(EAR048) Repair Fire Alarm System Eareckson Air Station Facilities
Open Special Notice Posted
- Solicitation number
- W911KB27RWP12
- Agency
-
ENDIST Alaska
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Eareckson As, Alaska 99506, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Alaska District, issued a Request for Information seeking market intelligence for site-wide repair and replacement of fire alarm systems at Eareckson Air Station, Shemya Island, Alaska, with responses due November 16, 2026, at 14:00 Alaska Time. The notice uses no set-aside and is not a solicitation; no solicitation is currently available, participation is voluntary, the Government will not reimburse response costs, and submission does not obligate an award.
The project will replace aging, non-compliant systems to meet UFC 3-600-01, NFPA 72, and life-safety requirements. The Government is pursuing a wireless or hybrid wireless architecture to reduce or eliminate buried fiber optic infrastructure. Scope includes demolition of existing panels, initiating devices, notification appliances, conduit, and wiring, followed by installation of the new system across affected buildings.
The attached draft Market Research Questionnaire, dated 23 October 2026, requests industry input on delivery method and contracting vehicle. It cites a target budget of $27 million to $33 million under Sustainment, Restoration, and Modernization funding, with design starting in FY27, construction starting in FY28, and completion no later than FY30. It evaluates Accelerated Design-Build to Budget, Construction Manager at Risk under OTA, and Progressive Design-Build under OTA.
Responses are submitted via online form or email to MAJ Quentin Sica and Theresa Afrank. The notice cites NAICS 236220 and a $45 million small business size standard for market research only, and lists PSC Y1JZ.
Notice text
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE
Notice: This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future.
NAICS Code: 236220 – Commercial and Institutional Building Construction
(Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.)
Small Business Size Standard: $45 Million
PROJECT OVERVIEW
The U.S. Army Corps of Engineers (USACE), Alaska District, has a requirement for the site-wide repair and replacement of fire alarm systems at Eareckson Air Station (Shemya Island, Alaska). The project will replace aging and non-compliant fire alarm systems across multiple facilities to meet current UFC 3-600-01, NFPA 72, and life-safety requirements. Existing systems are outdated or non-functional, creating risk to personnel and mission on this remote installation.
The Government is now pursuing a wireless (or hybrid wireless) fire alarm architecture that significantly reduces or eliminates the need for extensive buried fiber optic infrastructure, thereby addressing the primary cost driver while achieving full code compliance.
Key project components include:
• Demolition of existing fire alarm control panels, initiating devices, notification appliances, conduit, and wiring across affected buildings
• Installation of a new wireless/hybrid addressable fire alarm system, including wireless devices, gateways/repeaters for campus-wide RF coverage, limited residual hard-wired elements only where essential, and integration with supervisory/monitoring capabilities
• RF coverage analysis, specialty detection in hazardous (Class I) locations associated with fuel systems, cybersecurity compliance, multi-shift training, testing, commissioning, and phased turnover
• Phased execution by building or geographic area to accommodate remote-island logistics and minimize operational impact
Estimated Acquisition Magnitude: Between $27M and $33M
Planned Acquisition Strategy: Anticipated to utilize Progressive Design Build via Other Transaction Authority (OTA)
The Alaska District is conducting market intelligence to assess industry capability and interest in supporting this effort utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 U.S.C. § 4021 and 4022. This authority is intended for military construction and repair projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The anticipated delivery method is Progressive Design-Build.
Design and Pre-Construction Services - The OT Awardee shall assist the Government collaboratively in advancing the wireless/hybrid fire alarm design, performing RF coverage analysis and site investigations, supporting the UFC waiver process, validating and refining project requirements, and developing progressively more detailed open-book cost and schedule information. Design is expected to advance from approximately 0–15% at award to an agreed interim milestone (target approximately 65%) sufficient for reliable Guaranteed Maximum Price (GMP) development.
Final Design and Construction - Upon reaching an agreed-upon level of design, the Awardee will propose a Guaranteed Maximum Price (GMP) or Firm-Fixed-Price for final design and construction. If the price is accepted and required funding/approvals (including UFC waiver status) are in place, the Government will authorize Phase 2 execution via modification. Construction is expected to be authorized in staggered packages by building or geographic area to allow early turnover of priority facilities. If a fair and reasonable price cannot be agreed upon, or if other conditions prevent proceeding, the Government retains an “off-ramp” to complete the project via alternative methods while retaining rights to the design developed during Phase 1.
SUBMISSION INSTRUCTIONS:
Please submit your responses to the attached Market Research Intelligence Questionnaire no later than 16 November 2026 at 14:00 Alaska Time (AKT) using one of the following methods:
Preferred Method: Complete the questionnaire via the Microsoft Forms link:
https://forms.osi.apps.mil/r/DgMYxp3wcZ
Alternative Method: Email your completed questionnaire to both of the following individuals:
- MAJ Quentin Sica at Quentin.Sica@usace.army.mil
- Theresa Afrank at Theresa.M.Afrank@usace.army.mil
Any questions regarding this RFI should be directed to MAJ Quentin Sica or Theresa Afrank using the email addresses above.
Disclaimer: This RFI is for market intelligence purposes only. The Government reserves the right to use information received for any purpose and does not commit to issuing a solicitation or awarding an agreement as a result of this notice.
Files
| File | Type | Posted |
|---|---|---|
| Market Research Questionnaire EAR048 Draft 23OCT26.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| SACN Replace Fire Alarms and Intrusions Systems | — | Total Small Business | |
| Market Intelligence Questionnaire JBR041 – Pallet Processing Facility/JBR044 – Rapid Deployment Facility | Department of Defense | No set-aside | |
| Market Intelligence for EIE483 and EIE484 | ENDIST Alaska | No set-aside | |
| Z1DA--Upgrade Fire Alarm System Construction 676-22-110 | Veterans Integrated Service Network 12 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity