W9128F-20-R-0056am_0003Specifications.pdf
PDF 1 MB Posted
- Attached to
- Ellsworth AFB, SD - Hydrant Fuel System Replacement Federal contract opportunity
- Solicitation number
- W9128F-20-R-0056
About this file
This is a solicitation for a hydrant fuel system replacement project at Ellsworth Air Force Base in South Dakota. The project includes constructing an enclosed DoD Type III hydrant fueling pumphouse with a control room, installing two aboveground 10,000-barrel fuel storage tanks with containment structures, constructing a filter building, laying distribution piping to connect to an existing fuel loop, installing a new product recovery tank, extending a fuel transfer line, and performing associated site work. The solicitation was issued by the Department of the Army Corps of Engineers Omaha District. Responses are due by July 14, 2020.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9128F-20-R-0056am_0009Narrative.pdf | ||
| W9128F20R0056-Am-0009-Specifications.pdf | ||
| W9128F20R0056-Am-0008-Drawings.pdf | ||
| W9128F-20-R-0056am_0008Narrative.pdf | ||
| W9128F20R0056-Am-0008-Specifications.pdf | ||
| W9128F-20-R-0056am_0007 Narrative.pdf | ||
| W9128F-20-R-0056am_0007 Specifications.pdf | ||
| W9128F20R0056-Am-0007 Drawings.PDF | ||
| W9128F-20-R-0056-0007.pdf | ||
| W9128F-20-R-0056 0005.pdf | ||
| W9128F-20-R-0056_0005 Narrative.pdf | ||
| W9128F-20-R-0056_0005 Drawings.PDF | ||
| W9128F-20-R-0056_0005 Specifications.pdf | ||
| W9128F-20-R-0056 0003.pdf | ||
| W9128F-20-R-0056_0003Narrative.pdf | ||
| W9128F-20-R-0056 0003.pdf | ||
| W9128F-20-R-0056 00002.pdf | ||
| W9128F-20-R-0056 Ellsworth AFB-1.pdf | ||
| Attachment A - NAVFAC USACE PPQ Form Sep 2011-Ellsworth.pdf | ||
| W9128F-20-R-0056-Vol-2-Technical-Specs.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Am #0003 - 1 (Continuation SF 30)
26 June 2020 Solicitation No. W9128F20R0056
Date of Issue: 11 JUN 2020 Date of Receiving Proposals: 14 JUL 2020
SUBJECT: Amendment No. 0003 to Request for Proposal Solicitation Package for specifications and drawings for Construction of HYRDANT FUEL SYSTEM REPLACEMENT, DESC1913, ELLSWORTH AFB, SOUTH DAKOTA
TO: Prospective Offerors and Others Concerned
1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).
a. Specifications. (Descriptive Changes.)
(1) Bidder Inquiries with Revised Information to Responses:
8648300 - The hydrant control valve will not be added to the drawings 8648705 - Drawing changed instead of the spec.
8648720 - Drawing changed instead of the spec.
8648735 - Drawing and spec changed.
8648784 – The piping is not going to change to 12 inches.
8649012 - FTP-1 will be an API 610 Vertical Turbine pump.
8660982 - Stainless steel piping will be used in the pumphouse and the hydrant loop piping. Carbon steel will be used everywhere else.
b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by “*Am-3” (underlining of added text. Deleted text is not shown.
Pages or Sections Deleted Pages or Sections Substituted or Added Submittal Register Submittal Register 08 51 13 --- 08 51 23 08 51 23 33 52 43.11 33 52 43.11 33 52.43.13 33 52 43.13 33 52 43.14 33 52 43.14 33 52 43.23 33 52 43.23 33 52 43.28 33 52 43.28 33 52 80 33 52 80
c. Drawings (Reissued). The following drawings are revised with latest revision date of 26 June 2020, and reissued with this amendment.
GENERAL
G-003 INDEX - (2 OF 2)
SITE/CIVIL
CS103 SITE PLAN - AREA 3
CG501 GRADING AND DRAINAGE DETAILS - SHEET 1 OF 4
Am #0003 - 2
STRUCTURAL SITE
SS405 PRT PIPE SUPPORTS
MECHANICAL SITE
MS201 HYDRANT LOOP ISSUE PIPING PLANS AND PROFILES SHEET 1 OF 3
MS202 HYDRANT LOOP ISSUE PIPING PLANS AND PROFILES SHEET 2 OF 3
MS203 HYDRANT LOOP ISSUE PIPING PLANS AND PROFILES SHEET 3 OF 3
MS204 HYDRANT LOOP RETURN PIPING PLANS AND PROFILES SHEET 1 OF 4
MS205 HYDRANT LOOP RETURN PIPING PLANS AND PROFILES SHEET 2 OF 4
MS206 HYDRANT LOOP RETURN PIPING PLANS AND PROFILES SHEET 3 OF 4
MS207 HYDRANT LOOP RETURN PIPING PLANS AND PROFILES SHEET 4 OF 4
MS208 HHT ISSUE PIPING PLANS AND PROFILES
MS209 HHT RETURN PIPING PLANS AND PROFILES
MS210 PUMPHOUSE ISSUE PIPING PLANS AND PROFILES SHEET 1 OF 6
MS214 PUMPHOUSE ISSUE PIPING PLANS AND PROFILES SHEET 5 OF 6
MS215 PUMPHOUSE ISSUE PIPING PLANS AND PROFILES SHEET 6 OF 6
MS216 PUMPHOUSE RETURN PIPING PLANS AND PROFILES SHEET 1 OF 6
MS221 PUMPHOUSE RETURN PIPING PLANS AND PROFILES SHEET 6 OF 6
MS222 TANK 1 ISSUE PIPING PLANS AND PROFILES
MS223 TANK 1 RECEIPT PIPING PLANS AND PROFILES
MS225 TANK 2 RECEIPT PIPING PLANS AND PROFILES SHEET 2 OF 2
MS229 TRANSFER 1 PIPING PLANS AND PROFILES SHEET 4 OF 4
MS230 TRANSFER 2 PIPING PLANS AND PROFILES SHEET 1 OF 4
MS233 TRANSFER 2 PIPING PLANS AND PROFILES SHEET 4 OF 4
MS401 ISOLATION CONTAINMENT VAULT DETAIL
MS402 PIPING CONNECTION DETAIL SHEET 1 OF 3
MS502 MECHANICAL SITE DETAILS SHEET 2 OF 2
MS503 4,000 GALLON PRT DETAILS SHEET 1 OF 2
ELECTRICAL SITE
ES502 HAND HOLE DETAILS
PUMPHOUSE & FILTER BUILDING
STRUCTURAL
SB101 PUMPHOUSE FOUNDATION PLAN
SB302 FOUNDATION SECTIONS / SHEET 2
ARCHITECTURAL
A-101 PUMP HOUSE BUILDING - FLOOR PLAN
A-102 FILTER BUILDING - FLOOR PLAN
A-141 PUMP HOUSE BUILDING - ROOF PLANS AND REFLECTED CEILING PLAN
A-201 PUMP HOUSE BUILDING - BUILDING ELEVATIONS AND SECTION
A-202 FILTER BUILDING - BUILDING ELEVATIONS AND SECTION
A-401 WALL SECTIONS
A-402 WALL SECTIONS
A-501 ROOF DETAILS
A-502 ROOF DETAILS
A-601 PUMP HOUSE AND FILTER BUILDING - ROOM FINISH SCHEDULE AND DOOR SCHEDULE
A-701 DOOR, WINDOW, AND LOUVER DETAILS
A-702 WINDOW AND LOUVER DETAILS
MECHANICAL
M-101 PUMPHOUSE PIPING PLAN
M-102 FILTER BUILDING PIPING PLAN
M-201 FLOW DIAGRAM
M-202 ISOMETRIC DIAGRAM SHEET 1 OF 3
M-301 PUMPHOUSE SECTIONS SHEET 1 OF 3
Am #0003 - 3
M-501 MECHANICAL DETAILS SHEET 1 OF 3
M-502 MECHANICAL DETAILS SHEET 2 OF 3
M-503 MECHANICAL DETAILS SHEET 3 OF 3
M-504 500 GALLON PRT DETAILS
M-601 FUEL SYSTEM SCHEDULES
ELECTRICAL
EP601 ONE LINE DIAGRAM
EP606 SCHEDULE SHEET 2
d. Drawings (New). The following new drawing dated 26 June 2020 is hereby added to the contract drawings and are issued with this amendment.
PUMPHOUSE & FILTER BUILDING
STRUCTURAL
SB303 FOUNDATION SECTIONS / SHEET 3
2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.
3. Electronic Proposal/Email. Provide proposals Email to the following address:
Kenyanna.Jennings@usace.army.mil and
John.D.Hickman@usace.army.mil]
4. Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals, 140 July 2020, as stated in the Request For Proposal.
Attachments:
Spec Pages listed in 1.b. above Dwgs. listed in 1.c. and 1.d. above (Under Separate Cover)
U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901
26 June 2020 drl/2181
This page was intentionally left blank for duplex printing.
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 86 PAGES
Hydrant Fuel System Replacement, Ellsworth AFB, SD
01 30 00.24 SD-02 Shop Drawings
1.29 G ROEquipment Room Drawings
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 G ROSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.4.1 G ROSustainability Action Plan
1.5.1.1 G ROPreliminary Sustainability
eNotebook SD-11 Closeout Submittals
1.5.1.1 G ROFinal Sustainability eNotebook
1.5.1.1 G ROAmended Final Sustainability
eNotebook 01 35 26 SD-01 Preconstruction Submittals
1.7 G ROAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 G ROAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.4Crane Operators/Riggers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Am #0003
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 86 PAGES
01 35 26 1.7.2.2 G ROStandard Lift Plan
1.7.2.3 G ROCritical Lift Plan
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates
01 41 26.01 24 SD-01 Preconstruction Submittals 3.2.1Notice of Intent 3.2.2Authorization Letter 3.2.4Storm Water Pollution Prevention
Plan 3.2.7Notice of Termination
SD-06 Test Reports 3.2.5Reports
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan SD-06 Test Reports
3.9Verification Statement 01 45 35 SD-01 Preconstruction Submittals
3.1.1 G DOSIOR Letter of Acceptance
3.1.1 G DOProject Manual
3.1.1 G DOProject Manual
3.1.1Written Practices 3.1.3Written Practices
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 86 PAGES
01 45 35 3.1.1NDT Procedures and Equipment Calibration Records
3.1.3NDT Procedures and Equipment Calibration Records
SD-06 Test Reports 3.1.1Daily Reports 3.1.3Daily Reports 3.1.3Daily Reports 3.1.1Biweekly Reports 3.1.2Biweekly Reports
SD-07 Certificates 2.1Fabrication Plant 2.1AC472 Accreditation 2.1Steel Joist Institute Membership 2.1Certificate of Compliance
1.5.17 G DOSpecial Inspector of Record
1.5 G DOSpecial Inspector
3.1.1Qualification Records 3.1.3Qualification Records
SD-11 Closeout Submittals 3.1.1Interim Final Report 3.1.3Interim Final Report
3.1.1 G DOComprehensive Final Report
3.1.3 G DOComprehensive Final Report
01 57 20.00 10 SD-01 Preconstruction Submittals
1.9 G ROEnvironmental Protection Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 86 PAGES
01 57 23 SD-07 Certificates 2.1.3Mill Certificate or Affidavit
01 74 19 SD-01 Preconstruction Submittals
1.7 G ROConstruction Waste Management
Plan SD-06 Test Reports
1.9.2Quarterly Reports 1.9.3Annual Report
SD-11 Closeout Submittals 1.10Final Construction Waste
Diversion Report 01 78 23 SD-10 Operation and Maintenance
Data
3.1.1 G ROTraining Plan
3.1.3 G ROTraining Outline
3.1.2 G ROTraining Content
SD-11 Closeout Submittals
3.1.4 G ROTraining Video Recording
3.1.6 G ROValidation of Training Completion
01 78 23.33 SD-10 Operation and Maintenance Data
2.1.1 G ROSystem Instructions
01 78 24.00 20 SD-11 Closeout Submittals
1.4.1 G ROeOMSI, Progress Submittal
1.4.2 G ROeOMSI, Prefinal Submittal
1.4.3 G ROeOMSI, Final Submittal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 86 PAGES
01 78 36.00 24 SD-11 Closeout Submittals 1.2.5Equipment Warranty Booklet
01 78 39.00 24 SD-03 Product Data
1.7.2 G DO50 Percent Preliminary As-Built
Drawings
1.7.3 G DO100 Percent Preliminary As-Built
Drawings SD-11 Closeout Submittals
1.7.4 G DOFinal As-Built Drawings
1.4.4 G ROLEED Documentation
02 41 00 SD-01 Preconstruction Submittals
1.2.2 G RODemolition Plan
1.10Existing Conditions
SD-07 Certificates
1.6 G RONotification
03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan
1.6.5 G DOQuality Control Plan
1.6.6 G ROQuality Control Personnel
Certifications 1.6.6Quality Control Organizational
Chart
1.6.8 G DOLaboratory Accreditation
3.3.10Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 G DOReinforcing Steel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 86 PAGES
03 30 00 SD-03 Product Data 2.4.5Joint Sealants 2.4.4Joint Filler 2.1Formwork Materials 2.3.3.2Recycled Aggregate Materials 2.3.1Cementitious Materials 2.4.6Vapor Retarder and Vapor
Barrier 2.4.1Concrete Curing Materials 2.6Reinforcement 2.4.3.1Liquid Chemical Floor Hardeners and Sealers 2.3.4Admixtures 2.6.2Mechanical Reinforcing Bar
Connectors 2.2.2Waterstops 2.2.3Biodegradable Form Release
Agent 1.6.3.2Pumping Concrete 2.4.2Nonshrink Grout
SD-05 Design Data
1.6.1.1 G DOConcrete Mix Design
SD-06 Test Reports
1.6.1.1 G DOConcrete Mix Design
1.6.4.1Fly Ash 1.6.4.1Pozzolan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 86 PAGES
03 30 00 1.6.4.2Slag Cement 1.6.4.3Aggregates
3.13.2.3 G DOCompressive Strength Tests
3.13.2.4Air Content 3.13.2.1Slump Tests 2.3.2Water
SD-07 Certificates 2.6.1Reinforcing Bars 1.6.3.3VOC Content for Form Release
Agents, Curing Compounds, and Concrete Penetrating Sealers
1.6.3.4Safety Data Sheets 1.8.1Forest Stewardship Council
(FSC) Certification 1.6.6.2Field Testing Technician and
Testing Agency SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants 2.4.1Curing Compound
04 20 00 SD-02 Shop Drawings
3.3.2.1 G ROCut CMU
3.4.1.1 G DODetail Drawings
SD-03 Product Data
1.5.1 G ROHot Weather Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 86 PAGES
04 20 00 1.5.2 G ROCold Weather Procedures
2.2.2.2.1 G DOCement
2.4.1.1 G DOCementitious Materials
SD-04 Samples
2.2.2.2 G ROConcrete Masonry Units (CMU)
2.4.1.4 G DOAdmixtures for Masonry Mortar
2.6.2 G ROAnchors, Ties, and Bar
Positioners
2.6.3 G ROJoint Reinforcement
SD-05 Design Data
2.1.2 G DOMasonry Compressive Strength
2.2.2.4Fire-Rated Concrete Masonry
Units
3.2.5 G ROBracing Calculations
SD-06 Test Reports 2.2.2.4Fire-Rated Concrete Masonry
Units 3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout 3.6.1.3Single-Wythe Masonry Wall
Water Penetration Test SD-07 Certificates
1.3.1Special Masonry Inspector Qualifications
2.2.2.2Concrete Masonry Units (CMU) 2.4.1.1Cementitious Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 86 PAGES
04 20 00 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar
Positioners 2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance Data
3.8Take-Back Program SD-11 Closeout Submittals
2.2.2.2.2Recycled Content 05 05 23.16 SD-01 Preconstruction Submittals
3.2Welding Quality Assurance Plan SD-03 Product Data
1.3 G ROWelding Procedure Qualifications
1.3.5Welder, Welding Operator, and
Tacker Qualification 1.3.6Inspector Qualification 1.3.2Previous Qualifications 1.3.3Pre-Qualified Procedures 2.2Welding Electrodes and Rods
SD-06 Test Reports 3.3Nondestructive Testing
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 86 PAGES
05 05 23.16 1.3.1Certified Welding Procedure Specifications (WPS)
1.3.1Certified Brazing Procedure Specifications (BPS)
1.3.1Certified Procedure Qualification Records (PQR)
1.3.1Certified Welder Performance Qualifications (WPQ)
1.3.1Certified Brazer Performance Qualifications (BPQ)
05 12 00 SD-01 Preconstruction Submittals
1.3.1.1 G ROErection Drawings
SD-02 Shop Drawings
1.3.2 G DOFabrication Drawings
SD-03 Product Data
2.6.2 G ROShop Primer
2.4.1 G ROWelding Electrodes and Rods
2.3.2.3 G RODirect Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.3 G ROTension Control Bolts
SD-06 Test Reports 2.6.2Class B Coating
2.3 G ROBolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports 3.7.2.1Direct Tension Indicator Washer
Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 86 PAGES
05 12 00 3.7.3.1Bolt Testing Reports 3.7.4Embrittlement Test Reports
SD-07 Certificates
2.2 G ROSteel
2.3 G ROBolts, Nuts, and Washers
2.5 G ROGalvanizing
1.3.3.1Welding Procedures and
Qualifications 2.4.1Welding Electrodes and Rods
05 21 00 SD-01 Preconstruction Submittals 1.3.2Welder Qualification
SD-02 Shop Drawings
1.3.1 G DOSteel Joist Framing
SD-05 Design Data
2.2 G DODesign Calculations
SD-06 Test Reports 3.4Erection Inspection 3.4Welding Inspections
SD-07 Certificates 1.3.2Certification of Compliance
05 30 00 SD-02 Shop Drawings
1.3.4 G DOFabrication Drawings
SD-03 Product Data
2.2 G DOAccessories
2.1Deck Units 2.1.4Touch-Up Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 86 PAGES
05 30 00 1.3.2Welding Equipment 1.3.2Welding Rods and Accessories
SD-05 Design Data
2.1 G DODeck Units
SD-07 Certificates 1.3.2Welder Qualifications 1.3.2Welding Procedures 1.3.3.1Fire Safety 1.3.1Manufacturer's Certificate
SD-11 Closeout Submittals 2.1Recycled Content of Steel
Products 05 40 00 SD-02 Shop Drawings
1.6.1 G DOFraming Components
SD-03 Product Data
2.1Studs, Joists 2.1Recycled Content of Steel
Products SD-05 Design Data
1.6.2 G DOMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal Framing
3.2.1Welds 05 50 13 SD-02 Shop Drawings
2.4 G DOFloor Gratings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 86 PAGES
05 50 13 2.5 G DOBollards/Pipe Guards
2.6 G DOAngles and Plates
2.8 G DODouble Leaf Valve Vault Doors
2.9 G DOPipe Supports
SD-03 Product Data
2.4 G DOFloor Gratings
2.8 G DODouble Leaf Valve Vault Doors
SD-07 Certificates
2.1 G DOCertificates of Compliance
2.2 G DOCertified Mill
SD-11 Closeout Submittals 2.1Recycled Content
05 51 00 SD-02 Shop Drawings
2.1 G DOIron and Steel Hardware
2.1 G DOSteel Shapes, Plates, Bars, and
Strips
2.2.1 G DOMetal Stair System
SD-03 Product Data
2.4.1 G DOStructural-Steel Plates, Shapes, and Bars
2.4.2 G DOStructural-Steel Tubing
2.4.5 G DOHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 G DOCold-Finished Steel Bars
2.4.3 G DOHot-Rolled Carbon Steel Bars
2.4.6 G DOCold-Rolled Carbon Steel Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 86 PAGES
05 51 00 2.4.7 G DOGalvanized Carbon Steel Sheets
2.4.8 G DOCold-Drawn Steel Tubing
2.2.3 G DOProtective Coating
2.3.1 G DOSteel Stairs
SD-08 Manufacturer’s Instructions
2.4.1 G DOStructural-Steel Plates, Shapes, and Bars
2.4.2 G DOStructural-Steel Tubing
2.4.5 G DOHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 G DOCold-Finished Steel Bars
2.4.3 G DOHot-Rolled Carbon Steel Bars
2.4.6 G DOCold-Rolled Carbon Steel Sheets
2.4.7 G DOGalvanized Carbon Steel Sheets
2.4.8 G DOCold-Drawn Steel Tubing
2.2.3 G DOProtective Coating
05 51 33 SD-02 Shop Drawings 2.3Ladders
SD-03 Product Data 2.3Ladders 2.3.1Ladder Safety Devices
SD-07 Certificates 1.3Fabricator Certification for Ladder
Assembly 05 52 00 SD-02 Shop Drawings
1.2.1 G DOFabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 86 PAGES
05 52 00 3.2Iron and Steel Hardware 3.2Steel Shapes, Plates, Bars and
Strips SD-03 Product Data
2.2.1Structural Steel Plates, Shapes, and Bars
2.2.2Structural Steel Tubing 2.2.3Hot-Rolled Carbon Steel Bars 2.1.2Protective Coating 2.2.6Steel Railings and Handrails 1.2.1Anchorage and Fastening
Systems SD-08 Manufacturer’s Instructions
3.2Installation Instructions 06 10 00 SD-02 Shop Drawings
3.2.1 G RONailers
3.2.1.1 G ROStrips
SD-03 Product Data 1.8Fire-retardant treatment
SD-06 Test Reports 1.4.3Preservative-treated
SD-07 Certificates 1.9.1Certificates of grade 1.7Preservative treatment
SD-11 Closeout Submittals 2.3.2Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 86 PAGES
07 21 13 SD-03 Product Data
2.1 G DOBlock or board insulation
2.2Vapor retarder 2.3Pressure sensitive tape 2.4Protection board or coating 2.5Accessories
SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.5.1Adhesive
07 22 00 SD-02 Shop Drawings 2.5Wood nailers
SD-03 Product Data
2.4 G ROFasteners
2.1 G ROInsulation
1.4.2Certification 2.1.3Recycled materials 1.4.3Local/Regional Materials
SD-06 Test Reports 1.4.1Flame spread and smoke developed ratings SD-07 Certificates
1.3qualifications SD-08 Manufacturer’s Instructions
2.4fasteners 2.1insulation
07 52 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 86 PAGES
07 52 00 1.4.7 G DORoof plan SD-03 Product Data
2.1 G DOModified Bitumen Sheets
3.3.3.1 G DOCold Adhesive Applied Modified
Bitumen Membrane
2.3 G ROCold-Applied Membrane
Adhesive
2.1 G ROFiberglass Felt
2.5 G ROPrimer
2.6 G ROModified Bitumen Roof Cement
2.8Pre-Manufactured Accessories
2.7 G DOFasteners And Plates
1.8 G ROWarranty
SD-05 Design Data
1.4.6 G DOWind Uplift Calculations
SD-07 Certificates 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator 1.4.4Qualification of Engineer of
Record
1.4.6 G DOWind Uplift Resistance
1.4.5 G ROFire Resistance
SD-08 Manufacturer’s Instructions
3.3.6 G DOModified Bitumen Membrane
Application
3.3.7 G DOFlashing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 86 PAGES
07 52 00 2.5Primer 2.7.1Fasteners 3.3.4Ventilating Base Sheets
3.3.8.1 G ROCoating Application
1.6 G ROCold Weather Installation
SD-11 Closeout Submittals 1.8Warranty 3.8Information Card 3.7Instructions To Government
Personnel 07 60 00 SD-02 Shop Drawings
2.2.1 G ROExposed Sheet Metal
3.1.14 G ROGutters
3.1.15 G RODownspouts
2.2.1 G ROGravel Stops and Fasciae
3.1.10 G ROBase Flashing
3.1.11 G ROCounterflashing
3.1.18 G ROFlashing at Roof Penetrations
and Equipment Supports
3.1.13 G RODrip Edges
3.1.16 G ROEave Flashing
3.1.17 G ROExpansion Joints
SD-04 Samples
1.4.2 G ROFinish Samples
SD-07 Certificates
2.1 G ROCertificates of Compliance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 86 PAGES
07 60 00 2.1 G RORecycled Content SD-08 Manufacturer’s Instructions
1.4.3 G ROInstructions for Installation
3.5 G ROQuality Control Plan
SD-10 Operation and Maintenance Data
1.4.3 G ROCleaning and Maintenance
07 61 14.00 20 SD-02 Shop Drawings
1.2.4 G DORoofing
SD-03 Product Data
2.1 G DORoofing panels
2.3Attachment clips 2.4.1Closures 2.4Accessories 2.4.2Fasteners 2.4.3Sealants
1.7 G DOwarranty
SD-04 Samples 2.1panel 2.4Accessories 2.4.3Sealants 2.2Intermediate Support
SD-05 Design Data 1.5Design calculations
SD-06 Test Reports
3.6 G ROField Inspection
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 86 PAGES
07 61 14.00 20 1.3.3Structural performance 1.6.6Finish
SD-07 Certificates 1.6.3Manufacturer's Technical
Representative 1.6.4Installer's Qualifications
2.1 G ROCoil stock
SD-08 Manufacturer’s Instructions
3.3 G ROInstallation
07 84 00 SD-02 Shop Drawings 2.1Firestopping Materials
SD-07 Certificates 2.1Firestopping Materials 1.4Installer Qualifications 3.3Inspection
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates 3.3.6Sealant
08 11 13 SD-02 Shop Drawings
2.1 G RODoors
2.1 G RODoors
2.5 G ROFrames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 86 PAGES
08 11 13 2.5 G ROFrames 2.3Accessories 2.6Weatherstripping
SD-03 Product Data
2.1 G RODoors
2.5 G ROFrames
2.3Accessories 2.6Weatherstripping
08 51 23 SD-02 Shop Drawings 2.2Windows
SD-03 Product Data 2.2Windows 2.6.5Fasteners 2.1Materials 2.6Accessories
SD-04 Samples
2.7.2 G ROColor coating
2.2Windows
SD-06 Test Reports 1.3.1Air infiltration 1.3.1Water infiltration
2.3 G ROFire Rating
SD-10 Operation and Maintenance Data
2.2 G ROWindows
08 71 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 86 PAGES
08 71 00 1.3 G ROHardware schedule 2.3.5Keying system
SD-03 Product Data
2.3 G DOHardware items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-10 Operation and Maintenance Data
1.3 G ROHardware Schedule
SD-11 Closeout Submittals
1.4Key Bitting 08 81 00 SD-02 Shop Drawings
3.2.2Installation SD-03 Product Data
1.6.1Insulating Glass 1.3Glazing Accessories
SD-04 Samples 1.6.1Insulating Glass 2.3.5Tape 2.3.2.1Sealant
SD-07 Certificates 1.6.1Insulating Glass 1.3Glazing Accessories
SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 86 PAGES
08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers
SD-03 Product Data 2.2Metal Wall Louvers
SD-04 Samples
1.4 G ROWall louvers
1.5 G ROWall louvers
09 22 00 SD-02 Shop Drawings
2.1 G ROMetal support systems
09 29 00 SD-03 Product Data 2.1.5Accessories 2.1.2Joint Treatment Materials
SD-07 Certificates
2.1 G ROAsbestos Free Materials
SD-08 Manufacturer’s Instructions 2.1Material Safety Data Sheets
SD-10 Operation and Maintenance Data
2.1Manufacturer maintenance instructions
3.8Waste Management SD-11 Closeout Submittals
2.1.1Gypsum Board 2.1.4Adhesives
09 51 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 86 PAGES
09 51 00 1.2 G ROApproved Detail Drawings SD-03 Product Data
1.2 G ROAcoustical Ceiling Systems
1.4Certification
SD-04 Samples
2.1 G ROAcoustical Units
2.1.1 G ROAcoustic Ceiling Tiles
SD-06 Test Reports
1.2.1 G ROCeiling Attenuation Class and
Test SD-07 Certificates
2.1 G ROAcoustical Units
2.1.1 G ROAcoustic Ceiling Tiles
09 65 00 SD-02 Shop Drawings
2.8 G DOResilient Flooring and
Accessories
2.1 G DOLuxury Vinyl Tile
SD-03 Product Data
2.8 G DOResilient Flooring and
Accessories 2.4Adhesives
2.1 G DOLuxury Vinyl Tile
2.2 G DOWall Base
SD-04 Samples
2.8 G DOResilient Flooring and
Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 86 PAGES
09 65 00 2.1 G DOLuxury Vinyl Tile
2.2 G DOWall Base
SD-06 Test Reports
3.3 G ROMoisture, Alkalinity and Bond
Tests SD-08 Manufacturer’s Instructions
3.2Surface Preparation 3.1Installation
SD-10 Operation and Maintenance Data
2.8Resilient Flooring and Accessories
SD-11 Closeout Submittals 1.3LEED Documentation
09 90 00 SD-02 Shop Drawings
3.8 G ROPiping identification
3.8stencil
SD-03 Product Data 2.1Materials 1.4.2Certification
2.1 G ROCoating
2.1Manufacturer's Technical Data
Sheets SD-04 Samples
1.9 G ROColor
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 86 PAGES
09 90 00 1.3Applicator's qualifications
1.4.1.2 G ROQualification Testing
SD-08 Manufacturer’s Instructions 3.5.1Application instructions 3.5.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets SD-10 Operation and Maintenance Data
2.1 G ROCoatings:
09 97 13.17 SD-05 Design Data
1.4.4.1Environmental Control System
1.4.4.2 G DOUse of Door Sheet Access Way
SD-06 Test Reports 1.4.5.1Metallic Abrasive Qualification
Test Reports 3.2.3Coating Sample Test Reports 3.2.4Abrasive Sample Test Reports 3.10.2.2Inspection Report Forms 3.10.2.3Daily Inspection Reports 1.4.5.2Recycled Metallic Abrasive Field
Test Reports (Daily and Weekly) SD-07 Certificates
1.4.1Contract Errors, Omissions, and Other Discrepancies
1.4.2.1Corrective Action Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 86 PAGES
09 97 13.17 1.4.3Coating Work Plan 1.4.6.1Qualifications of Certified
Industrial Hygienist (CIH) 1.4.6.5Qualifications Of Individuals
Performing Abrasive Blasting 1.4.6.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.6.3Qualifications of Coating Inspection Company
1.4.6.4Qualifications of QC Specialist Coating Inspector
1.4.6.6Qualifications of Testing Laboratory for Coatings
1.4.6.7Qualifications of Testing Laboratory for Abrasive
1.4.6.8Qualifications of Coating Contractors
1.4.6.9Roof Joint Sealant Materials 1.4.6.10Roof Joint Sealant Compatibility 1.4.6.11Epoxy Coating Materials 1.4.6.12Non-metallic Abrasive 1.4.6.13Metallic Abrasive
SD-08 Manufacturer’s Instructions 1.5.1Roof Joint Sealant Instructions 1.5.2Coating System Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 86 PAGES
09 97 13.17 SD-11 Closeout Submittals
3.7.6 G RODisposal of Used Abrasive
3.10.2.4 G ROInspection Logbook
09 97 13.27 SD-05 Design Data 1.4.4.1Containment System
SD-06 Test Reports 1.4.5.1Joint Sealant Qualification Test
Reports 1.4.5.2Coatings Qualification Test
Reports 1.4.5.3Metallic Abrasive Qualification
Test Reports 3.1.3Coating Sample Test Reports 3.1.4Abrasive Sample Test Reports 3.8.2.2Inspection Report Forms 3.8.2.3Daily Inspection Reports 1.4.5.4Recycled Metallic Abrasive Field
Test Reports (Daily and Weekly) SD-07 Certificates
1.4.1Contract Errors, Omissions, and Other Discrepancies
1.4.2.1Corrective Action Procedures 1.4.3Coating Work Plan 1.4.6.1Qualifications of Certified
Industrial Hygienist (CIH)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 86 PAGES
09 97 13.27 1.4.6.5Qualifications Of Individuals Performing Abrasive Blasting
1.4.6.2Qualifications of Certified Protective Coatings Specialist
(PCS)
1.4.6.3Qualifications of Coating Inspection Company
1.4.6.4Qualifications of QC Specialist Coating Inspector
1.4.6.6Qualifications of Testing Laboratory for Coatings
1.4.6.7Qualifications of Testing Laboratory for Abrasive
1.4.6.8Qualifications of Coating Contractors
1.4.6.9Joint Sealant Materials 1.4.6.10Coating Materials 1.4.6.11Coating System Component
Compatibility 1.4.6.12Non-metallic Abrasive 1.4.6.13Metallic Abrasive
SD-08 Manufacturer’s Instructions 1.5.1Joint Sealant Instructions 1.5.2Coating System Instructions
SD-11 Closeout Submittals 3.5.6Disposal of Used Abrasive
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 86 PAGES
09 97 13.27 3.8.2.4Inspection Logbook 10 44 16 SD-01 Preconstruction Submittals
2.1 G ROManufacturer's Data
SD-02 Shop Drawings
2.1 G ROFire Extinguishers
1.3.1Accessories Part 2 G ROCabinets
SD-03 Product Data 2.1Fire Extinguishers 1.3.1Accessories Part 2Cabinets 3.2.1Replacement Parts
SD-04 Samples 1.3.1Fire Extinguisher 1.3.1Cabinet 1.3.1Accessories
SD-07 Certificates 2.1Fire Extinguishers 2.1Manufacturer's Warranty with
Inspection Tag 13 34 19 SD-01 Preconstruction Submittals
1.6.3 G DOManufacturer's Qualifications
SD-02 Shop Drawings
1.6.1 G DODetail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 86 PAGES
13 34 19 G DOsustainable acquisition compliance
1.6.1 G DOManufacturer's catalog data
SD-04 Samples
1.6.1 G ROCoil Stock
2.1.8 G ROCoil Stock
1.2.1.9 G RORoof Panels
1.2.1.9 G ROWall Panels
2.5.2 G DOFasteners
2.8.1 G ROMetal Closure Strips
1.4.7 G ROInsulation
2.4.2 G ROInsulation
1.6.10 G ROVapor Barrier
2.4.3 G DOManufacturer's color charts and
chips SD-05 Design Data
1.6.1 G DOdescriptive and technical
literature
1.6.1 G DObuilding design analysis
SD-06 Test Reports
1.6.1 G DOtest reports
1.6.1 G DOCoatings and base metals
1.6.1 G DOFactory Color Finish Performance
Requirements SD-07 Certificates
1.6.1 G ROsystem components
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 86 PAGES
13 34 19 1.6.1 G ROCoil Stock
2.1.8 G ROCoil Stock
1.6.1 G ROAluminized Steel Repair Paint
1.6.1 G ROGalvanizing Repair Paint
1.6.1 G ROEnamel Repair Paint
1.6.1 G DOQualification of Manufacturer
1.6.1 G DOQualification of Erector
SD-08 Manufacturer’s Instructions
1.6.2 G DOInstallation of Roof and Wall
panels
1.7 G ROshipping, handling, and storage
SD-11 Closeout Submittals
3.14.1 G ROManufacturer's Warranty
3.14.2 G ROContractor's Warranty for
Installation 22 00 00 SD-02 Shop Drawings
3.8.1 G ROPlumbing System
SD-03 Product Data
2.1 G RORecycled Content for Steel Pipe
2.1 G RORecycled Content for Cast Iron
Pipe
2.4 G DOFixtures
2.4.2 G DOFlush Valve Water Closets
2.4.2 G DOWaterSense Label for Flush
Valve Water Closet
2.4.3 G DOCountertop Lavatories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 86 PAGES
22 00 00 2.4.1 G DOLavatory Faucet
2.4.1 G DOWaterSense Label for Lavatory
Faucet
2.4.4 G DOElectric Water Coolers
2.4.4 G DOEnergy Star Label for Electric
Water Cooler
2.4.5 G DOEmergency Shower and
Eyewash
2.8 G DOWater Heaters
2.8.1.1Energy Star Label for Gas
Storage Water Heater
2.9 G DOPumps
3.8.1.1 G ROBackflow Prevention Assemblies
1.5.1 G ROWelding
3.8.1Plumbing System
SD-06 Test Reports
3.8 G ROTests, Flushing and Disinfection
3.8.1.1 G ROTest of Backflow Prevention
Assemblies SD-07 Certificates
1.3Materials and Equipment 2.1.1Bolts
SD-10 Operation and Maintenance Data
3.8.1 G ROPlumbing System
23 00 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 86 PAGES
23 00 00 1.4.3 G RODetail Drawings SD-03 Product Data
2.8.1.1 G DOMetallic Flexible Duct
2.8.1.2 G DOInsulated Nonmetallic Flexible
Duct Runouts
2.8.1.2 G DODuct Connectors
2.8.2 G RODuct Access Doors
2.8.3Fire Dampers
2.8.4 G ROManual Balancing Dampers
2.8.7.1 G RODiffusers
2.8.7.2 G RORegisters and Grilles
2.8.8 G ROLouvers
2.8.9 G DOPenthouses
2.9.1.1 G ROCentrifugal Fans
2.9.1.2 G DOIn-Line Centrifugal Fans
2.9.1.3 G DOCentrifugal Type Power Roof
Ventilators
2.9.1.4 G DOCeiling Exhaust Fans
2.9.1.4Energy Star label for ceiling exhaust fan product
1.4.4 G ROTest Procedures
2.8.1 G ROIndoor Air Quality for Duct
Sealants SD-06 Test Reports
3.11 G ROPerformance Tests
3.9 G RODamper Acceptance Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 86 PAGES
23 00 00 SD-08 Manufacturer’s Instructions
3.2 G ROManufacturer's Installation
Instructions
3.13.2 G ROOperation and Maintenance
Training SD-10 Operation and Maintenance Data
3.13.1 G ROOperation and Maintenance
Manuals
2.8.3 G ROFire Dampers
2.8.4 G ROManual Balancing Dampers
2.9.1.1 G ROCentrifugal Fans
2.9.1.2 G ROIn-Line Centrifugal Fans
2.9.1.4 G ROCeiling Exhaust Fans
23 05 93 SD-01 Preconstruction Submittals
1.5.3.1 G ROTAB Firm
1.2 G ROTAB Team Assistants
1.2 G ROTAB Team Engineer
1.5.3.2 G ROTAB Specialist
1.2 G ROTAB Team Field Leader
SD-02 Shop Drawings
1.3.3 G ROTAB Schematic Drawings and
Report Forms SD-03 Product Data
1.3 G ROEquipment and Performance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 86 PAGES
23 05 93 1.5.3.4 G ROTAB Related HVAC Submittals
1.5.2 G ROTAB Procedures
1.5.2 G ROCalibration
1.3.3 G ROSystems Readiness Check
1.5.4 G ROTAB Execution
1.5.4.3 G ROTAB Verification
SD-06 Test Reports
1.6.2.1 G ROTAB Design Review Report
SD-07 Certificates
1.5.1 G ROIndependent TAB Agency and
Personnel Qualifications
1.6.2 G ROTAB Submittal and Work
Schedule
1.6.2.2 G ROTAB Pre-Field Engineering
Report
1.5.3.1 G ROTAB Firm
1.3.3 G RODesign Review Report
23 07 00 SD-02 Shop Drawings
3.2.2.4 G ROMICA Plates
2.3 G ROPipe Insulation Systems
3.2 G ROPipe Insulation Systems
3.3 G RODuct Insulation Systems
3.4 G ROEquipment Insulation Systems
2.3.1 G RORecycled content for insulation
materials SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 86 PAGES
23 07 00 2.3 G ROPipe Insulation Systems
3.2 G ROPipe Insulation Systems
3.3 G RODuct Insulation Systems
3.4 G ROEquipment Insulation Systems
SD-04 Samples
2.2.1.3 G ROThermal Insulation
3.1.1 G RODisplay Samples
SD-07 Certificates 2.2.1Indoor air quality for adhesives
SD-08 Manufacturer’s Instructions
2.3 G ROPipe Insulation Systems
3.2 G ROPipe Insulation Systems
3.3 G RODuct Insulation Systems
3.4 G ROEquipment Insulation Systems
23 81 00.00 20 SD-02 Shop Drawings
2.3.2 G ROField-Assembled Refrigerant
Piping
1.3.2 G ROControl System Wiring Diagrams
SD-03 Product Data
2.1 G DOHeat Pumps
1.4 G RORefrigerant
2.3 G RORefrigerant Piping and
Accessories SD-06 Test Reports
2.5.1 G ROSalt-Spray Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEW…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .