47271 Schedule of Supplies and Services.pdf

PDF 81 KB Posted

Attached to
Dry-dock: USCG STA NOYO RIVER (47271) FY2024 UNPLANNED DRYDOCK REPAIRS
Solicitation number
70Z04024QSBPL0020
Issued by

About this file

This document is a Schedule of Supplies and Services for a federal contract opportunity to perform dry-docking repairs and alterations to the USCG STA NOYO RIVER (47271) vessel. The contract has a period of performance from 23SEP2024 to 25OCT2024, a 33-calendar day availability. The required CLIN items include renewing the forward deck, cleaning and inspecting the buoyancy chambers, refueling the diesel tanks, providing marine chemist services, drydocking, temporary services, supporting sea trial performance, and general welding. Optional CLIN items include a composite labor rate and a GFP report. Pricing is required for each CLIN item, with an overall total value. The solicitation number is 70Z04024QSBPL0020, and the procuring agency is the Department of Homeland Security US Coast Guard.

View the file

Other files

File Type Posted
SF- 30 amendment 70Z04024QSBPL00200001_US.pdf PDF
47271 SPEC.pdf PDF
47271 Additional Contract Requirements.pdf PDF
70Z04024QSBPL0020_0_US.pdf PDF
47271 PPQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Supplies and Services: USCG STA NOYO RIVER (47271)

Solicitation: 70Z04024QSBPL0020

The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified, to perform dry-docking repairs and alterations to the vessel, in accordance with this solicitation and attached specifications.

Failure to read the specifications in their entirety will not relieve the quoter from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the quoter’s risk.

Schedule of Supplies and Services:

To be filled out with a cost associated for each Definite CLIN and Option(s) CLIN with an overall total submitted on an Excel spreadsheet.

CLIN DESCRIPTION QUANTITY

UNIT

OF

ISSUE

UNIT PRICE TOTAL

D-001 Forward Deck, Renew 1 JOB D-002 Buoyancy Chamber(s), Clean and Inspect 1 JOB D-003 Diesel Tanks, Refuel 1 JOB D-004 Marine Chemist Services, Provide 1 JOB D-005 Drydock 1 JOB D-006 Temporary Services, Provide 1 JOB D-007 Sea Trial Performance, Support, Provide 1 JOB D-008 General Welding, Provide 1 JOB O-009 Composite Labor Rate 1 HR D-010 GFP Report 1 JOB O-011 Laydays 1 DAY

Total Definite Value $ Total Option Value $

(Firm fixed priced items and optional items) Total Value $

File details come from the government source that posted it. Updated .