ENVIRONMENTAL ASSESSMENT FOR REPAIR OF OVERHEAD 70kV TRANSMISSION LINE South Loop 2 VSFB, CA
Closed Pre-Solicitation Posted
- Solicitation number
- FA461026_EA_SL2
- Agency
-
Air Force Space Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541620 Environmental Consulting Services
- PSC
- F999 Other Environmental Services
- Place of performance
- California 93437, United States
Notice details come from SAM.gov. Updated .
About this opportunity
Air Force Space Command intends to solicit preparation of an Environmental Assessment for repair of an overhead 70-kilovolt transmission line at Vandenberg Space Force Base, California, with capability statements due by 30 June 2026 at 1400 PDT. This procurement is set aside for total small business.
Place of performance is Vandenberg Space Force Base, California, with work spanning a 12-month period of performance. The contractor will conduct project management, data collection, and extensive coordination with government and regulatory stakeholders across technical analyses of cultural resources, natural resources including wetlands and special status species, and construction noise. Deliverables include a Description of Proposed Action and Alternatives, multiple technical reports through various review cycles, and a legally sufficient EA document that results in either a Finding of No Significant Impact, a mitigated FONSI, or a determination that a full Environmental Impact Statement is necessary. The EA body is limited to 75 pages under the Fiscal Responsibility Act of 2023. Critical tasks include cultural resources fieldwork commencing no later than 15 days after award with completion within 40 days, Endangered Species Act Section 7 consultation, wetlands delineation and Clean Water Act Section 404/401 permitting coordination, coordination with the California State Historic Preservation Office and Santa Ynez Band of Chumash Indians, and construction noise modeling. All work must comply with Department of Defense and Department of the Air Force NEPA Implementing Procedures and conform to the DAF Environmental Impact Analysis Process (EIAP) format and guidance. The contractor provides all personnel, facilities, equipment, software, and materials.
Notice text
Based on the Statement of Work, the contractor will provide the services necessary to prepare a comprehensive Environmental Assessment (EA) for the repair of an overhead 70kV transmission line at Vandenberg Space Force Base. This includes project management, data collection, and extensive coordination with government and regulatory stakeholders. The core of the work involves conducting detailed technical analyses of the project's impact on cultural resources, natural resources (including wetlands and special status species), and construction noise. The contractor will produce a series of documents, including a Description of Proposed Action and Alternatives (DOPAA) and various technical reports. Ultimately, this effort will result in a legally sufficient EA document that will lead to a Finding of No Significant Impact (FONSI), a mitigated FONSI, or a determination that a full Environmental Impact Statement (EIS) is necessary. Interested vendors shall submit a capability statement and other relevant information NLT 30 June 2026 at 1400 PDT.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity