Attachment 3 - Sunshade Map.pptx

PPTX presentation 759 KB Posted

Attached to
CANCELLATION NOTICE: EOU Sunshades Creech AFB
Solicitation number
F4FANG6133A001
Issued by

About this file

This is a visual layout document depicting the proposed sunshade configuration for the Experimental Operations Unit (EOU) at Creech Air Force Base. The map illustrates the planned placement of new shade structures alongside existing structures, with a key identifying rotated existing sunshades, newly proposed sunshades, and current locations of existing sunshades through color-coded or labeled imagery. The document serves as a spatial reference for the sunshade relocation and installation project, showing how four new CCA (likely Collaborative Combat Aircraft) shade structures with four aircraft parking bays each will be positioned on the south ramp west of current structures, while four existing sunshades will be rotated perpendicular to align with the new installations and a fifth sunshade will be demolished.

This attachment supports the overall solicitation requirements for design, procurement, and construction of the shade structures, which include specifications for LED lighting systems with conduit and wiring, service power outlets, panel assemblies, and solar photovoltaic arrays with 12-hour battery backup. The layout document is essential for bidders to understand the physical site configuration and spatial requirements for the construction scope of work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Proposed Layout

KEY

Rotated existing sunshades New sunshades Current location of existing sunshades image5.png image6.png image1.png image2.png image3.png image4.png image7.png image8.png image9.png

File details come from the government source that posted it. Updated .