Amendment 0001.pdf
PDF 1020 KB Posted
- Attached to
- Design/Bid/Build of the Logistics Readiness Complex at Grissom Air Reserve Base (GARB), Indiana
- Solicitation number
- W912QR24B0014
About this file
This document is Amendment 0001 to a solicitation for the design/bid/build construction of a new Logistics Readiness Complex (LRC) at Grissom Air Reserve Base (GARB) in Indiana. The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue an Invitation for Bids (IFB), Solicitation No. W912QR24B0014, for the construction of the approximately 33,000 SF one-story LRC facility. The scope includes a drive-through corridor, HVAC-controlled mobility bag storage, offices, meeting rooms, parking, utility connections, and landscaping with vehicle access to the flight line. The project also includes paved work areas, access ways, fencing, security gates, and communication line relocation. Options for a marshalling lot and cargo lot are included. The facility will be designed as permanent construction in accordance with DoD Unified Facilities Criteria and incorporate applicable aspects of AFRC Energy Policy.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9 10
FOYER
EQ-3
EQ-7
30' - 5" 6' - 4" 12' - 8"
S1A
S1B
30' - 0"
ENTRY
101130A
B5
A-006
B5
A-006
A2
A-331
C.4
S3BS3A
S3B
A-403
J15 F1
A-711
F1
A-711
VAULT
WEAPON CLEANING
22' - 7"
CL
CL
CL
EQ EQ20' - 0"
C1
C1
C1
C1
S1A
S2F
RADON PIT
LOCATION
A-403 L1L9
4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0"
CLCLCL CLCLCL
PROVIDE MOORING EYE HOOKS,
EMBEDDED IN CONCRETE.
CEILING MOORING HOOKS TO
BE PLACED IN SAME LOCATIONS
AS FLOOR. REF A-121
WALL MOORING HOOKS
TO BE SPACED EVERY 2'-0"
IN ELEVATION. FIRST ROW
TO BE 2'-0" AFF AND FINAL
ROW TO BE 10'-0" AFF
3/4" SQUARE SOCKET OPENING
FOR INSERTION OF METAL
STAKE TO BRING EYE TO GRADE
/ FLUSH WITH FINISH SURFACE
CONC SLAB REINF, RE: STRUCT.
PROVIDE 24" LONG #3 BAR
ON EACH HOLE, BEND
REBAR AS NECESSARY
PER ACI AT EDGES &
CORNERS
FILL EYE WITH SAND TO
EXCLUDE CONC.
DURING SLAB
CONSTRUCTION
/4
0' - 5"
CONC CAP REINF,
RE: STRUCT.
CEILING
FLOOR / WALL
3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0"
FRP
15' - 6"
3' - 4" 4' - 1" 4' - 1" 3' - 4"
SWS
'1
CG2
FRP
EQ EQ
6' - 2" 6' - 2"
CL
ALUMINUM CELL PHONE AND
LAPTOP LOCKERS, PROVIDE
MINIMUM OF 18 LAPTOP
BOXES AND 80 PHONE BOXES
S3B
F2A
1' - 6" 1' - 6" 6' - 0"
0' - 8"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A-403
E N
L A
R G
E D
P L A
N S
G R
IS
S
O M
A
IR
R E
S E
R V
E B
A S
E L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
B F
O S
T E
R
T A
P O
D A
C A
R K
N O
L L E
W T
O N
G A
Y
J U
L Y
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
L O
G
IS
T
IC
S R
E A
D
IN
E S
S C
O M
P L E
X B
L D
G
C T
G B
1/4" = 1'-0"E11
PAX LOBBY & FOYER
1/4" = 1'-0"A1
DEPLOYABLE WEAPONS STORAGE
GFGI EQUIPMENT SCHEDULE
MARK DESCRIPTION
EQ-1 TV-85", WALL MOUNT BRACKET
EQ-2 TV-50", WALL MOUNT BRACKET
EQ-3 X-RAY BAG MACHINE 37"D x 78"L x 37"W
EQ-4 SAFE 27"D x 38"W x 23"H
EQ-5 SAFE 19"D x 30"W x 58"H
EQ-6 PAPER SHREDDER
EQ-7 PASSENGER METAL DETECTOR, 28"D x 35"W
EQ-8 AMNESTY BOX, 24"D x 24"W
EQ-9 COPY/PRINTER WITH SORTER
EQ-10 REFRIGERATOR, UNDERCOUNTER
EQ-11 25 CU. FT. SIDE-BY-SIDE REFRIGERATOR - STAINLESS STEEL
EQ-12 MICROWAVE
EQ-13 FLOOR SCALE PLATFORM, 36"D x 36"W
EQ-14 ICE MACHINE
EQ-15 COFFEE MAKER, COUNTER W/ WATER
EQ-16 MOVEABLE STORAGE
EQ-17 PUSH BACK RACKS
EQ-18 SHELVING
EQ-19 WEAPON CLEANING FUME HOOD
EQ-20 WEAPON CLEANING BASIN
3" = 1'-0"A11
MOORING EYE DETAIL @ FLR, WALL & CLG, TYP.
1/4" = 1'-0"L1
121 MOBILITY BAG STORAGE (E)
1/4" = 1'-0"L9
121 MOBILITY BAG STORAGE (W)
SCALE: = 1'-0"3"
PLAN
NORTH
SCALE: = 1'-0"
0 4 84
1/4"
1/4" = 1'-0"J15
ENLARGED ELEVATION - SECURE BOXES 1
M
O O
R
IN
G E
Y E
G R
ID
A
N D
N O
T E
S C
L A
R
IF
IE
D
S C
H E
D H
E
IG
H T
WIDTH
SCHED.
D1
SINGLE FLUSH
S C
H E
D H
E
IG
H T
SCHED WIDTH
D2
DOUBLE FLUSH
S C
H E
D H
E
IG
H T
WIDTH
SCHED.
D4
STOREFRONT
DOUBLE FULL GLASS
OH1
METAL COILING
DOOR
S C
H E
D H
E
IG
H T
WIDTH
SCHED.
0' - 4"0' - 4"
WIDTH
SCHED.
D5
DOOR WITH
NARROW LITE
S C
H E
D H
E
IG
H T
6"4"
G-1
G7
A-604
S C
H E
D H
E
IG
H T
SCHED WIDTH
D6
DOUBLE DOOR
NARROW LITE
6" 4"
WIDTH
SCHED.
D3
DOOR WITH HALF
LITE
S C
H E
D H
E
IG
H T
2' - 0" 6"
WIDTH
SCHED.
V1
VAULT DOOR
BY
MANUFACTURER
S C
H E
D H
E
IG
H T
G1
A-604
IG-1
IG-1 (EXTERIOR DOORS)
G-1 (INTERIOR DOORS) G-1
0' - 2"
WIDTH
SCHED. 0' - 2"
S C
H E
D H
E
IG
H T
F1
H.M. FRAME
1' - 0"
0' - 2"
WIDTH
SCHED.
S C
H E
D H
E
IG
H T
0' - 2"
S C
H E
D H
E
IG
H T
0' - 2"
WIDTH
SCHED. 0' - 2"
F5
H.M. FRAME
WITH TRAMSON
F3
HM FRAME
0' - 2"
WIDTH
SCHED. 0' - 2"
S C
H E
D H
E
IG
H T
F2
H.M. FRAME
0' - 2" WIDTH
SCHED.
0' - 2"
SCHED.
0' - 2"
S C
H E
D H
E
IG
H T
F4
H.M. FRAME
WITH SIDELIGHT
0'
0"
G-1 G-1 G-1
IG-1
CHANGES IN FLOOR LEVEL
SCALE: N.T.S
EXAMPLES OF ACCESSIBLE THRESHOLDS
SCALE: N.T.S.
CARPET PILE HEIGHT
SCALE: N.T.S.
VERTICAL CHANGE IN FLOOR LEVEL BEVELED CHANGE IN FLOOR LEVEL -
NOTE CHANGES IN FLOOR LEVEL
GREATER THAN 1/2" MUST BE RAMPED
302.2
ABA 303.2, 303.3
TILE
M A
X
1/ 4"
1/2"
1/ 4"
1/ 4"
M A
X
1/ 2"
M A
X
1/ 2"
M A
X
1/ 2"
EXTRUDED
ALUMINUM
THRESHOLD
EXTRUDED
ALUMINUM
THRESHOLD
LVT OR CARPET
DOOR AS SCHEDULED
EXTRUDED ALUMINUM
THRESHOLD
CONTINUOUS FINISH
EXTENDS THROUGH
DOOR OPENING
CAPET TO LVT VINYL
TRANSITION STRIP
NOTE: THE DIFFERENCE IN
FLOOR LEVEL CANNOT EXCEED
1/2" FROM ONE SIDE OF THE
DOOR TO THE OTHER - RAISE
THE LOWER FLOOR AS REQUIRED
AS IT APPROACHES THE DOOR
USING A SELF-DRYING CEMENT
BASED FINISH UNDERLAYMENT
DOOR AS SCHEDULED
TILE
IMPORTANT NOTE: FLOORING TRANSITIONS MAY OR MAY NOT OCCUR AT DOORS
CONCRETE SLAB
ACOUSTICAL THRESHOLD
GASKET MECHANICALLY
ATTACHED AT DOORS
ENTERING EXAM ROOMS
1/ 4"
M A
X
CONCRETE SLAB CONCRETE SLAB
LVT OR RESILIENT SHEET
DOOR AS SCHEDULED
GLAZING LEGEND
DESCRIPTION
IG-1 INSULATED GLAZING, LAMINATED
INSULATED GLAZING, LAMINATED, APPLIED FROSTED FILMIG-2
TP-1 TRANSLUCENT POLYCARBONATE PANEL
G-1 TEMPERED GLAZING
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A-603
D O
O R
S C
H E
D U
L E
A N
D D
E T
A
IL
S
G R
IS
S
O M
A
IR
R E
S E
R V
E B
A S
E L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
B F
O S
T E
R
S C
O L L
IN
S W
O R
T H
R K
N O
L L E
W T
O N
G A
Y
J U
L Y
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
L
L O
G
IS
T
IC
S R
E A
D
IN
E S
S C
O M
P L E
X B
L D
G
C T
G B
DOOR SCHEDULE
DOOR
NO.
DOOR
FIRE
RATING
STC
RATING
FRAME
HARDWARE
NOTES (REFER TO DOOR
SCHEDULE NOTES)TYPE
SIZE
MATERIAL TYPE
MATE
RIAL
DETAILS
WIDTH HEIGHT THICKNESS HEAD JAMB
100 D4 6' - 0" 7' - 0" 0' - 1 3/4" ALUM ALUM L17/A606 H1/604 HW-1
101 D6 6' - 0" 7' - 0" 0' - 1 3/4" HM F3 HM L1/A604 L5/A604 HW-4
101A D2 4' - 6" 7' - 0" 0' - 1 3/4" HM F2 HM L1/A604 L5/A604 HW-15
102A D3 3' - 0" 7' - 0" 0' - 1 3/4" HM F4 HM L1/A604 L5/A604 HW-5
102B D3 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-5
103A D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-8 5
103B D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-11 1,2,5
104 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-8
106 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-8
107 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-9
108 D3 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-15
109A D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-11 1,2
109B D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-8 3
110 D5 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-8
111 D5 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-8
112 D5 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-8
113 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-10
114 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-10
115 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-10
116A D3 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM K14/A604 F14,B14/A604 HW-2
116B D3 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM K14/A604 F14,B14/A604 HW-2
118 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-13 1,2
119 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-6 11
120 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-6 11
121A D1 4' - 0" 7' - 0" 0' - 2" HM 90 M F1 HM L1/A604 L5/A604 HW-9
121B D5 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM K14/A604 F14,B14/A604 HW-2 8
121C OH1 12' - 0" 12' - 0" 0' - 3" - - - G1/A604 G7/A604 HW-18 7
121D D5 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM K14/A604 F14,B14/A604 HW-2 8
121E OH1 12' - 0" 12' - 0" 0' - 3" - - - G1/A604 G7/A604 HW-18 7
121F D3 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM K14/A604 F14,B14/A604 HW-2
122A D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-11 1,2
122B D1 3' - 0" 7' - 0" 0' - 1 3/4" HM 45 M F1 HM L1/A604 L5/A604 HW-8
123 D2 6' - 0" 7' - 0" 0' - 1 3/4" HM 45 M F2 HM L1/A604 L5/A604 HW-12 5
124 V1 4' - 0" 7' - 0" 0' - 1 3/4" - - - D1/A604 D5/A604 HW-16 6
125 D2 6' - 0" 7' - 0" 0' - 1 3/4" HM F2 HM K14/A604 F14,B14/A604 HW-3
126 D3 3' - 0" 7' - 0" 0' - 1 3/4" HM F5 HM K14/A604 F14,B14/A604 HW-2
126A D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-5
127 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-9
128 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-9
129 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-7
130A D2 6' - 0" 7' - 0" 0' - 1 3/4" HM F2 HM L1/A604 L5/A604 HW-4
130B D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-11 1,2,5
131 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-10
132 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-10
133 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-8
134 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-7
135 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-7
136A D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-13 1,2
136B D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F5 HM K14/A604 F14,B14/A604 HW-2 5
136C D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F5 HM K14/A604 F14,B14/A604 HW-2 5
137 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-6 11
138 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-6 11
139A D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-13 1,2,10
139B D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F5 HM K14/A604 F14,B14/A604 HW-2 5
139C D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F5 HM K14/A604 F14,B14/A604 HW-2 5
140 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-6 11
141 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM STC 45 F1 HM L1/A604 L5/A604 HW-6 11
142 D2 6' - 0" 7' - 0" 0' - 1 3/4" HM F2 HM K14/A604 F14,B14/A604 HW-3
143 D5 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM K14/A604 F14,B14/A604 HW-2
144 D1 3' - 0" 7' - 0" 0' - 1 3/4" HM F1 HM L1/A604 L5/A604 HW-9
DOOR SCHEDULE NOTES
NOTES DESCRIPTION
1 ELECTRIFIED
2 ACCESS CONTROL, HARDWARE TO INCLUDE CARD READER
3 EXIT ONLY
4 EXIT DOOR ONLY, HARDWARE TO INCLUDE DEADLOCKING PANIC HARDWARE AND NO
EXTERIOR HARDWARE
5 WIDE ANGLE DOOR VIWER PEEPHOLE
6 VAULT DOOR BY SUPPLIER
7 OVERHEAD DOOR BY SUPPLIER
8 PROVIDE FROSTED GLAZING
9 NOT USED
10 EXIT DOOR TO REMAIN LOCKED, TIE TO FIRE ALARM SYSTEM TO UNLOCK FOR
EMERGENCY EGRESS
11 PROVIDE 3/4" UNDERCUT
1/4" = 1'-0"D1
DOOR TYPES
1/4" = 1'-0"A1
DOOR FRAMES TYPES
NTSL1
THRESHOLDS AND CHANGES IN LEVEL
3" = 1'-0"G1
INTERIOR DOOR THRESHOLD CONDITIONS
SCALE: = 1'-0"
0 4 84
1/4"
SCALE: = 1'-0"3"
D
O O
R S
C H
E D
U L
E R
E V
IS
IO
N S
CO
K P D
H
H
C O
LIMITS OF CONSTRUCTION
LIMITS OF CONSTRUCTION
INSTALLATION PERIMETER FENCE
ELECT GATE
ELECT GATE
EXISTING AERIAL
PORT FACILITY
LOGISTICS
READINESS
CENTER
33' UNOBSTRUCTED SPACE AND STANDOFF
33' UNOBSTRUCTED SPACE AND STANDOFF
U
N O
B S
T R
U C
T E
D S
P A
C E
A N
D S
T A
N D
O F
F
J
ELECTRICAL ROOM
FIRE PUMP ROOM
S H
E E
T E
S
S H
E E
T E
S
S H
E E
T E
S
S H
E E
T E
S
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1 9
S1
S1
S1
S1
S1
S1
S1
S1
MARSHALLING LOT
BID OPTION 1
- 11NPP1
CARGO LOT
BID OPTION 2
F6
E-502
F6
E-502
F6
E-502
F6
E-502
- 9NPP1
PANEL NPP1
F12
E-502
TYP.
HH
HH
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#8, 1#10 GND
3/4"C -2#10, 1#10 GND
- 13NPP2
S1
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
ES101
E L E
C T
R
IC
A L S
IT
E
P L A
N
A R
E A
A
G R
IS
S
O M
A
IR
R E
S E
R V
E B
A S
E P
D
IE
T
E R
L E
N
C D
IL
L O
N
R K
N O
L L E
K C
L E
M E
N T
E
J U
L Y
L O
G
IS
T
IC
S R
E A
D
IN
E S
S C
O M
P L E
X B
L D
G
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
LC
T
G B
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1" = 40'-0"
ELECTRICAL SITE PLAN - AREA A
A1
824 PLACE LIGHT POLE 5 FEET FROM THE CURB IN THE GRASS.
875 EXISTING UTILITY SWITCH LOCATION.
876 NEW UTILITY TRANSFORMER LOCATION. ROUTE (2) 3" PVC CONDUITS AND (2) 1" PVC CONDUITS FROM GENERATOR PAD TO ELECTRICAL ROOM. (1) 3" CONDUIT FOR POWER AND (1) 3" SPARE. (1) 1" CONDUIT SPARE. TRANSFORMER PAD TO BE PROVIDED BY E.C. CONTACT BRANDON WILLIAMS AT
MIAMI-CASS REMC (765) 473-6668 EXT. 1001.
MIAMI CASS REMC TO PROVIDE:
- (1) 225 KVA PAD MOUNT TRANSFORMER.
- ALL PRIMARY CABLE FROM THE EXISTING UTILITY SWITCH TO THE NEW TRANSFORMER.
- CABLE CONNECTIONS, PRIMARY AND SECONDARY.
CONTRACTOR TO PROVIDE:
- TRANSFORMER PAD.
- SECONDARY UNDERGROUND CONDUITS AND CABLE PER SINGLE LINE DIAGRAM.
877 NEW GENERATOR SET LOCATION. (1) 1" CONDUIT FOR BLOCK HEATER AND BATTERY CHARGING
CIRCUITS.
879 LIFT PUMP, PROVIDE CIRCUIT AS INDICATED ON SINGLE LINE DIAGRAM ON DRAWING E-601. ROUTE
ALARM CIRCUITS IN SEPARATE 2" CONDUIT.
880 EXTEND THE CONDUIT AND DUCTBANK OUT TO HANDHOLD AND STUB UNDER BASE BID. STUB
CONDUIT UNDER GROUND AND CAP IF BID OPTION IS NOT CONSTRUCTED
881 PROVIDE STAND NEXT TO LIFT STATION. MOUNT A NEMA 3R 30A NON-FUSED DISCONNECT SWITCH
FOR POWER CONNECTION.
0 20' 40' 80' 120' 1"=40'
PLAN
NORTH
1. REFER TO SINGLE-LINE DIAGRAM ON E-601 FOR MORE INFORMATION
2. REFER TO PANEL SCHEDULES ON DRAWINGS E-703 THRU E-706 FOR CIRCUIT INFORMATION.
3. TRANSFORMER AND CONDUCTORS ARE BY UTILITY. CONDUIT IS BY ELECTRICAL CONTRACTOR.
GRAPHIC SCALE IN FEET
ES101
MAPKEY
DEMARCATION RESPONSIBILITY MATRIX
ITEM NAME UTILITY
TRANSFORMER
PRIMARY DIRECT BURY CABLE TO TRANSFORMER
FROM EXISTING UTILITY SWITCH
TRANSFORMER PAD
TRANSFORMER SECONDARY CABLING AND
CONDUIT TO SWITCHBOARD
PRIMARY AND SECONDARY TRANSFORMER CABLE
CONNECTIONS
X
X
X
X
CONTRACTOR
X
BI
D
IN
Q
U
IR
Y
C O
N D
U
IT
A N
D D
U C
T B
A N
K T
E R
M
IN
A T
IO
N
C L A
R
IF
IE
D
CO
LIMITS OF CONSTRUCTION
INSTALLATION PERIMETER FENCE
" S
D
" S D
U
N O
B S
T R
U C
T E
D S
P A
C E
A N
D S
T A
N D
O F
F
S H
E E
T E
S
S H
E E
T E
S
S H
E E
T E
S
S H
E E
T E
S
S H
E E
T E
S
S H
E E
T E
S
S H
E E
T E
S
S H
E E
T E
S
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
- 11NPP1
CARGO LOT
BID OPTION 2
F12
E-502
TYP.
HH
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND 3/4"C -2#10, 1#10 GND
3/4"C -2#10, 1#10 GND
3/4"C -2#8, 1#10 GND
- 13NPP2
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
ES102
E L E
C T
R
IC
A L S
IT
E
P L A
N
A R
E A
B
G R
IS
S
O M
A
IR
R E
S E
R V
E B
A S
E P
D
IE
T
E R
L E
N
C D
IL
L O
N
R K
N O
L L E
K C
L E
M E
N T
E
J U
L Y
L O
G
IS
T
IC
S R
E A
D
IN
E S
S C
O M
P L E
X B
L D
G
C E
R T
IF
IE
D F
IN
A
L S
U B
M
IT
T A
LC
T
G B
GENERAL SHEET NOTES:
SHEET KEYNOTES:
1" = 40'-0"
ELECTRICAL SITE PLAN - AREA B
A5
880 EXTEND THE CONDUIT AND DUCTBANK OUT TO HANDHOLD AND STUB
UNDER BASE BID. STUB CONDUIT UNDER GROUND AND CAP IF BID
OPTION IS NOT CONSTRUCTED
0 20' 40' 80' 120' 1"=40'
PLAN
NORTH
1. REFER TO PANEL SCHEDULES ON DRAWINGS E-703 THRU E-706 FOR CIRCUIT INFORMATION.
GRAPHIC SCALE IN FEET
ES102
MAPKEY
DEMARCATION RESPONSIBILITY MATRIX
ITEM NAME UTILITY
TRANSFORMER
PRIMARY DIRECT BURY CABLE TO TRANSFORMER
FROM EXISTING UTILITY SWITCH
TRANSFORMER PAD
TRANSFORMER SECONDARY CABLING AND
CONDUIT TO SWITCHBOARD
PRIMARY AND SECONDARY TRANSFORMER CABLE
CONNECTIONS
X
X
X
X
CONTRACTOR
X
C O
N D
U
IT
A N
D D
U C
T B
A N
K T
E R
M
IN
A T
IO
N
C L A
R
IF
IE
D
BI
D
IN
Q
U
IR
Y
| A-403 - ENLARGED PLANS (AM0001_20240820) |
| Sheets |
| A-403 - ENLARGED PLANS |
| A-603 - DOOR SCHEDULE AND DETAILS (AM0001_20240820) |
| Sheets |
| A-603 - DOOR SCHEDULE AND DETAILS |
| ES101 - ELECTRICAL SITE PLAN - AREA A (AM0001_20240820) |
| ES102 - ELECTRICAL SITE PLAN - AREA B (AM0001_20240820) |