DRAFT Statement of Work- Fort Belvoir Roofing SATOC IDIQ
Special Notice Posted
- Solicitation number
- W5168W-24-R-0022
- Agency
-
Department of the Army
Department of Defense
- Set-aside
- Competitive 8(a)
Opportunity facts
- NAICS code
- 238160 Roofing Contractors
- Place of performance
- Fort Belvoir, Virginia, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This Special Notice, published by the Department of the Army, announces a draft Statement of Work for a Fort Belvoir Roofing Single Award Task Order Contract (SATOC) Indefinite Delivery/Indefinite Quantity (IDIQ) opportunity. The requirement involves furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing, and replacement on buildings at Fort Belvoir, Virginia and surrounding satellite facilities. This is designated as a Competitive 8(a) set-aside contract under NAICS code 238160 (Roofing Contractors). The government has been providing regular updates since September 2024, with the most recent update from April 2025 indicating continued work on processes required before posting the official solicitation. The contract identification number was changed from W5168W-24-R-0022 to W5168W-25-R-0026 as of November 2024.
The purpose of this Special Notice is to provide advance notification to potential contractors about the upcoming roofing services contract, which has an estimated value between $10-25 million over a 5-year ordering period with a potential 6-month option period. Key requirements for contractors include possessing a Virginia Class A Contractor's License and maintaining a local office within 2 hours of Fort Belvoir. The government conducted a site visit on October 9, 2024, and has provided responses to industry questions through attachments to the posting. Performance bonds will be required for task orders exceeding $150,000, and contractors must meet extensive safety, health, and environmental compliance requirements. While the government initially intended to release the Request for Proposal in December 2024, the official solicitation remains forthcoming as procurement processes continue, with contractors advised to monitor Sam.gov for updates.
Notice text
13 versions
Update #13 · Latest ·
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
Update as of 15 JUL 2025: The solicitation has been posted as: Fort Belvoir SATOC Roofing IDIQ-W5168W-25-R-A005.
__________________________________________________________
Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
___________________________________________________________
Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
___________________________________________________________
Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
____________________________________________________________
Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
____________________________________________________________
Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates.
___________________________________________________________
Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
________________________________________________________________
Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.
________________________________________________________________
Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
_________________________________________________________________
Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
__________________________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.
Update #12 ·
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
__________________________________________________________
Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
___________________________________________________________
Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
___________________________________________________________
Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
____________________________________________________________
Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
____________________________________________________________
Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates.
___________________________________________________________
Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
________________________________________________________________
Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.
________________________________________________________________
Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
_________________________________________________________________
Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
__________________________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.
Update #11 ·
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
___________________________________________________________
Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
___________________________________________________________
Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
____________________________________________________________
Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
____________________________________________________________
Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates.
___________________________________________________________
Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
________________________________________________________________
Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.
________________________________________________________________
Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
_________________________________________________________________
Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
__________________________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.
Update #10 ·
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
____________________________________________________________
Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
____________________________________________________________
Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
____________________________________________________________
Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates.
___________________________________________________________
Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
________________________________________________________________
Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.
________________________________________________________________
Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
_________________________________________________________________
Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
__________________________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.
Update #9 ·
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
____________________________________________________________
Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.
____________________________________________________________
Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates.
___________________________________________________________
Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
________________________________________________________________
Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.
________________________________________________________________
Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
_________________________________________________________________
Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
__________________________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.
Update #8 ·
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
____________________________________________________________
Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates.
___________________________________________________________
Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
________________________________________________________________
Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.
________________________________________________________________
Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
_________________________________________________________________
Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
__________________________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.
Update #7 ·
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
______________________________________________________________
Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
________________________________________________________________
Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.
________________________________________________________________
Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
_________________________________________________________________
Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
__________________________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.
Update #6 ·
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
_______________________________________________________________
Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
________________________________________________________________
Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.
________________________________________________________________
Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
_________________________________________________________________
Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
__________________________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.
Update #5 ·
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
_______________________________________________________________
Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.
_______________________________________________________________
Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.
________________________________________________________________
Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
_________________________________________________________________
Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
__________________________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.
Update #4 ·
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
_____________________________________________________________________________________________________
Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.
_____________________________________________________________________________________________________
Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
____________________________________________________________________________________________________
Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
_____________________________________________________________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.
Update #3 ·
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
_____________________________________________________________________________________________________
Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
____________________________________________________________________________________________________
Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
_____________________________________________________________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.
Update #2 ·
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
_____________________________________________________________________________________________________
Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.
_____________________________________________________________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.
Update #1 ·
This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.
______________________________________________________________________
As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.
The official solicitation is forthcoming.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Special Notice | |
| Site Visit - PreSolicitation Notice Ft Belvoir Roofing Services | Pre-Solicitation | |
| Sources Sought-Fort Belvoir-Roofing | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity