Ellsworth AFB, SD - Hydrant Fuel System Replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W9128F-20-R-0056
- Agency
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237120 Oil and Gas Pipeline and Related Structures Construction
- Place of performance
- Ellsworth Afb Sd Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals to replace the hydrant fuel system at Ellsworth Air Force Base in South Dakota. The project includes constructing an enclosed DoD Type III hydrant fueling pumphouse with control room, two aboveground 10,000-barrel fuel storage tanks with containment infrastructure, a filter building, distribution piping connecting to an existing fuel loop, a new product recovery tank, and extending a fuel transfer line. The U.S. Army Corps of Engineers Omaha District will evaluate proposals based on contractor qualifications, past performance, price, and small business participation plans. Proposals are due by July 14, 2020.
There is no set-aside designation. The primary NAICS code is 237990 and the dominant PSC code is Q230. The incumbent contractor is unknown. The estimated construction cost is over $10 million and the place of performance is Ellsworth Air Force Base in South Dakota. The project includes building infrastructure to support two 10,000-barrel fuel storage tanks and operating the hydrant fuel distribution system at the base.
Notice text
6 versions
Update #6 · Latest ·
See attached Amendment #0007. Amendment 0006 does not exist.
See attached amendment #0005. Amendment 0004 does not exist.
See attached Amendment #0008.
See attached Amendment #0009. Amendment 0009 -DIVISION 32 - EXTERIOR IMPROVEMENTS; SECTION 32 13 13 .03 CONCRETE PAVEMENT
Update #5 ·
See attached Amendment #0007. Amendment 0006 does not exist.
See attached amendment #0005. Amendment 0004 does not exist.
See attached Amendment #0008.
Update #4 ·
See attached Amendment #0007. Amendment 0006 does not exist.
See attached amendment #0005. Amendment 0004 does not exist.
Update #3 ·
See attached amendment #0005. Amendment 0004 does not exist.
Update #2 ·
See attached amendment #0003
Update #1 ·
The project includes: an enclosed DoD Type III hydrant fueling pumphouse with control room, two above ground 10,000 barrel fuel operating storage tanks with containment and the infrastructure for the Automatic Tank Gauging Equipment, filter building, distribution piping to existing loop, a ew product recovery tank, extension of a fuel transfer line and associated site work.
Attachments
Show all 21
Notice history
| Notice | Type | Posted |
|---|---|---|
| Ellsworth AFB, SD - Hydrant Fuel System Replacement | Award Notice | |
| General Billy Mitchell ANGB, WI Hydrant Fuel System Replacement | Solicitation | |
| General Billy Mitchell ANGB, WI Hydrant Fuel System Replacement | Pre-Solicitation | |
| Ellsworth AFB, SD - Hydrant Fuel System Replacement | Solicitation | |
| Ellsworth AFB, SD - Hydrant Fuel System Replacement | Pre-Solicitation | |
| Hydrant Fuel System Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity