Dry-dock: USCG STA NOYO RIVER (47271) FY2024 UNPLANNED DRYDOCK REPAIRS
Closed Solicitation Posted
- Solicitation number
- 70Z04024QSBPL0020
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 336611 Ship Building and Repairing
- PSC
- J999 Non-Nuclear Ship Repair (West)
Notice details come from SAM.gov. Updated .
About this opportunity
This federal contract opportunity is for unplanned drydock repairs on the USCG STA NOYO RIVER (47271) vessel. The procuring agency is the Department of Homeland Security U.S. Coast Guard. The key contract requirements include renewing the forward deck, cleaning and inspecting buoyancy chambers, refueling diesel tanks, providing marine chemist services, drydocking, temporary services, supporting sea trials, and general welding. The evaluation criteria include technical capability, price, and past performance. Quotes are due by September 9, 2024 at 2:00 PM EST, and the government intends to award the contract on or about September 13, 2024.
This opportunity is set aside for total small business. The period of performance is 33 calendar days from September 23 to October 25, 2024. The contractor must provide a facility with specific accessibility and water depth requirements, as well as required insurance coverage. The NAICS code is 336611 - Ship Building and Repairing, and the PSC code is J999 - Non-Nuclear Ship Repair (West). The contract will be awarded on a lowest price technically acceptable basis.
Notice text
2 versions
Update #2 · Latest ·
USCG STA NOYO RIVER (47271) 70Z04024SBPL0020 00001 Amendment RFC question and answers
- There is a line item for Refuel, but there is not a line item for removal of the fuel. Should we assume that the boat will come with no fuel in it? Should we include the removal of fuel somewhere else in the bid?
- There is no need to defuel as the fuel tanks are above the red-line for welding. GFE Boat Hot Work Diagrams FL-085-2 The boat will arrive not at 95% fuel capacity just based on transit. However, we want it to leave at 95% fueled.
- D-001 lists the port, starboard, bow, and stern fenders as GFM fenders. But there is no specific line item for removal of ALL the fenders. Are we to assume they are damaged?
- They are damaged and the PE is going to ask for them to be replaced. Listing them as GFE will save us time during the PoP as they have to be removed for completion on the deck renewal.
- Do you anticipate us needing to paint the faying surfaces or will that be change order work?
- DeSpec does not contain a ‘fender faying preservation’ WI for the 47 MLB. Preservation will be handled via CR. In the creation of the Spec Package, no additional work outside of safety items was to be included. However, the rub rails must be removed (except for the stern). The following can be added into D-001 if needed (and a CR won’t suffice):
3.4 Preparation/Preservation. The Contractor must prepare and preserve the area covered by the removed portions of the fendering system and aluminum faying surfaces (surfaces of similar or dissimilar materials that are fit closely together and fastened) in accordance with Coast Guard Drawing 47B-MLB 631-020 and SFLC Std Spec 6310.
3.5 Renewal. After the completion of all inspections and any authorized repairs, the Contractor must renew the designated rub rail sections. Reuse existing washers, and renew all nylon insert locking nuts in accordance with SFLC Std Spec 0000.
3.5.1 The Contractor must apply sealant to the top and bottom of each renewed rub rail in accordance with CG Drawing 47B-MLB 611-020.
- It also lists rub rails under interference removals, but aren't the fenders the rub rail?
- It is the rub rail. DeSpec is inconsistent. Fenders = Rub Rails and Rub Rails = Fenders
USCG STA NOYO RIVER (47271) FY2024 UNPLANNED DRYDOCK REPAIRS
Combined Synopsis/ Solicitation 70Z04024QSBPL0020, Specification package Rev-0, dated
26 AUG 2024, Past Performance Questionnaire, Schedule of Supplies and Services, information is provided as a PDF file and available for download. PERIOD OF PERFORMANCE IS 23SEP2024 TO 25OCT2024, A THIRTY-THREE (33) CALENDAR DAY AVAILIBILITY.
Update #1 ·
USCG STA NOYO RIVER (47271) FY2024 UNPLANNED DRYDOCK REPAIRS
Combined Synopsis/ Solicitation 70Z04024QSBPL0020, Specification package Rev-0, dated
26 AUG 2024, Past Performance Questionnaire, Schedule of Supplies and Services, information is provided as a PDF file and available for download. PERIOD OF PERFORMANCE IS 23SEP2024 TO 25OCT2024, A THIRTY-THREE (33) CALENDAR DAY AVAILIBILITY.
Files
| File | Type | Posted |
|---|---|---|
| SF- 30 amendment 70Z04024QSBPL00200001_US.pdf | ||
| 47271 Schedule of Supplies and Services.pdf | ||
| 47271 SPEC.pdf | ||
| 47271 Additional Contract Requirements.pdf | ||
| 47271 PPQ.pdf | ||
| 70Z04024QSBPL0020_0_US.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| USCG STA panama city (45633) FY27 drydock repairs | — | Total Small Business | |
| Drydock repairs for the CGC pamlico | — | Total Small Business | |
| Drydock: USCGC william chadwick DD FY2027 | — | No set-aside | |
| USCG STA coos BAY (47302-47242) FY27 DD repair | — | Total Small Business | |
| Drydock Repairs USCGC HATCHET (WLIC-75309) | — | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity