Design/Bid/Build of the Logistics Readiness Complex at Grissom Air Reserve Base (GARB), Indiana
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912QR24B0014
- Agency
-
ENDIST Louisville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Grissom ARB, Indiana 46971, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue an Invitation for Bids (IFB), Solicitation No. W912QR24B0014, for the fully designed construction of a new one-story, approximately 33,000 SF Logistics Readiness Complex (LRC) at Grissom Air Reserve Base (GARB) in Indiana. The project scope includes a drive-through corridor, HVAC-controlled mobility bag storage, offices, meeting rooms, parking, utilities, landscaping, and associated site work. Construction must comply with DoD Unified Facilities Criteria, Antiterrorism/Force Protection requirements, and AFRC Energy Policy. The government will award a firm-fixed-price contract, and bids are due by September 16, 2024.
This is a full and open procurement with no set-asides, but the HUBZone 10% price evaluation preference applies. The estimated construction cost range is between $25-$100 million. The project includes three optional bid items: 1) Add Marshalling Lot, 2) Add Cargo Lot, and 3) Provide Furniture, Fixtures, and Equipment. The performance period is 889 calendar days after contract award, and the place of performance is Grissom Air Reserve Base in Peru, Indiana.
Notice text
6 versions
Update #6 · Latest ·
***UPDATED BID OPENING CALL-IN DETAILS***
TELECONFERENCE NUMBER: 503-207-9433
ATTENDEE ACCESS CODE: 306412947#
***UPDATED BID OPENING CALL-IN DETAILS***
Solicitation W912QR24B0014 for the Design/Build for the construction of the Logistics Readiness Complex (LRC) at Grissom Air Reserve Base, Indiana is hereby amended as follows: See summary of changes for list of drawings and specs revisions incorporated in this amendment. This amendment extends the due date to 16 September 2024 @ 1200, PM EST.
Update #5 ·
Solicitation W912QR24B0014 for the Design/Build for the construction of the Logistics Readiness Complex (LRC) at Grissom Air Reserve Base, Indiana is hereby amended as follows: See attached revised drawings and specs. Solicitation due date extended to 16 September 2024.
Update #4 ·
Solicitation W912QR24B0014 for the Design/Build for the construction of the Logistics Readiness Complex (LRC) at Grissom Air Reserve Base, Indiana is hereby amended as follows: The following Drawings have been revised: Drawing number and name A-403 ENLARGED PLANS, A-603 DOOR SCHEDULE AND DETAILS, ES101 ELECTRICAL SITE PLAN - AREA A, and ES102 ELECTRICAL SITE PLAN - AREA B. See attachment labeled, Amendment 0001. Revision documents will be uploaded by COB 26 August 2024.
Update #3 ·
Solicitation W912QR24B0014 for the Design/Build for the construction of the Logistics Readiness Complex (LRC) at Grissom Air Reserve Base, Indiana is hereby amended as follows: The following Drawings have been revised: Drawing number and name A-403 ENLARGED PLANS, A-603 DOOR SCHEDULE AND DETAILS, ES101 ELECTRICAL SITE PLAN ? AREA A, and ES102 ELECTRICAL SITE PLAN ? AREA B. See attachment labeled, Amendment 0001.
Update #2 ·
The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue an Invitation for Bids (IFB), Solicitation No. W912QR24B0014 for fully designed construction of a new Logistics Readiness Complex (LRC) located at Grissom Air Reserve Base (GARB), IN. Provide all labor, material, and equipment necessary to safely construct the LRC at Grissom Air Reserve Base on time and within budget. Scope of project calls for the construction of a new LRC for the Logistics Readiness Squadron (LRS) and all LRS operational and administrative components at Grissom Air Reserve Base. The complex shall include drive through corridor, HVAC controlled mobility bag storage space, offices, meeting rooms, office support spaces, parking, driveways, utility connections, and landscaping with vehicular access to the flight line. The total square footage of the one-story proposed structure is approximately 33,000 SF. The project also includes paved work areas in the vicinity of the proposed structure, access ways, fencing, security gates, and relocation of communication lines. Construction will include all work necessary to provide a complete and usable facility. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building requirements. This project will comply with DoD Antiterrorism/Force Protection requirements per UFC 4-010-01 and incorporate applicable aspects of AFRC Energy Policy. The project contains the following options:1. ADD Marshalling Lot 2. ADD Cargo Lot 3. Furniture, Fixtures, and Equipment.
*Specs and Drawings will be uploaded by COB
Update #1 ·
The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue an Invitation for Bids (IFB), Solicitation No. W912QR24B0014 for fully designed construction of a new Logistics Readiness Complex (LRC) located at Grissom Air Reserve Base (GARB), IN. Provide all labor, material, and equipment necessary to safely construct the LRC at Grissom Air Reserve Base on time and within budget. Scope of project calls for the construction of a new LRC for the Logistics Readiness Squadron (LRS) and all LRS operational and administrative components at Grissom Air Reserve Base. The complex shall include drive through corridor, HVAC controlled mobility bag storage space, offices, meeting rooms, office support spaces, parking, driveways, utility connections, and landscaping with vehicular access to the flight line. The total square footage of the one-story proposed structure is approximately 33,000 SF. The project also includes paved work areas in the vicinity of the proposed structure, access ways, fencing, security gates, and relocation of communication lines. Construction will include all work necessary to provide a complete and usable facility. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building requirements. This project will comply with DoD Antiterrorism/Force Protection requirements per UFC 4-010-01 and incorporate applicable aspects of AFRC Energy Policy. The project contains the following options:1. ADD Marshalling Lot 2. ADD Cargo Lot 3. Furniture, Fixtures, and Equipment.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Award - Logistics Readiness Complex at Grissom Air Reserve Base (GARB), Indiana | Award Notice | |
| This notice | Solicitation | |
| Design/Bid/Build of the Logistics Readiness Complex at Grissom ARB, Indiana | Pre-Solicitation | |
| Industry Day - Grissom Air Reserve Base (ARB), IN Logistics Readiness Complex (LRC) | Special Notice |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Mechanized Material Handling Storage Aid System at Grissom ARB, Indiana | AFLCMC Wright Patterson AFB | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity