired 120-volt obstruction lights with solar photovoltaic backup and 12-hour battery pack, exothermically welded copper grounding rods tested to not exceed 25 ohms resistance, and a five-year construction warranty. The Buy American Act applied to all materials. Contractor personnel required base security clearance and flight line training; work hours were restricted to 0700–1700 with Government-provided escort coordination. The period of performance was 210 calendar days (90 days design, 120 days per structure construction), with schedule relief for Government-directed stoppages and FAA/TACW approval delays. Award was LPTA to the lowest-priced, technically acceptable offer.

Before cancellation, the due date had been extended multiple times, with the final quote deadline set for September 10, 2026. A mandatory site visit was scheduled for July 14, 2026, and questions were due July 21, 2026.

Notice text

6 versions

Update #6 · Latest ·

*******************

CANCELLATION OF SOLICITATION F4FANG6133A001 - EOU Sunshades Creech AFB

This Amendment cancels the EOU Sunshades Creech AFB solicitation in its entirety. The Government has determined that the requirement is no longer needed due to the requiring activity identifying existing Government space.

Accordingly, no award will be made under this solicitation, and the solicitation is hereby cancelled. 

All other terms and conditions are not applicable as the solicitation has been cancelled.

******************

The Experimental Operations Unit (EOU) at Creech AFB requires the purchase and installation of four shade structures for the CCA aircraft based on site.  Also, the relocation of the four existing structures and demolition of the 5th sunshade.  Four current sunshades will be turned perpendicular and align with the new sunshades.  The contractor shall design, provide, and construct the following shade structures on the airfield's parking apron:  1) Four CCA shade structures that include four aircraft parking bays each.  The new shade structures will be located on south ramp west of the current shade structures.  2)  Column concrete footings, per footing, as needed.  3) The new shade structures will adhere to the following requirements: The shade structure will require LED lights and their conduit, CU wiring, service power outlets, a service panel and its Una-strut support assembly, and a solar battery powered obstruction light.  4) PVA (Photovoltaic Array) or solar paneling with 12 hour battery pack for LED lighting and shade structure.

***This solicitation has been amended on 10 August 2026 to include attachment 4: EOU Sunshade RFI.***

***This solicitation has been amended on 1 September 2026 to extend the quote due date to 10 September 2026.***

Attachment 1:  Combo

Attachment 2:  SOW

Attachment 3:  Sunshade Map

Attachment 4:  EOU Sunshade RFI

Update #5 ·

The Experimental Operations Unit (EOU) at Creech AFB requires the purchase and installation of four shade structures for the CCA aircraft based on site.  Also, the relocation of the four existing structures and demolition of the 5th sunshade.  Four current sunshades will be turned perpendicular and align with the new sunshades.  The contractor shall design, provide, and construct the following shade structures on the airfield's parking apron:  1) Four CCA shade structures that include four aircraft parking bays each.  The new shade structures will be located on south ramp west of the current shade structures.  2)  Column concrete footings, per footing, as needed.  3) The new shade structures will adhere to the following requirements: The shade structure will require LED lights and their conduit, CU wiring, service power outlets, a service panel and its Una-strut support assembly, and a solar battery powered obstruction light.  4) PVA (Photovoltaic Array) or solar paneling with 12 hour battery pack for LED lighting and shade structure.

***This solicitation has been amended on 10 August 2026 to include attachment 4: EOU Sunshade RFI.***

***This solicitation has been amended on 1 September 2026 to extend the quote due date to 10 September 2026.***

Attachment 1:  Combo

Attachment 2:  SOW

Attachment 3:  Sunshade Map

Attachment 4:  EOU Sunshade RFI

Update #4 ·

The Experimental Operations Unit (EOU) at Creech AFB requires the purchase and installation of four shade structures for the CCA aircraft based on site.  Also, the relocation of the four existing structures and demolition of the 5th sunshade.  Four current sunshades will be turned perpendicular and align with the new sunshades.  The contractor shall design, provide, and construct the following shade structures on the airfield's parking apron:  1) Four CCA shade structures that include four aircraft parking bays each.  The new shade structures will be located on south ramp west of the current shade structures.  2)  Column concrete footings, per footing, as needed.  3) The new shade structures will adhere to the following requirements: The shade structure will require LED lights and their conduit, CU wiring, service power outlets, a service panel and its Una-strut support assembly, and a solar battery powered obstruction light.  4) PVA (Photovoltaic Array) or solar paneling with 12 hour battery pack for LED lighting and shade structure.

***This solicitation has been amended on 10 August 2026 to include attachment 4: EOU Sunshade RFI.***

***This solicitation has been amended on 26 August 2026 to extend the quote due date to 3 September 2026.***

Attachment 1:  Combo

Attachment 2:  SOW

Attachment 3:  Sunshade Map

Attachment 4:  EOU Sunshade RFI

Update #3 ·

The Experimental Operations Unit (EOU) at Creech AFB requires the purchase and installation of four shade structures for the CCA aircraft based on site.  Also, the relocation of the four existing structures and demolition of the 5th sunshade.  Four current sunshades will be turned perpendicular and align with the new sunshades.  The contractor shall design, provide, and construct the following shade structures on the airfield's parking apron:  1) Four CCA shade structures that include four aircraft parking bays each.  The new shade structures will be located on south ramp west of the current shade structures.  2)  Column concrete footings, per footing, as needed.  3) The new shade structures will adhere to the following requirements: The shade structure will require LED lights and their conduit, CU wiring, service power outlets, a service panel and its Una-strut support assembly, and a solar battery powered obstruction light.  4) PVA (Photovoltaic Array) or solar paneling with 12 hour battery pack for LED lighting and shade structure.

***This solicitation has been amended on 10 August 2026 to include attachment 4: EOU Sunshade RFI.***

***This solicitation has been amended on 18 August 2026 to extend the quote due date to 28 August 2026.***

Attachment 1:  Combo

Attachment 2:  SOW

Attachment 3:  Sunshade Map

Attachment 4:  EOU Sunshade RFI

Update #2 ·

The Experimental Operations Unit (EOU) at Creech AFB requires the purchase and installation of four shade structures for the CCA aircraft based on site.  Also, the relocation of the four existing structures and demolition of the 5th sunshade.  Four current sunshades will be turned perpendicular and align with the new sunshades.  The contractor shall design, provide, and construct the following shade structures on the airfield's parking apron:  1) Four CCA shade structures that include four aircraft parking bays each.  The new shade structures will be located on south ramp west of the current shade structures.  2)  Column concrete footings, per footing, as needed.  3) The new shade structures will adhere to the following requirements: The shade structure will require LED lights and their conduit, CU wiring, service power outlets, a service panel and its Una-strut support assembly, and a solar battery powered obstruction light.  4) PVA (Photovoltaic Array) or solar paneling with 12 hour battery pack for LED lighting and shade structure.

This solicitation has been amended on 10 August 2026 to include attachment 4: EOU Sunshade RFI.

Attachment 1:  Combo

Attachment 2:  SOW

Attachment 3:  Sunshade Map

Attachment 4:  EOU Sunshade RFI

Update #1 ·

The Experimental Operations Unit (EOU) at Creech AFB requires the purchase and installation of four shade structures for the CCA aircraft based on site.  Also, the relocation of the four existing structures and demolition of the 5th sunshade.  Four current sunshades will be turned perpendicular and align with the new sunshades.  The contractor shall design, provide, and construct the following shade structures on the airfield's parking apron:  1) Four CCA shade structures that include four aircraft parking bays each.  The new shade structures will be located on south ramp west of the current shade structures.  2)  Column concrete footings, per footing, as needed.  3) The new shade structures will adhere to the following requirements: The shade structure will require LED lights and their conduit, CU wiring, service power outlets, a service panel and its Una-strut support assembly, and a solar battery powered obstruction light.  4) PVA (Photovoltaic Array) or solar paneling with 12 hour battery pack for LED lighting and shade structure.

Attachment 1:  Combo

Attachment 2:  SOW

Attachment 3:  Sunshade Map

Files

File Type Posted
Attachment 5 - EOU Sunshade RFI - 26Aug26.pdf PDF
Attachment 4 - EOU Sunshade RFI.pdf PDF
Attachment 1 - Combo 1.pdf PDF
Attachment 2 - EOU Sunshades - SOW.pdf PDF
Attachment 1 - Combo.pdf PDF
Attachment 3 - Sunshade Map.pptx PPTX presentation

Notice history

Notice Type Posted
EOU Sunshades Creech AFB Latest pre-solicitation Pre-Solicitation
This notice Original Solicitation