Electric Charging Facility Software and Hardware
Closed Pre-Solicitation Posted
- Solicitation number
- ACQR6091079
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- Not on record
- PSC
- Not on record
- Place of performance
- United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Facilities Engineering Command is conducting market research for a comprehensive electric vehicle charging facility (EVCF) solution for its government-operated vehicle (GOV) non-tactical fleet. The procurement seeks both software and hardware components for Level 2 and Level 3 charging stations at Navy installations across the United States. Technical requirements include cloud-based software with web-based tracking, fleet card integration, scheduling capabilities, and robust cybersecurity measures such as FedRAMP Moderate authorization and zero-trust network architecture. Hardware specifications mandate charging stations with minimum power outputs of 7kW for Level 2 and 50kW for Level 3, dual connectors, and compatibility with SAE standards. Interested vendors must submit detailed responses electronically to Dyanne Van Der Kamp by February 25, 2025, at 14:00 Pacific time, with submissions limited to 10 pages.
The pre-solicitation notice indicates no specific set-aside designations for this procurement, suggesting the opportunity is open to all qualified vendors. While no incumbent contractors are named, the Navy emphasizes this is strictly a market research initiative and will not result in an immediate contract award. The solicitation requires vendors to provide 24/7 help desk support, nationwide maintenance services, and hardware with at least a one-year warranty. Vendors must demonstrate ability to integrate with existing fleet management systems like WEX and Voyager, and comply with communication standards including OCPP 2.0.1 and ISO 15118. Although specific budget ranges are not disclosed, the comprehensive technical requirements suggest a potentially significant investment in modernizing the Navy's electric vehicle charging infrastructure across multiple installations.
Notice text
The Navy is interest in a financially viable solution for electric vehicle charging faclities at navy installations in the United States. Provide written responses electronically to Dyanne Van Der Kamp at dyanne.vanderkamp.civ@us.navy.mil no later than 14:00 Pacific on 25 February 2025.
Files
| File | Type | Posted |
|---|---|---|
| EV Charging Facility Hardware.pdf | ||
| EV Charging Facility Software.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Charger, battery, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| Analyzer-charger, BA | Naval Supply Systems Command | No set-aside | |
| Power supply | Naval Supply Systems Command | No set-aside | |
| RESEARCH AND DEVELOPMENT OF NAVAL POWER AND ENERGY SYSTEMS (N00024-19-R-4145 Broad Agency Announcement (BAA)) | Naval Sea Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity