This is a solicitation for a hydrant fuel system replacement project at Ellsworth Air Force Base in South Dakota. The project includes constructing an enclosed DoD Type III hydrant fueling pumphouse with a control room, installing two aboveground 10,000-barrel fuel storage tanks with containment structures, constructing a filter building, laying distribution piping to connect to an existing fuel loop, installing a new product recovery tank, extending a fuel transfer line, and performing associated site work. The solicitation was issued by the Department of the Army Corps of Engineers Omaha District. Responses are due by July 14, 2020.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Am #0003 - 1 (Continuation SF 30)

26 June 2020 Solicitation No. W9128F20R0056

Date of Issue: 11 JUN 2020 Date of Receiving Proposals: 14 JUL 2020

SUBJECT: Amendment No. 0003 to Request for Proposal Solicitation Package for specifications and drawings for Construction of HYRDANT FUEL SYSTEM REPLACEMENT, DESC1913, ELLSWORTH AFB, SOUTH DAKOTA

TO: Prospective Offerors and Others Concerned

1. The specifications and drawings for subject project are hereby modified as follows (revise all specification indices, attachment lists, and drawing indices accordingly).

a. Specifications. (Descriptive Changes.)

(1) Bidder Inquiries with Revised Information to Responses:

8648300 - The hydrant control valve will not be added to the drawings 8648705 - Drawing changed instead of the spec.

8648720 - Drawing changed instead of the spec.

8648735 - Drawing and spec changed.

8648784 – The piping is not going to change to 12 inches.

8649012 - FTP-1 will be an API 610 Vertical Turbine pump.

8660982 - Stainless steel piping will be used in the pumphouse and the hydrant loop piping. Carbon steel will be used everywhere else.

b. Specifications (New and/or Revised and Reissued). Delete and substitute or add specification pages or sections as noted below. The substituted pages or sections are revised and reissued with this amendment. For convenience, on the revised specification pages, changes have been identified by “*Am-3” (underlining of added text. Deleted text is not shown.

Pages or Sections Deleted Pages or Sections Substituted or Added Submittal Register Submittal Register 08 51 13 --- 08 51 23 08 51 23 33 52 43.11 33 52 43.11 33 52.43.13 33 52 43.13 33 52 43.14 33 52 43.14 33 52 43.23 33 52 43.23 33 52 43.28 33 52 43.28 33 52 80 33 52 80

c. Drawings (Reissued). The following drawings are revised with latest revision date of 26 June 2020, and reissued with this amendment.

GENERAL

G-003 INDEX - (2 OF 2)

SITE/CIVIL

CS103 SITE PLAN - AREA 3

CG501 GRADING AND DRAINAGE DETAILS - SHEET 1 OF 4

Am #0003 - 2

STRUCTURAL SITE

SS405 PRT PIPE SUPPORTS

MECHANICAL SITE

MS201 HYDRANT LOOP ISSUE PIPING PLANS AND PROFILES SHEET 1 OF 3

MS202 HYDRANT LOOP ISSUE PIPING PLANS AND PROFILES SHEET 2 OF 3

MS203 HYDRANT LOOP ISSUE PIPING PLANS AND PROFILES SHEET 3 OF 3

MS204 HYDRANT LOOP RETURN PIPING PLANS AND PROFILES SHEET 1 OF 4

MS205 HYDRANT LOOP RETURN PIPING PLANS AND PROFILES SHEET 2 OF 4

MS206 HYDRANT LOOP RETURN PIPING PLANS AND PROFILES SHEET 3 OF 4

MS207 HYDRANT LOOP RETURN PIPING PLANS AND PROFILES SHEET 4 OF 4

MS208 HHT ISSUE PIPING PLANS AND PROFILES

MS209 HHT RETURN PIPING PLANS AND PROFILES

MS210 PUMPHOUSE ISSUE PIPING PLANS AND PROFILES SHEET 1 OF 6

MS214 PUMPHOUSE ISSUE PIPING PLANS AND PROFILES SHEET 5 OF 6

MS215 PUMPHOUSE ISSUE PIPING PLANS AND PROFILES SHEET 6 OF 6

MS216 PUMPHOUSE RETURN PIPING PLANS AND PROFILES SHEET 1 OF 6

MS221 PUMPHOUSE RETURN PIPING PLANS AND PROFILES SHEET 6 OF 6

MS222 TANK 1 ISSUE PIPING PLANS AND PROFILES

MS223 TANK 1 RECEIPT PIPING PLANS AND PROFILES

MS225 TANK 2 RECEIPT PIPING PLANS AND PROFILES SHEET 2 OF 2

MS229 TRANSFER 1 PIPING PLANS AND PROFILES SHEET 4 OF 4

MS230 TRANSFER 2 PIPING PLANS AND PROFILES SHEET 1 OF 4

MS233 TRANSFER 2 PIPING PLANS AND PROFILES SHEET 4 OF 4

MS401 ISOLATION CONTAINMENT VAULT DETAIL

MS402 PIPING CONNECTION DETAIL SHEET 1 OF 3

MS502 MECHANICAL SITE DETAILS SHEET 2 OF 2

MS503 4,000 GALLON PRT DETAILS SHEET 1 OF 2

ELECTRICAL SITE

ES502 HAND HOLE DETAILS

PUMPHOUSE & FILTER BUILDING

STRUCTURAL

SB101 PUMPHOUSE FOUNDATION PLAN

SB302 FOUNDATION SECTIONS / SHEET 2

ARCHITECTURAL

A-101 PUMP HOUSE BUILDING - FLOOR PLAN

A-102 FILTER BUILDING - FLOOR PLAN

A-141 PUMP HOUSE BUILDING - ROOF PLANS AND REFLECTED CEILING PLAN

A-201 PUMP HOUSE BUILDING - BUILDING ELEVATIONS AND SECTION

A-202 FILTER BUILDING - BUILDING ELEVATIONS AND SECTION

A-401 WALL SECTIONS

A-402 WALL SECTIONS

A-501 ROOF DETAILS

A-502 ROOF DETAILS

A-601 PUMP HOUSE AND FILTER BUILDING - ROOM FINISH SCHEDULE AND DOOR SCHEDULE

A-701 DOOR, WINDOW, AND LOUVER DETAILS

A-702 WINDOW AND LOUVER DETAILS

MECHANICAL

M-101 PUMPHOUSE PIPING PLAN

M-102 FILTER BUILDING PIPING PLAN

M-201 FLOW DIAGRAM

M-202 ISOMETRIC DIAGRAM SHEET 1 OF 3

M-301 PUMPHOUSE SECTIONS SHEET 1 OF 3

Am #0003 - 3

M-501 MECHANICAL DETAILS SHEET 1 OF 3

M-502 MECHANICAL DETAILS SHEET 2 OF 3

M-503 MECHANICAL DETAILS SHEET 3 OF 3

M-504 500 GALLON PRT DETAILS

M-601 FUEL SYSTEM SCHEDULES

ELECTRICAL

EP601 ONE LINE DIAGRAM

EP606 SCHEDULE SHEET 2

d. Drawings (New). The following new drawing dated 26 June 2020 is hereby added to the contract drawings and are issued with this amendment.

PUMPHOUSE & FILTER BUILDING

STRUCTURAL

SB303 FOUNDATION SECTIONS / SHEET 3

2. This amendment is a part of the proposing papers and its receipt shall be acknowledged. All other conditions and requirements of the request for proposal remain unchanged.

3. Electronic Proposal/Email. Provide proposals Email to the following address:

Kenyanna.Jennings@usace.army.mil and

John.D.Hickman@usace.army.mil]

4. Electric Offers will be received until 2:00 p.m., local time at place of receiving proposals, 140 July 2020, as stated in the Request For Proposal.

Attachments:

Spec Pages listed in 1.b. above Dwgs. listed in 1.c. and 1.d. above (Under Separate Cover)

U.S. Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901

26 June 2020 drl/2181

This page was intentionally left blank for duplex printing.

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 86 PAGES

Hydrant Fuel System Replacement, Ellsworth AFB, SD

01 30 00.24 SD-02 Shop Drawings

1.29 G ROEquipment Room Drawings

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G ROProject Scheduler Qualifications

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 G ROSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.4.1 G ROSustainability Action Plan

1.5.1.1 G ROPreliminary Sustainability

eNotebook SD-11 Closeout Submittals

1.5.1.1 G ROFinal Sustainability eNotebook

1.5.1.1 G ROAmended Final Sustainability

eNotebook 01 35 26 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 G ROAccident Reports

1.12.3LHE Inspection Reports

SD-07 Certificates 1.6.1.4Crane Operators/Riggers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Am #0003

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 86 PAGES

01 35 26 1.7.2.2 G ROStandard Lift Plan

1.7.2.3 G ROCritical Lift Plan

1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates

01 41 26.01 24 SD-01 Preconstruction Submittals 3.2.1Notice of Intent 3.2.2Authorization Letter 3.2.4Storm Water Pollution Prevention

Plan 3.2.7Notice of Termination

SD-06 Test Reports 3.2.5Reports

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 G ROContractor Quality Control (CQC)

Plan SD-06 Test Reports

3.9Verification Statement 01 45 35 SD-01 Preconstruction Submittals

3.1.1 G DOSIOR Letter of Acceptance

3.1.1 G DOProject Manual

3.1.1 G DOProject Manual

3.1.1Written Practices 3.1.3Written Practices

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 86 PAGES

01 45 35 3.1.1NDT Procedures and Equipment Calibration Records

3.1.3NDT Procedures and Equipment Calibration Records

SD-06 Test Reports 3.1.1Daily Reports 3.1.3Daily Reports 3.1.3Daily Reports 3.1.1Biweekly Reports 3.1.2Biweekly Reports

SD-07 Certificates 2.1Fabrication Plant 2.1AC472 Accreditation 2.1Steel Joist Institute Membership 2.1Certificate of Compliance

1.5.17 G DOSpecial Inspector of Record

1.5 G DOSpecial Inspector

3.1.1Qualification Records 3.1.3Qualification Records

SD-11 Closeout Submittals 3.1.1Interim Final Report 3.1.3Interim Final Report

3.1.1 G DOComprehensive Final Report

3.1.3 G DOComprehensive Final Report

01 57 20.00 10 SD-01 Preconstruction Submittals

1.9 G ROEnvironmental Protection Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 86 PAGES

01 57 23 SD-07 Certificates 2.1.3Mill Certificate or Affidavit

01 74 19 SD-01 Preconstruction Submittals

1.7 G ROConstruction Waste Management

Plan SD-06 Test Reports

1.9.2Quarterly Reports 1.9.3Annual Report

SD-11 Closeout Submittals 1.10Final Construction Waste

Diversion Report 01 78 23 SD-10 Operation and Maintenance

Data

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

01 78 23.33 SD-10 Operation and Maintenance Data

2.1.1 G ROSystem Instructions

01 78 24.00 20 SD-11 Closeout Submittals

1.4.1 G ROeOMSI, Progress Submittal

1.4.2 G ROeOMSI, Prefinal Submittal

1.4.3 G ROeOMSI, Final Submittal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 86 PAGES

01 78 36.00 24 SD-11 Closeout Submittals 1.2.5Equipment Warranty Booklet

01 78 39.00 24 SD-03 Product Data

1.7.2 G DO50 Percent Preliminary As-Built

Drawings

1.7.3 G DO100 Percent Preliminary As-Built

Drawings SD-11 Closeout Submittals

1.7.4 G DOFinal As-Built Drawings

1.4.4 G ROLEED Documentation

02 41 00 SD-01 Preconstruction Submittals

1.2.2 G RODemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.6 G RONotification

03 30 00 SD-01 Preconstruction Submittals 1.6.3.1Concrete Curing Plan

1.6.5 G DOQuality Control Plan

1.6.6 G ROQuality Control Personnel

Certifications 1.6.6Quality Control Organizational

Chart

1.6.8 G DOLaboratory Accreditation

3.3.10Maturity Method Data

SD-02 Shop Drawings

1.6.2.1 G DOReinforcing Steel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 86 PAGES

03 30 00 SD-03 Product Data 2.4.5Joint Sealants 2.4.4Joint Filler 2.1Formwork Materials 2.3.3.2Recycled Aggregate Materials 2.3.1Cementitious Materials 2.4.6Vapor Retarder and Vapor

Barrier 2.4.1Concrete Curing Materials 2.6Reinforcement 2.4.3.1Liquid Chemical Floor Hardeners and Sealers 2.3.4Admixtures 2.6.2Mechanical Reinforcing Bar

Connectors 2.2.2Waterstops 2.2.3Biodegradable Form Release

Agent 1.6.3.2Pumping Concrete 2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.1 G DOConcrete Mix Design

SD-06 Test Reports

1.6.1.1 G DOConcrete Mix Design

1.6.4.1Fly Ash 1.6.4.1Pozzolan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 86 PAGES

03 30 00 1.6.4.2Slag Cement 1.6.4.3Aggregates

3.13.2.3 G DOCompressive Strength Tests

3.13.2.4Air Content 3.13.2.1Slump Tests 2.3.2Water

SD-07 Certificates 2.6.1Reinforcing Bars 1.6.3.3VOC Content for Form Release

Agents, Curing Compounds, and Concrete Penetrating Sealers

1.6.3.4Safety Data Sheets 1.8.1Forest Stewardship Council

(FSC) Certification 1.6.6.2Field Testing Technician and

Testing Agency SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5Joint Sealants 2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.3.2.1 G ROCut CMU

3.4.1.1 G DODetail Drawings

SD-03 Product Data

1.5.1 G ROHot Weather Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 86 PAGES

04 20 00 1.5.2 G ROCold Weather Procedures

2.2.2.2.1 G DOCement

2.4.1.1 G DOCementitious Materials

SD-04 Samples

2.2.2.2 G ROConcrete Masonry Units (CMU)

2.4.1.4 G DOAdmixtures for Masonry Mortar

2.6.2 G ROAnchors, Ties, and Bar

Positioners

2.6.3 G ROJoint Reinforcement

SD-05 Design Data

2.1.2 G DOMasonry Compressive Strength

2.2.2.4Fire-Rated Concrete Masonry

Units

3.2.5 G ROBracing Calculations

SD-06 Test Reports 2.2.2.4Fire-Rated Concrete Masonry

Units 3.6.1.1Field Testing of Mortar 3.6.1.2Field Testing of Grout 3.6.1.3Single-Wythe Masonry Wall

Water Penetration Test SD-07 Certificates

1.3.1Special Masonry Inspector Qualifications

2.2.2.2Concrete Masonry Units (CMU) 2.4.1.1Cementitious Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 86 PAGES

04 20 00 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout 2.6.2Anchors, Ties, and Bar

Positioners 2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions 2.4.1.4Admixtures for Masonry Mortar 2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance Data

3.8Take-Back Program SD-11 Closeout Submittals

2.2.2.2.2Recycled Content 05 05 23.16 SD-01 Preconstruction Submittals

3.2Welding Quality Assurance Plan SD-03 Product Data

1.3 G ROWelding Procedure Qualifications

1.3.5Welder, Welding Operator, and

Tacker Qualification 1.3.6Inspector Qualification 1.3.2Previous Qualifications 1.3.3Pre-Qualified Procedures 2.2Welding Electrodes and Rods

SD-06 Test Reports 3.3Nondestructive Testing

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 86 PAGES

05 05 23.16 1.3.1Certified Welding Procedure Specifications (WPS)

1.3.1Certified Brazing Procedure Specifications (BPS)

1.3.1Certified Procedure Qualification Records (PQR)

1.3.1Certified Welder Performance Qualifications (WPQ)

1.3.1Certified Brazer Performance Qualifications (BPQ)

05 12 00 SD-01 Preconstruction Submittals

1.3.1.1 G ROErection Drawings

SD-02 Shop Drawings

1.3.2 G DOFabrication Drawings

SD-03 Product Data

2.6.2 G ROShop Primer

2.4.1 G ROWelding Electrodes and Rods

2.3.2.3 G RODirect Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.3 G ROTension Control Bolts

SD-06 Test Reports 2.6.2Class B Coating

2.3 G ROBolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports 3.7.2.1Direct Tension Indicator Washer

Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 86 PAGES

05 12 00 3.7.3.1Bolt Testing Reports 3.7.4Embrittlement Test Reports

SD-07 Certificates

2.2 G ROSteel

2.3 G ROBolts, Nuts, and Washers

2.5 G ROGalvanizing

1.3.3.1Welding Procedures and

Qualifications 2.4.1Welding Electrodes and Rods

05 21 00 SD-01 Preconstruction Submittals 1.3.2Welder Qualification

SD-02 Shop Drawings

1.3.1 G DOSteel Joist Framing

SD-05 Design Data

2.2 G DODesign Calculations

SD-06 Test Reports 3.4Erection Inspection 3.4Welding Inspections

SD-07 Certificates 1.3.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

1.3.4 G DOFabrication Drawings

SD-03 Product Data

2.2 G DOAccessories

2.1Deck Units 2.1.4Touch-Up Paint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 86 PAGES

05 30 00 1.3.2Welding Equipment 1.3.2Welding Rods and Accessories

SD-05 Design Data

2.1 G DODeck Units

SD-07 Certificates 1.3.2Welder Qualifications 1.3.2Welding Procedures 1.3.3.1Fire Safety 1.3.1Manufacturer's Certificate

SD-11 Closeout Submittals 2.1Recycled Content of Steel

Products 05 40 00 SD-02 Shop Drawings

1.6.1 G DOFraming Components

SD-03 Product Data

2.1Studs, Joists 2.1Recycled Content of Steel

Products SD-05 Design Data

1.6.2 G DOMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal Framing

3.2.1Welds 05 50 13 SD-02 Shop Drawings

2.4 G DOFloor Gratings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 86 PAGES

05 50 13 2.5 G DOBollards/Pipe Guards

2.6 G DOAngles and Plates

2.8 G DODouble Leaf Valve Vault Doors

2.9 G DOPipe Supports

SD-03 Product Data

2.4 G DOFloor Gratings

2.8 G DODouble Leaf Valve Vault Doors

SD-07 Certificates

2.1 G DOCertificates of Compliance

2.2 G DOCertified Mill

SD-11 Closeout Submittals 2.1Recycled Content

05 51 00 SD-02 Shop Drawings

2.1 G DOIron and Steel Hardware

2.1 G DOSteel Shapes, Plates, Bars, and

Strips

2.2.1 G DOMetal Stair System

SD-03 Product Data

2.4.1 G DOStructural-Steel Plates, Shapes, and Bars

2.4.2 G DOStructural-Steel Tubing

2.4.5 G DOHot-Rolled Carbon Steel Sheets

and Strips

2.4.4 G DOCold-Finished Steel Bars

2.4.3 G DOHot-Rolled Carbon Steel Bars

2.4.6 G DOCold-Rolled Carbon Steel Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 86 PAGES

05 51 00 2.4.7 G DOGalvanized Carbon Steel Sheets

2.4.8 G DOCold-Drawn Steel Tubing

2.2.3 G DOProtective Coating

2.3.1 G DOSteel Stairs

SD-08 Manufacturer’s Instructions

2.4.1 G DOStructural-Steel Plates, Shapes, and Bars

2.4.2 G DOStructural-Steel Tubing

2.4.5 G DOHot-Rolled Carbon Steel Sheets

and Strips

2.4.4 G DOCold-Finished Steel Bars

2.4.3 G DOHot-Rolled Carbon Steel Bars

2.4.6 G DOCold-Rolled Carbon Steel Sheets

2.4.7 G DOGalvanized Carbon Steel Sheets

2.4.8 G DOCold-Drawn Steel Tubing

2.2.3 G DOProtective Coating

05 51 33 SD-02 Shop Drawings 2.3Ladders

SD-03 Product Data 2.3Ladders 2.3.1Ladder Safety Devices

SD-07 Certificates 1.3Fabricator Certification for Ladder

Assembly 05 52 00 SD-02 Shop Drawings

1.2.1 G DOFabrication Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 86 PAGES

05 52 00 3.2Iron and Steel Hardware 3.2Steel Shapes, Plates, Bars and

Strips SD-03 Product Data

2.2.1Structural Steel Plates, Shapes, and Bars

2.2.2Structural Steel Tubing 2.2.3Hot-Rolled Carbon Steel Bars 2.1.2Protective Coating 2.2.6Steel Railings and Handrails 1.2.1Anchorage and Fastening

Systems SD-08 Manufacturer’s Instructions

3.2Installation Instructions 06 10 00 SD-02 Shop Drawings

3.2.1 G RONailers

3.2.1.1 G ROStrips

SD-03 Product Data 1.8Fire-retardant treatment

SD-06 Test Reports 1.4.3Preservative-treated

SD-07 Certificates 1.9.1Certificates of grade 1.7Preservative treatment

SD-11 Closeout Submittals 2.3.2Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 86 PAGES

07 21 13 SD-03 Product Data

2.1 G DOBlock or board insulation

2.2Vapor retarder 2.3Pressure sensitive tape 2.4Protection board or coating 2.5Accessories

SD-08 Manufacturer’s Instructions 2.1Block or Board Insulation 2.5.1Adhesive

07 22 00 SD-02 Shop Drawings 2.5Wood nailers

SD-03 Product Data

2.4 G ROFasteners

2.1 G ROInsulation

1.4.2Certification 2.1.3Recycled materials 1.4.3Local/Regional Materials

SD-06 Test Reports 1.4.1Flame spread and smoke developed ratings SD-07 Certificates

1.3qualifications SD-08 Manufacturer’s Instructions

2.4fasteners 2.1insulation

07 52 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 86 PAGES

07 52 00 1.4.7 G DORoof plan SD-03 Product Data

2.1 G DOModified Bitumen Sheets

3.3.3.1 G DOCold Adhesive Applied Modified

Bitumen Membrane

2.3 G ROCold-Applied Membrane

Adhesive

2.1 G ROFiberglass Felt

2.5 G ROPrimer

2.6 G ROModified Bitumen Roof Cement

2.8Pre-Manufactured Accessories

2.7 G DOFasteners And Plates

1.8 G ROWarranty

SD-05 Design Data

1.4.6 G DOWind Uplift Calculations

SD-07 Certificates 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator 1.4.4Qualification of Engineer of

Record

1.4.6 G DOWind Uplift Resistance

1.4.5 G ROFire Resistance

SD-08 Manufacturer’s Instructions

3.3.6 G DOModified Bitumen Membrane

Application

3.3.7 G DOFlashing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 86 PAGES

07 52 00 2.5Primer 2.7.1Fasteners 3.3.4Ventilating Base Sheets

3.3.8.1 G ROCoating Application

1.6 G ROCold Weather Installation

SD-11 Closeout Submittals 1.8Warranty 3.8Information Card 3.7Instructions To Government

Personnel 07 60 00 SD-02 Shop Drawings

2.2.1 G ROExposed Sheet Metal

3.1.14 G ROGutters

3.1.15 G RODownspouts

2.2.1 G ROGravel Stops and Fasciae

3.1.10 G ROBase Flashing

3.1.11 G ROCounterflashing

3.1.18 G ROFlashing at Roof Penetrations

and Equipment Supports

3.1.13 G RODrip Edges

3.1.16 G ROEave Flashing

3.1.17 G ROExpansion Joints

SD-04 Samples

1.4.2 G ROFinish Samples

SD-07 Certificates

2.1 G ROCertificates of Compliance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 86 PAGES

07 60 00 2.1 G RORecycled Content SD-08 Manufacturer’s Instructions

1.4.3 G ROInstructions for Installation

3.5 G ROQuality Control Plan

SD-10 Operation and Maintenance Data

1.4.3 G ROCleaning and Maintenance

07 61 14.00 20 SD-02 Shop Drawings

1.2.4 G DORoofing

SD-03 Product Data

2.1 G DORoofing panels

2.3Attachment clips 2.4.1Closures 2.4Accessories 2.4.2Fasteners 2.4.3Sealants

1.7 G DOwarranty

SD-04 Samples 2.1panel 2.4Accessories 2.4.3Sealants 2.2Intermediate Support

SD-05 Design Data 1.5Design calculations

SD-06 Test Reports

3.6 G ROField Inspection

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 86 PAGES

07 61 14.00 20 1.3.3Structural performance 1.6.6Finish

SD-07 Certificates 1.6.3Manufacturer's Technical

Representative 1.6.4Installer's Qualifications

2.1 G ROCoil stock

SD-08 Manufacturer’s Instructions

3.3 G ROInstallation

07 84 00 SD-02 Shop Drawings 2.1Firestopping Materials

SD-07 Certificates 2.1Firestopping Materials 1.4Installer Qualifications 3.3Inspection

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates 3.3.6Sealant

08 11 13 SD-02 Shop Drawings

2.1 G RODoors

2.1 G RODoors

2.5 G ROFrames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 86 PAGES

08 11 13 2.5 G ROFrames 2.3Accessories 2.6Weatherstripping

SD-03 Product Data

2.1 G RODoors

2.5 G ROFrames

2.3Accessories 2.6Weatherstripping

08 51 23 SD-02 Shop Drawings 2.2Windows

SD-03 Product Data 2.2Windows 2.6.5Fasteners 2.1Materials 2.6Accessories

SD-04 Samples

2.7.2 G ROColor coating

2.2Windows

SD-06 Test Reports 1.3.1Air infiltration 1.3.1Water infiltration

2.3 G ROFire Rating

SD-10 Operation and Maintenance Data

2.2 G ROWindows

08 71 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 86 PAGES

08 71 00 1.3 G ROHardware schedule 2.3.5Keying system

SD-03 Product Data

2.3 G DOHardware items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-10 Operation and Maintenance Data

1.3 G ROHardware Schedule

SD-11 Closeout Submittals

1.4Key Bitting 08 81 00 SD-02 Shop Drawings

3.2.2Installation SD-03 Product Data

1.6.1Insulating Glass 1.3Glazing Accessories

SD-04 Samples 1.6.1Insulating Glass 2.3.5Tape 2.3.2.1Sealant

SD-07 Certificates 1.6.1Insulating Glass 1.3Glazing Accessories

SD-08 Manufacturer’s Instructions 2.3Setting and Sealing Materials 3.2Glass Setting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 86 PAGES

08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers

SD-03 Product Data 2.2Metal Wall Louvers

SD-04 Samples

1.4 G ROWall louvers

1.5 G ROWall louvers

09 22 00 SD-02 Shop Drawings

2.1 G ROMetal support systems

09 29 00 SD-03 Product Data 2.1.5Accessories 2.1.2Joint Treatment Materials

SD-07 Certificates

2.1 G ROAsbestos Free Materials

SD-08 Manufacturer’s Instructions 2.1Material Safety Data Sheets

SD-10 Operation and Maintenance Data

2.1Manufacturer maintenance instructions

3.8Waste Management SD-11 Closeout Submittals

2.1.1Gypsum Board 2.1.4Adhesives

09 51 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 86 PAGES

09 51 00 1.2 G ROApproved Detail Drawings SD-03 Product Data

1.2 G ROAcoustical Ceiling Systems

1.4Certification

SD-04 Samples

2.1 G ROAcoustical Units

2.1.1 G ROAcoustic Ceiling Tiles

SD-06 Test Reports

1.2.1 G ROCeiling Attenuation Class and

Test SD-07 Certificates

2.1 G ROAcoustical Units

2.1.1 G ROAcoustic Ceiling Tiles

09 65 00 SD-02 Shop Drawings

2.8 G DOResilient Flooring and

Accessories

2.1 G DOLuxury Vinyl Tile

SD-03 Product Data

2.8 G DOResilient Flooring and

Accessories 2.4Adhesives

2.1 G DOLuxury Vinyl Tile

2.2 G DOWall Base

SD-04 Samples

2.8 G DOResilient Flooring and

Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 86 PAGES

09 65 00 2.1 G DOLuxury Vinyl Tile

2.2 G DOWall Base

SD-06 Test Reports

3.3 G ROMoisture, Alkalinity and Bond

Tests SD-08 Manufacturer’s Instructions

3.2Surface Preparation 3.1Installation

SD-10 Operation and Maintenance Data

2.8Resilient Flooring and Accessories

SD-11 Closeout Submittals 1.3LEED Documentation

09 90 00 SD-02 Shop Drawings

3.8 G ROPiping identification

3.8stencil

SD-03 Product Data 2.1Materials 1.4.2Certification

2.1 G ROCoating

2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.9 G ROColor

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 86 PAGES

09 90 00 1.3Applicator's qualifications

1.4.1.2 G ROQualification Testing

SD-08 Manufacturer’s Instructions 3.5.1Application instructions 3.5.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1 G ROCoatings:

09 97 13.17 SD-05 Design Data

1.4.4.1Environmental Control System

1.4.4.2 G DOUse of Door Sheet Access Way

SD-06 Test Reports 1.4.5.1Metallic Abrasive Qualification

Test Reports 3.2.3Coating Sample Test Reports 3.2.4Abrasive Sample Test Reports 3.10.2.2Inspection Report Forms 3.10.2.3Daily Inspection Reports 1.4.5.2Recycled Metallic Abrasive Field

Test Reports (Daily and Weekly) SD-07 Certificates

1.4.1Contract Errors, Omissions, and Other Discrepancies

1.4.2.1Corrective Action Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 86 PAGES

09 97 13.17 1.4.3Coating Work Plan 1.4.6.1Qualifications of Certified

Industrial Hygienist (CIH) 1.4.6.5Qualifications Of Individuals

Performing Abrasive Blasting 1.4.6.2Qualifications of Certified

Protective Coatings Specialist

(PCS)

1.4.6.3Qualifications of Coating Inspection Company

1.4.6.4Qualifications of QC Specialist Coating Inspector

1.4.6.6Qualifications of Testing Laboratory for Coatings

1.4.6.7Qualifications of Testing Laboratory for Abrasive

1.4.6.8Qualifications of Coating Contractors

1.4.6.9Roof Joint Sealant Materials 1.4.6.10Roof Joint Sealant Compatibility 1.4.6.11Epoxy Coating Materials 1.4.6.12Non-metallic Abrasive 1.4.6.13Metallic Abrasive

SD-08 Manufacturer’s Instructions 1.5.1Roof Joint Sealant Instructions 1.5.2Coating System Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 86 PAGES

09 97 13.17 SD-11 Closeout Submittals

3.7.6 G RODisposal of Used Abrasive

3.10.2.4 G ROInspection Logbook

09 97 13.27 SD-05 Design Data 1.4.4.1Containment System

SD-06 Test Reports 1.4.5.1Joint Sealant Qualification Test

Reports 1.4.5.2Coatings Qualification Test

Reports 1.4.5.3Metallic Abrasive Qualification

Test Reports 3.1.3Coating Sample Test Reports 3.1.4Abrasive Sample Test Reports 3.8.2.2Inspection Report Forms 3.8.2.3Daily Inspection Reports 1.4.5.4Recycled Metallic Abrasive Field

Test Reports (Daily and Weekly) SD-07 Certificates

1.4.1Contract Errors, Omissions, and Other Discrepancies

1.4.2.1Corrective Action Procedures 1.4.3Coating Work Plan 1.4.6.1Qualifications of Certified

Industrial Hygienist (CIH)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 86 PAGES

09 97 13.27 1.4.6.5Qualifications Of Individuals Performing Abrasive Blasting

1.4.6.2Qualifications of Certified Protective Coatings Specialist

(PCS)

1.4.6.3Qualifications of Coating Inspection Company

1.4.6.4Qualifications of QC Specialist Coating Inspector

1.4.6.6Qualifications of Testing Laboratory for Coatings

1.4.6.7Qualifications of Testing Laboratory for Abrasive

1.4.6.8Qualifications of Coating Contractors

1.4.6.9Joint Sealant Materials 1.4.6.10Coating Materials 1.4.6.11Coating System Component

Compatibility 1.4.6.12Non-metallic Abrasive 1.4.6.13Metallic Abrasive

SD-08 Manufacturer’s Instructions 1.5.1Joint Sealant Instructions 1.5.2Coating System Instructions

SD-11 Closeout Submittals 3.5.6Disposal of Used Abrasive

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 86 PAGES

09 97 13.27 3.8.2.4Inspection Logbook 10 44 16 SD-01 Preconstruction Submittals

2.1 G ROManufacturer's Data

SD-02 Shop Drawings

2.1 G ROFire Extinguishers

1.3.1Accessories Part 2 G ROCabinets

SD-03 Product Data 2.1Fire Extinguishers 1.3.1Accessories Part 2Cabinets 3.2.1Replacement Parts

SD-04 Samples 1.3.1Fire Extinguisher 1.3.1Cabinet 1.3.1Accessories

SD-07 Certificates 2.1Fire Extinguishers 2.1Manufacturer's Warranty with

Inspection Tag 13 34 19 SD-01 Preconstruction Submittals

1.6.3 G DOManufacturer's Qualifications

SD-02 Shop Drawings

1.6.1 G DODetail Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 86 PAGES

13 34 19 G DOsustainable acquisition compliance

1.6.1 G DOManufacturer's catalog data

SD-04 Samples

1.6.1 G ROCoil Stock

2.1.8 G ROCoil Stock

1.2.1.9 G RORoof Panels

1.2.1.9 G ROWall Panels

2.5.2 G DOFasteners

2.8.1 G ROMetal Closure Strips

1.4.7 G ROInsulation

2.4.2 G ROInsulation

1.6.10 G ROVapor Barrier

2.4.3 G DOManufacturer's color charts and

chips SD-05 Design Data

1.6.1 G DOdescriptive and technical

literature

1.6.1 G DObuilding design analysis

SD-06 Test Reports

1.6.1 G DOtest reports

1.6.1 G DOCoatings and base metals

1.6.1 G DOFactory Color Finish Performance

Requirements SD-07 Certificates

1.6.1 G ROsystem components

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 86 PAGES

13 34 19 1.6.1 G ROCoil Stock

2.1.8 G ROCoil Stock

1.6.1 G ROAluminized Steel Repair Paint

1.6.1 G ROGalvanizing Repair Paint

1.6.1 G ROEnamel Repair Paint

1.6.1 G DOQualification of Manufacturer

1.6.1 G DOQualification of Erector

SD-08 Manufacturer’s Instructions

1.6.2 G DOInstallation of Roof and Wall

panels

1.7 G ROshipping, handling, and storage

SD-11 Closeout Submittals

3.14.1 G ROManufacturer's Warranty

3.14.2 G ROContractor's Warranty for

Installation 22 00 00 SD-02 Shop Drawings

3.8.1 G ROPlumbing System

SD-03 Product Data

2.1 G RORecycled Content for Steel Pipe

2.1 G RORecycled Content for Cast Iron

Pipe

2.4 G DOFixtures

2.4.2 G DOFlush Valve Water Closets

2.4.2 G DOWaterSense Label for Flush

Valve Water Closet

2.4.3 G DOCountertop Lavatories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 86 PAGES

22 00 00 2.4.1 G DOLavatory Faucet

2.4.1 G DOWaterSense Label for Lavatory

Faucet

2.4.4 G DOElectric Water Coolers

2.4.4 G DOEnergy Star Label for Electric

Water Cooler

2.4.5 G DOEmergency Shower and

Eyewash

2.8 G DOWater Heaters

2.8.1.1Energy Star Label for Gas

Storage Water Heater

2.9 G DOPumps

3.8.1.1 G ROBackflow Prevention Assemblies

1.5.1 G ROWelding

3.8.1Plumbing System

SD-06 Test Reports

3.8 G ROTests, Flushing and Disinfection

3.8.1.1 G ROTest of Backflow Prevention

Assemblies SD-07 Certificates

1.3Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

3.8.1 G ROPlumbing System

23 00 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 86 PAGES

23 00 00 1.4.3 G RODetail Drawings SD-03 Product Data

2.8.1.1 G DOMetallic Flexible Duct

2.8.1.2 G DOInsulated Nonmetallic Flexible

Duct Runouts

2.8.1.2 G DODuct Connectors

2.8.2 G RODuct Access Doors

2.8.3Fire Dampers

2.8.4 G ROManual Balancing Dampers

2.8.7.1 G RODiffusers

2.8.7.2 G RORegisters and Grilles

2.8.8 G ROLouvers

2.8.9 G DOPenthouses

2.9.1.1 G ROCentrifugal Fans

2.9.1.2 G DOIn-Line Centrifugal Fans

2.9.1.3 G DOCentrifugal Type Power Roof

Ventilators

2.9.1.4 G DOCeiling Exhaust Fans

2.9.1.4Energy Star label for ceiling exhaust fan product

1.4.4 G ROTest Procedures

2.8.1 G ROIndoor Air Quality for Duct

Sealants SD-06 Test Reports

3.11 G ROPerformance Tests

3.9 G RODamper Acceptance Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 86 PAGES

23 00 00 SD-08 Manufacturer’s Instructions

3.2 G ROManufacturer's Installation

Instructions

3.13.2 G ROOperation and Maintenance

Training SD-10 Operation and Maintenance Data

3.13.1 G ROOperation and Maintenance

Manuals

2.8.3 G ROFire Dampers

2.8.4 G ROManual Balancing Dampers

2.9.1.1 G ROCentrifugal Fans

2.9.1.2 G ROIn-Line Centrifugal Fans

2.9.1.4 G ROCeiling Exhaust Fans

23 05 93 SD-01 Preconstruction Submittals

1.5.3.1 G ROTAB Firm

1.2 G ROTAB Team Assistants

1.2 G ROTAB Team Engineer

1.5.3.2 G ROTAB Specialist

1.2 G ROTAB Team Field Leader

SD-02 Shop Drawings

1.3.3 G ROTAB Schematic Drawings and

Report Forms SD-03 Product Data

1.3 G ROEquipment and Performance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 86 PAGES

23 05 93 1.5.3.4 G ROTAB Related HVAC Submittals

1.5.2 G ROTAB Procedures

1.5.2 G ROCalibration

1.3.3 G ROSystems Readiness Check

1.5.4 G ROTAB Execution

1.5.4.3 G ROTAB Verification

SD-06 Test Reports

1.6.2.1 G ROTAB Design Review Report

SD-07 Certificates

1.5.1 G ROIndependent TAB Agency and

Personnel Qualifications

1.6.2 G ROTAB Submittal and Work

Schedule

1.6.2.2 G ROTAB Pre-Field Engineering

Report

1.5.3.1 G ROTAB Firm

1.3.3 G RODesign Review Report

23 07 00 SD-02 Shop Drawings

3.2.2.4 G ROMICA Plates

2.3 G ROPipe Insulation Systems

3.2 G ROPipe Insulation Systems

3.3 G RODuct Insulation Systems

3.4 G ROEquipment Insulation Systems

2.3.1 G RORecycled content for insulation

materials SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 86 PAGES

23 07 00 2.3 G ROPipe Insulation Systems

3.2 G ROPipe Insulation Systems

3.3 G RODuct Insulation Systems

3.4 G ROEquipment Insulation Systems

SD-04 Samples

2.2.1.3 G ROThermal Insulation

3.1.1 G RODisplay Samples

SD-07 Certificates 2.2.1Indoor air quality for adhesives

SD-08 Manufacturer’s Instructions

2.3 G ROPipe Insulation Systems

3.2 G ROPipe Insulation Systems

3.3 G RODuct Insulation Systems

3.4 G ROEquipment Insulation Systems

23 81 00.00 20 SD-02 Shop Drawings

2.3.2 G ROField-Assembled Refrigerant

Piping

1.3.2 G ROControl System Wiring Diagrams

SD-03 Product Data

2.1 G DOHeat Pumps

1.4 G RORefrigerant

2.3 G RORefrigerant Piping and

Accessories SD-06 Test Reports

2.5.1 G ROSalt-Spray Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEW…