DRAFT Statement of Work- Fort Belvoir Roofing SATOC IDIQ

Special Notice Posted

Solicitation number
W5168W-24-R-0022
Agency
Set-aside
Competitive 8(a)

Opportunity facts

NAICS code
238160 Roofing Contractors
Place of performance
Fort Belvoir, Virginia, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This Special Notice, published by the Department of the Army, announces a draft Statement of Work for a Fort Belvoir Roofing Single Award Task Order Contract (SATOC) Indefinite Delivery/Indefinite Quantity (IDIQ) opportunity. The requirement involves furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing, and replacement on buildings at Fort Belvoir, Virginia and surrounding satellite facilities. This is designated as a Competitive 8(a) set-aside contract under NAICS code 238160 (Roofing Contractors). The government has been providing regular updates since September 2024, with the most recent update from April 2025 indicating continued work on processes required before posting the official solicitation. The contract identification number was changed from W5168W-24-R-0022 to W5168W-25-R-0026 as of November 2024.

The purpose of this Special Notice is to provide advance notification to potential contractors about the upcoming roofing services contract, which has an estimated value between $10-25 million over a 5-year ordering period with a potential 6-month option period. Key requirements for contractors include possessing a Virginia Class A Contractor's License and maintaining a local office within 2 hours of Fort Belvoir. The government conducted a site visit on October 9, 2024, and has provided responses to industry questions through attachments to the posting. Performance bonds will be required for task orders exceeding $150,000, and contractors must meet extensive safety, health, and environmental compliance requirements. While the government initially intended to release the Request for Proposal in December 2024, the official solicitation remains forthcoming as procurement processes continue, with contractors advised to monitor Sam.gov for updates.

Notice text

13 versions

Update #13 · Latest ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

Update as of 15 JUL 2025: The solicitation has been posted as: Fort Belvoir SATOC Roofing IDIQ-W5168W-25-R-A005.

__________________________________________________________

Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

___________________________________________________________

Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

___________________________________________________________

Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

____________________________________________________________

Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

____________________________________________________________

Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and  https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates.

___________________________________________________________

Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

________________________________________________________________

Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.

________________________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

_________________________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

__________________________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #12 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

__________________________________________________________

Update as of 10 JUL 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

___________________________________________________________

Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

___________________________________________________________

Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

____________________________________________________________

Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

____________________________________________________________

Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and  https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates.

___________________________________________________________

Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

________________________________________________________________

Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.

________________________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

_________________________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

__________________________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #11 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

___________________________________________________________

Update as of 18 JUN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

___________________________________________________________

Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

____________________________________________________________

Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

____________________________________________________________

Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and  https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates.

___________________________________________________________

Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

________________________________________________________________

Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.

________________________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

_________________________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

__________________________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #10 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

____________________________________________________________

Update as of 7 APR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

____________________________________________________________

Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

____________________________________________________________

Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and  https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates.

___________________________________________________________

Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

________________________________________________________________

Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.

________________________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

_________________________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

__________________________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #9 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

____________________________________________________________

Update as of 6 MAR 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming.

____________________________________________________________

Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and  https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates.

___________________________________________________________

Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

________________________________________________________________

Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.

________________________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

_________________________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

__________________________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #8 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

____________________________________________________________

Update as of 31 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please be advised that two URLs in the Statement of Work have been updated to the following: https://stg.wbdg.org/dod/ufgs (Unified Facilities Guide Specifications (UFGS)) and  https://www.nibs.org/wbdg/ffc-dod (Unified Facilities Criteria (UFC)). Please continue to monitor Sam.gov for updates.

___________________________________________________________

Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

________________________________________________________________

Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.

________________________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

_________________________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

__________________________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #7 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

______________________________________________________________

Update as of 17 JAN 2025: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

________________________________________________________________

Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.

________________________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

_________________________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

__________________________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #6 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

_______________________________________________________________

Update as of 31 DEC 2024: At this time, the Government continues to work through the processes required before posting the solicitation. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

________________________________________________________________

Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.

________________________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

_________________________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

__________________________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #5 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

_______________________________________________________________

Update as of 26 NOV 2024: At this time the Government continues to work through the processes required before posting the solicitation. The ID number for this requirement has changed from W5168W-24-R-0022 to W5168W-25-R-0026. The official solicitation is forthcoming. Please continue to monitor Sam.gov for updates.

_______________________________________________________________

Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.

________________________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

_________________________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

__________________________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #4 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

_____________________________________________________________________________________________________

Update as 7 NOV 2024: The Government has answered all questions submitted by industry in response to the Site Visit held on 9 OCT 2024. The Q&A has been uploaded in the Attachments section of this posting.

_____________________________________________________________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

____________________________________________________________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

_____________________________________________________________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #3 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

_____________________________________________________________________________________________________

Update as of 7 NOV 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

____________________________________________________________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

_____________________________________________________________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #2 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

_____________________________________________________________________________________________________

Update as of 23 OCT 2024: At this time the Government is finalizing the RFP for the Ft. Belvoir Roofing SATOC/IDIQ. It is the Government’s intent to release the RFP on or about December 2024. Please continue to monitor Sam.gov for updates.

_____________________________________________________________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Update #1 ·

This is a construction-roofing requirement which entails furnishing all labor, equipment, and materials to perform roof removal, installation, repair, sealing and or replacement to buildings at Ft Belvoir, VA as needed to include incidental work in accordance with the specifications of the statement of work (SOW). Work performed by the contractor shall result in a complete, functional, and suitable system.

______________________________________________________________________

As of 23 September 2024, the Government intends to publish a DRAFT Statement of Work. This Draft Statement of Work is for informational purposes only and may be updated at the Government's discretion.

The official solicitation is forthcoming.

Files

Notice history

Notice Type Posted
This notice Latest special notice Special Notice
Site Visit - PreSolicitation Notice Ft Belvoir Roofing Services Pre-Solicitation
Sources Sought-Fort Belvoir-Roofing Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors