W912QR24B0014_Specs-0002.pdf
PDF 3 MB Posted
- Attached to
- Design/Bid/Build of the Logistics Readiness Complex at Grissom Air Reserve Base (GARB), Indiana
- Solicitation number
- W912QR24B0014
About this file
This document is an Amendment to Solicitation W912QR24B0014 for the Design/Build construction of the Logistics Readiness Complex (LRC) at Grissom Air Reserve Base, Indiana. The amendment revises the bid due date to 16 September 2024 and includes changes to various drawings and specifications. Key updates include revisions to the project drawings for Code Summary, Fence Plan, Site Plans, Utility Plans, Structural Drawings, Architectural Drawings, Fire Suppression Drawings, Plumbing, HVAC, Electrical, and Site Utility Drawings. Additionally, the amendment updates several specification sections related to submittals, precast concrete, unit masonry, steel decks, aluminum doors and frames, overhead coiling doors, insulated translucent fiberglass sandwich panels, aluminum windows, door hardware, acoustical ceilings, pre-engineered metal building system, wet and dry pipe sprinkler systems, facility gas piping, and more. Offerors must acknowledge all amendments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
AMENDMENT 0002
Solicitation W912QR24B0014 for the Design/Build construction of the Logistics Readiness Complex (LRC) at Grissom Air Reserve Base, Indiana is hereby amended as follow s:
A. See summary of changes below .
B. Extending solicitation due date to 16 September.
B. Offerors must acknow ledge all Amendments C. All other therms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR24B0014
X 9B. DATED (SEE ITEM 11)
09-Aug-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Sep-2024
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR24B0014_Specs-0002
W912QR24B0014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
*Bid due date revised to 16 September 2024 @ 12:00 PM Eastern Time*
The following Drawings have been revised:
Drawing No. Drawing Name
GI001 CODE SUMMARY
GC102 FENCE PLAN BID OPTION 3
CS101 SITE PLAN
CS102 SITE PLAN
CS500 SITE DETAILS
CS502 SITE DETAILS
CS503 SITE DETAILS
CU100 OVERALL UTILITY PLAN
CU102 UTILITY PLAN
S-001 STRUCTURAL DRAWING NOTES
S-101 FOUNDATION PLAN
S-501 FOUNDATION DETAILS
A-003 INTERIOR PARTITION TYPES
A-005 AIR BARRIER PLAN
A-102 FLOOR PLAN - AREA B
A-122 FLOOR PLAN - REFLECTED CEILING - AREA B
A-201 WEST AND EAST ELEVATIONS
A-202 SOUTH ELEVATIONS
A-203 NORTH ELEVATIONS
A-311 WALL SECTIONS
A-330 COLUMN DETAILS
A-401 ENLARGED UNIT PLANS - AREA A
A-511 ROOF DETAILS
A-530 MISCELLANEOUS DETAILS
A-603 DOOR SCHEDULE AND DETAILS
A-604 DOOR DETAILS
A-605 WINDOW TYPES
A-606 WINDOW DETAILS
FP101 FIRE SUPPRESSION FIRST FLOOR PLAN - AREA A
P-601 PLUMBING SCHEDULES
P-905 DOMESTIC AND NATURAL GAS RISER DIAGRAMS
M-102 FLOOR PLAN - HVAC - AREA A
E-502 ELECTRICAL DETAILS
E-601 ELECTRICAL ONE-LINE DIAGRAM
ES101 ELECTRICAL SITE PLAN - AREA A
W912QR24B0014
The following Specifications have been revised:
Specification No. Specification Name
00 80 00.00 06B SUBMITTAL REGISTER
03 45 00 PRECAST ARCHITECTURAL CONCRETE (DELETED)
04 20 00 UNIT MASONRY
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
08 11 16 ALUMINUM DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 45 23 INSULATED TRANSLUSCENT FIBERGLASS SANDWICH PANEL WALL SYSTEM
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
09 51 00 ACOUSTICAL CEILINGS
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
12 21 00 WINDOW BLINDS
13 34 19 PRE-ENGINEERED METAL BUILDING SYSTEM
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
21 13 16 DRY PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
22 00 00 PLUMBING, GENERAL PURPOSE
23 11 20 FACILITY GAS PIPING
28 08 20 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING (DELETED)
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS) (DELETED)
32 11 23.23 BASE COURSE DRAINAGE LAYERS
32 17 23 PAVEMENT MARKINGS
32 31 31.53 HIGH-SECURITY FENCES (CHAIN LINK AND ORNAMENTAL) AND GATES
33 51 15 NATURAL-GAS / LIQUEFIED PETROLEUM GAS DISTRIBUTION PIPELINES (DELETED)
(End of Summary of Changes)
496418 Logistics Readiness Complex Grissom Air Reserve Base, IN
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 04/21, CHG 1: 06/23 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 32 01.00 06 10/23 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND
PERMITS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 91 19 05/2023 BUILDING ENCLOSURE COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DECONSTRUCTION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 6: 11/23 CAST-IN-PLACE CONCRETE
03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR
BELOW GRADE CONSTRUCTION
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 50 14 08/18 STRUCTURAL METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
DOCUMENT PROJECT Page 1
CERTIFIED FINAL SUBMITTAL
Amendment 0002***************************************************************
***************************************************************Amendment 0002
W912QR24B0014-0002
AMENDMENT 0002
Amendment 0002
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 08/23 BITUMINOUS DAMPPROOFING
07 21 13 08/23 BOARD AND BLOCK INSULATION
07 21 16 08/23 MINERAL FIBER BLANKET INSULATION
07 22 00 08/23 ROOF AND DECK INSULATION
07 27 10 08/23 BUILDING AIR BARRIER SYSTEM
07 27 19.01 08/23 SELF-ADHERING AIR BARRIERS
07 42 13 05/11, CHG 2: 02/18 METAL WALL AND SOFFIT PANELS
07 54 19 08/23 POLYVINYL-CHLORIDE ROOFING
07 60 00 08/23 FLASHING AND SHEET METAL
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/23 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS
08 34 59 08/08, CHG 1: 11/12 VAULT DOORS
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 45 23 05/19 INSULATED TRANSLUSCENT FIBERGLASS
SANDWICH PANEL WALL SYSTEM
08 51 13 05/19 ALUMINUM WINDOWS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 21 00 08/17, CHG 2: 11/18 WINDOW BLINDS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 08/20, CHG 1: 02/21 PRE-ENGINEERED METAL BUILDING SYSTEM
DOCUMENT PROJECT Page 2
CERTIFIED FINAL SUBMITTAL
W912QR24B0014-0002
AMENDMENT 0002
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 13 16 08/20 DRY PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE
(SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 93.00 06 08/16 TESTING, ADJUSTING, AND BALANCING
(TAB) OF HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 35 19.00 20 02/10, CHG 2: 08/18 INDUSTRIAL VENTILATION AND EXHAUST
23 52 00 04/08, CHG 5: 11/19 HEATING BOILERS
23 64 26 08/09, CHG 6: 11/22 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 47 08/08, CHG 4: 08/18 WATER-LOOP AND GROUND-LOOP HEAT PUMP
SYSTEMS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - DDC
25 05 11.02 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS - FIRE ALARM AND MASS
NOTIFICATION SYSTEMS
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 05 73 08/23 POWER SYSTEM STUDIES
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 24 13 08/21 SWITCHBOARDS
26 27 13.10 30 10/07, CHG 2: 08/18 ELECTRIC METERS
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
DOCUMENT PROJECT Page 3
CERTIFIED FINAL SUBMITTAL
W912QR24B0014-0002
BY-PASS/ISOLATION SWITCH
26 41 00 08/23 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 41 00 11/21 AUDIO-VISUAL SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00.00 06 07/18 EARTHWORK
31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK
31 21 13 11/18 RADON MITIGATION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE AND
RIGID PAVING
32 11 23.23 08/22 BASE COURSE DRAINAGE LAYERS
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS
32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND
ORNAMENTAL) AND GATES
32 92 19 08/17, CHG 1: 08/21 SEEDING
32 92 23 04/06, CHG 1: 08/21 SODDING
DIVISION 33 - UTILITIES
33 05 23.13 11/19 UTILITY HORIZONTAL DIRECTIONAL DRILLING
33 11 00 02/18, CHG 2: 11/23 WATER UTILITY DISTRIBUTION PIPING
33 11 23 11/09, CHG 1: 08/17 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 31 23.00 10 08/18 SANITARY SEWER FORCE MAIN PIPING
33 32 16 11/19, CHG 1: 11/23 PACKAGED UTILITY WASTEWATER PUMPING
STATIONS
33 40 00 11/21 STORMWATER UTILITIES
33 61 14 02/10 EXTERIOR BURIED PREINSULATED WATER
PIPING
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DOCUMENT PROJECT Page 4
CERTIFIED FINAL SUBMITTAL
Amendment 0002***************************************************************
***************************************************************Amendment 0002
Amendment 0002***************************************************************
***************************************************************Amendment 0002
W912QR24B0014-0002
-- End of Project Table of Contents --
DOCUMENT PROJECT Page 5
CERTIFIED FINAL SUBMITTAL
W912QR24B0014-0002
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT PROJECT Page 6
CERTIFIED FINAL SUBMITTAL
W912QR24B0014-0002
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Line
Acti vity
Transm ittal #
Specification
Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval
Needed
By
Material
Needed
By
Action
Code
Date Of
Action
Date FWD to
APPR / Auth
Date RCD From
CONTR
Date FWD To
Other Revwr
Date RCD
From Other
Reviewer
Action
Code
Date Of
Action
Mailed To
CONTR/ Date
RCD From
APPR
Authority Remarks
1 00 80 00.00 06 1 Preconstruction Submittals Local Agency Check 1.14
2 00 80 00.00 06 1 Preconstruction Submittals SF1413 Statement and
Acknowledgement 1.12
3 00 80 00.00 06 1 Preconstruction Submittals Radioactive Material/Equipment 1.32
4 00 80 00.00 06 1 Preconstruction Submittals Contour Map 1.7.3
5 00 80 00.00 06 2 Shop Drawings Mechanical/Electrical Room Layout 1.34 G
6 00 80 00.00 06 4 Samples Equipment Warranty Identification Tags 1.16 G
7 00 80 00.00 06 5 Design Data Progress Photographs 1.37
8 00 80 00.00 06 7 Certificates Warranty of Construction 1.16
9 00 80 00.00 06 7 Certificates
NO ASBESTOS - CONTAINING
MATERIAL (ACM) CERTIFICATION
1.15 G
10 00 80 00.00 06 7 Certificates
Certification for each individual product installed and identified to contain mineral fibers that no asbestos-containing materials were installed
1.15.2 G
11 00 80 00.00 06 7 Certificates
Documentation to show that the products containing mineral fiber materials have been microscopically examined by an
AIHA- or NVLAP-certified laboratory and the lab has determined that the material does not contain asbestos
1.15.2 G
12 00 80 00.00 06 7 Certificates Insurance 1.29
13 00 80 00.00 06 7 Certificates Sales and Use Tax 1.27
14 00 80 00.00 06 11 Closeout Submittals Preliminary (Working) As-Built Drawings 1.7.4 G
15 00 80 00.00 06 11 Closeout Submittals Final As-Built Drawings 1.7.1 G
16 00 80 00.00 06 11 Closeout Submittals CAD Working As-Built Drawings 1.7.1.2 G
17 00 80 00.00 06 11 Closeout Submittals Equipment-in-Place List 1.9.1
18 00 80 00.00 06 11 Closeout Submittals Maintenance and Parts Data 1.9.1
19 00 80 00.00 06 11 Closeout Submittals Warranty Management Plan 1.16 G
20 01 11 00 1 Preconstruction Submittals Salvage Plan 1.7
21 01 32 01.00 06 1 Preconstruction Submittals Project Scheduler Qualifications 1.3 G
22 01 32 01.00 06 1 Preconstruction Submittals Preliminary Project Schedule 3.4.1 G
23 01 32 01.00 06 1 Preconstruction Submittals Initial Project Schedule 3.4.2 G
24 01 32 01.00 06 1 Preconstruction Submittals Periodic Schedule Update 3.6.2 G
25 01 33 00 1 Preconstruction Submittals Submittal Register 1.7 G
26 01 33 29.00 06 1 Preconstruction Submittals Sustainability Action Plan 1.5.1.1 G
27 01 33 29.00 06 1 Preconstruction Submittals Preliminary Sustainability eNotebook 1.5.1.2 G
28 01 33 29.00 06 1 Preconstruction Submittals GBI GPCP 1.4 G
29 01 33 29.00 06 1 Preconstruction Submittals Sustainability Progress Report 1.5.1.4 G
30 01 33 29.00 06 11 Closeout Submittals Final Sustainability eNotebook 1.5.1.2 G
31 01 33 29.00 06 11 Closeout Submittals Amended Final Sustainability eNotebook 1.5.1.2 G
32 01 33 29.00 06 11 Closeout Submittals Final High Performance and Sustainable
Building Checklist
1.5.1.2 G
33 01 35 26.00 06 1 Preconstruction Submittals Accident Prevention Plan (APP) 1.7
34 01 35 26.00 06 1 Preconstruction Submittals Fatigue Management Plan 1.7
35 01 35 26.00 06 1 Preconstruction Submittals Bloodborne Pathogen Plan 1.7
36 01 35 26.00 06 1 Preconstruction Submittals Exposure Control Plan 1.7
(d)
CONTRACTOR
ACTION
CONTRACTOR SCHEDULE
DATES
APPROVING AUTHORITY
TITLE: AFRC Logistics Readiness Complex
SUBMITTAL REGISTER
JOB NAME:
LOCATION: Grissom Air Reserve Base, IN
CONTRACT NO:
CONTRACTOR:
W912QR24B0014-0002
Acti vity
Transm ittal #
Specification
Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval
Needed
By
Material
Needed
By
Action
Code
Date Of
Action
Date FWD to
APPR / Auth
Date RCD From
CONTR
Date FWD To
Other Revwr
Date RCD
From Other
Reviewer
Action
Code
Date Of
Action
Mailed To
CONTR/ Date
RCD From
APPR
Authority Remarks
(d)
CONTRACTOR
ACTION
CONTRACTOR SCHEDULE
DATES
APPROVING AUTHORITY
TITLE: AFRC Logistics Readiness Complex
SUBMITTAL REGISTER
JOB NAME:
LOCATION: Grissom Air Reserve Base, IN
CONTRACT NO:
CONTRACTOR:
37 01 35 26.00 06 1 Preconstruction Submittals Automatic External Defibrillator (AED)
Program 1.7
38 01 35 26.00 06 1 Preconstruction Submittals Site Layout Plan 1.7
39 01 35 26.00 06 1 Preconstruction Submittals Access/Haul Road Plan 1.7
40 01 35 26.00 06 1 Preconstruction Submittals Hearing Conservation Program 1.7
41 01 35 26.00 06 1 Preconstruction Submittals Respiratory Protection Plan 1.7
42 01 35 26.00 06 1 Preconstruction Submittals Health Hazard Control Program 1.7
43 01 35 26.00 06 1 Preconstruction Submittals Hazard Communication Program 1.7
44 01 35 26.00 06 1 Preconstruction Submittals Process Safety Management Plan 1.7
45 01 35 26.00 06 1 Preconstruction Submittals Lead Compliance Plan & Specifications 1.7
46 01 35 26.00 06 1 Preconstruction Submittals Asbestos Abatement Plan &
Specifications 1.7
47 01 35 26.00 06 1 Preconstruction Submittals Radiation Safety Program 1.7
48 01 35 26.00 06 1 Preconstruction Submittals Abrasive Blasting Plan 1.7
49 01 35 26.00 06 1 Preconstruction Submittals Heat Stress Monitoring Plan 1.7
50 01 35 26.00 06 1 Preconstruction Submittals Cold Stress Monitoring Plan 1.7
51 01 35 26.00 06 1 Preconstruction Submittals Indoor Air Quality Management Plan 1.7
52 01 35 26.00 06 1 Preconstruction Submittals Mold Remediation Plan 1.7
53 01 35 26.00 06 1 Preconstruction Submittals Chromium (VI) Exposure Evaluation 1.7
54 01 35 26.00 06 1 Preconstruction Submittals Crystalline Silica Assessment 1.7
55 01 35 26.00 06 1 Preconstruction Submittals Lighting Plan for Night Operations 1.7
56 01 35 26.00 06 1 Preconstruction Submittals Traffic Control Plan 1.7
57 01 35 26.00 06 1 Preconstruction Submittals Fire Prevention Plan 1.7
58 01 35 26.00 06 1 Preconstruction Submittals Wild Land Fire Management Plan 1.7
59 01 35 26.00 06 1 Preconstruction Submittals Arc Flash Hazard Analysis 1.7
60 01 35 26.00 06 1 Preconstruction Submittals Assured Equipment Grounding Control
Program (AEGCP) 1.7
61 01 35 26.00 06 1 Preconstruction Submittals Hazardous Energy Control Plan 1.7
62 01 35 26.00 06 1 Preconstruction Submittals Standard Pre-Lift Plan (LHE) 1.7
63 01 35 26.00 06 1 Preconstruction Submittals Critical Lift Plan - LHE 1.7 G DO
64 01 35 26.00 06 1 Preconstruction Submittals Fall Protection and Prevention Plan 1.7
65 01 35 26.00 06 1 Preconstruction Submittals Demolition/Renovation Plan (to include engineering survey) 1.7
66 01 35 26.00 06 1 Preconstruction Submittals Rope Access Work Plan 1.7
67 01 35 26.00 06 1 Preconstruction Submittals Excavation/Trenching Plan 1.7
68 01 35 26.00 06 1 Preconstruction Submittals PreCast Concrete Plan 1.7
69 01 35 26.00 06 1 Preconstruction Submittals Lift-Slab Plans 1.7
70 01 35 26.00 06 1 Preconstruction Submittals Masonry Bracing Plan 1.7
71 01 35 26.00 06 1 Preconstruction Submittals Steel Erection Plan 1.7
72 01 35 26.00 06 1 Preconstruction Submittals Tree Felling/Maintenance Program 1.7
73 01 35 26.00 06 1 Preconstruction Submittals Aircraft/Airfield Construction Safety &
Phasing Plan (CSPP) 1.7
74 01 35 26.00 06 1 Preconstruction Submittals Aircraft/Airfield Safety Plan Compliance
Document (SPCD) 1.7
75 01 35 26.00 06 1 Preconstruction Submittals Site Safety and Health Plan (HTRW) 1.7
76 01 35 26.00 06 1 Preconstruction Submittals Confined Space Entry Procedures 1.7
77 01 35 26.00 06 1 Preconstruction Submittals Confined Space Program 1.7
78 01 35 26.00 06 1 Preconstruction Submittals Activity Hazard Analysis (AHA) 1.8 G RO
W912QR24B0014-0002
Acti vity
Transm ittal #
Specification
Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval
Needed
By
Material
Needed
By
Action
Code
Date Of
Action
Date FWD to
APPR / Auth
Date RCD From
CONTR
Date FWD To
Other Revwr
Date RCD
From Other
Reviewer
Action
Code
Date Of
Action
Mailed To
CONTR/ Date
RCD From
APPR
Authority Remarks
(d)
CONTRACTOR
ACTION
CONTRACTOR SCHEDULE
DATES
APPROVING AUTHORITY
TITLE: AFRC Logistics Readiness Complex
SUBMITTAL REGISTER
JOB NAME:
LOCATION: Grissom Air Reserve Base, IN
CONTRACT NO:
CONTRACTOR:
79 01 35 26.00 06 1 Preconstruction Submittals Site Safety and Health Officer
Qualifications(SSHO)
1.5.1.1 G RO
80 01 35 26.00 06 1 Preconstruction Submittals Proof of qualification for Crane Operators 1.12.7 G RO
81 01 35 26.00 06 1 Preconstruction Submittals Critical Lift Plan 1.12.7 G RO
82 01 35 26.00 06 6 Test Reports Reports 1.12
83 01 35 26.00 06 6 Test Reports Accident Reports 1.12.1
84 01 35 26.00 06 6 Test Reports Monthly Exposure Reports 1.12.3
85 01 35 26.00 06 6 Test Reports Crane Reports 1.12.5
86 01 35 26.00 06 6 Test Reports Regulatory Citations and Violations 1.12.4
87 01 35 26.00 06 7 Certificates Confined Space Entry Permit 1.12.8
88 01 35 26.00 06 7 Certificates Hot work permit 1.13
89 01 35 26.00 06 7 Certificates Crane Certificate of Compliance 1.12.6
90 01 45 04.10 06 1 Preconstruction Submittals Construction Quality Control Plan 3.3 G RO
91 01 45 35 1 Preconstruction Submittals SIOR Letter of Acceptance 3.1.1 G
92 01 45 35 1 Preconstruction Submittals Project Manual 3.1.1 G
93 01 45 35 6 Test Reports Daily Reports 3.1.1
94 01 45 35 6 Test Reports Biweekly Reports 3.1.1
95 01 45 35 7 Certificates AISC Certified Steel Fabricator 2.1 G RO
96 01 45 35 7 Certificates Certificate of Compliance 2.1
97 01 45 35 7 Certificates Special Inspector 1.5 G
98 01 45 35 11 Closeout Submittals Comprehensive Final Report 3.1.1 G
99 01 46 00.00 06 1 Preconstruction Submittals Commissioning Specialists 1.4 G DO
100 01 46 00.00 06 1 Preconstruction Submittals Project Schedule 1.9 G DO
101 01 46 00.00 06 5 Design Data Design Review Report 3.1.4 G DO
102 01 46 00.00 06 6 Test Reports Construction Phase Commissioning Plan 3.1.3 G DO
103 01 46 00.00 06 6 Test Reports Pre-Functional Checklists 3.1.6.2 G DO
104 01 46 00.00 06 6 Test Reports PVT Procedures 3.1.6.4 G DO AE
105 01 46 00.00 06 6 Test Reports PVT Report 3.1.6.4 G DO
106 01 46 00.00 06 6 Test Reports Issues Log 1.7
107 01 46 00.00 06 6 Test Reports Trend Log Report 3.1.6.5 G DO AE
108 01 46 00.00 06 6 Test Reports Post-Construction Trend Log Report 3.6.1
109 01 46 00.00 06 6 Test Reports Commissioning Report 3.5 G DO AE
110 01 46 00.00 06 6 Test Reports Post-Construction Commissioning Report 3.6 G DO
111 01 46 00.00 06 7 Certificates Certificate of Readiness 1.8 G DO
112 01 46 00.00 06 10 Operation and Maintenance Data Systems Training 3.2 G DO
113 01 46 00.00 06 10 Operation and Maintenance Data Training Plan 3.3 G RO
114 01 46 00.00 06 10 Operation and Maintenance Data Training Attendance Rosters 3.3 G RO
115 01 46 00.00 06 10 Operation and Maintenance Data Systems Manual 3.4 G DO
116 01 46 00.00 06 10 Operation and Maintenance Data Post-Construction Systems Manual 3.6 G DO
117 01 46 00.00 06 10 Operation and Maintenance Data Maintenance and Service Life Plans 1.9 G DO
118 01 46 00.00 06 11 Closeout Submittals Final Commissioning Report 1.6 S DO
119 01 46 00.00 06 11 Closeout Submittals Final Construction Phase Commissioning
Plan
1.6 S
120 01 50 00 1 Preconstruction Submittals Construction Site Plan 1.3 G
W912QR24B0014-0002
Acti vity
Transm ittal #
Specification
Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval
Needed
By
Material
Needed
By
Action
Code
Date Of
Action
Date FWD to
APPR / Auth
Date RCD From
CONTR
Date FWD To
Other Revwr
Date RCD
From Other
Reviewer
Action
Code
Date Of
Action
Mailed To
CONTR/ Date
RCD From
APPR
Authority Remarks
(d)
CONTRACTOR
ACTION
CONTRACTOR SCHEDULE
DATES
APPROVING AUTHORITY
TITLE: AFRC Logistics Readiness Complex
SUBMITTAL REGISTER
JOB NAME:
LOCATION: Grissom Air Reserve Base, IN
CONTRACT NO:
CONTRACTOR:
121 01 50 00 1 Preconstruction Submittals Traffic Control Plan 3.4.1 G
122 01 50 00 1 Preconstruction Submittals Haul Road Plan 2.2.1 G
123 01 50 00 1 Preconstruction Submittals Contractor Computer Cybersecurity
Compliance Statements 1.6.1.4
124 01 50 00 1 Preconstruction Submittals Contractor Temporary Network
Cybersecurity Compliance Statements 1.6.6
125 01 50 00 6 Test Reports Backflow Preventer Tests 3.5
126 01 50 00 7 Certificates Backflow Tester 1.4.1
127 01 50 00 7 Certificates Backflow Preventers 1.4
128 01 57 19.00 06 1 Preconstruction Submittals Preconstruction Survey 1.6.1
129 01 57 19.00 06 1 Preconstruction Submittals Solid Waste Management Permit 1.11 G
130 01 57 19.00 06 1 Preconstruction Submittals Regulatory Notifications 1.6.2 G
131 01 57 19.00 06 1 Preconstruction Submittals Environmental Protection Plan 1.7 G
132 01 57 19.00 06 1 Preconstruction Submittals Dirt and Dust Control Plan 1.7.9.1 G
133 01 57 19.00 06 1 Preconstruction Submittals Employee Training Records 1.6.5
134 01 57 19.00 06 1 Preconstruction Submittals Environmental Manager Qualifications 1.6.4 G
135 01 57 19.00 06 1 Preconstruction Submittals Stormwater Pollution Prevention Plan
(Swppp)
3.2.1 G
136 01 57 19.00 06 6 Test Reports Inspection Reports 3.2.2.2
137 01 57 19.00 06 6 Test Reports Solid Waste Management Report 3.7.2.1 G
138 01 57 19.00 06 7 Certificates Employee Training Records 1.6.5
139 01 57 19.00 06 7 Certificates Erosion and Sediment Control Inspector 1.6.5
140 01 57 19.00 06 11 Closeout Submittals Stormwater Pollution Prevention Plan
Compliance Notebook
3.2.2.3 G
141 01 57 19.00 06 11 Closeout Submittals Stormwater Notice of Termination 3.2.2.4 G
142 01 57 19.00 06 11 Closeout Submittals Waste Determination Documentation 3.7.1 G
143 01 57 19.00 06 11 Closeout Submittals Disposal Documentation for Hazardous and Regulated Waste
3.7.4.6 G
144 01 57 19.00 06 11 Closeout Submittals Assembled Employee Training Records 1.6.5
145 01 57 19.00 06 11 Closeout Submittals Solid Waste Management Permit 1.11 G
146 01 57 19.00 06 11 Closeout Submittals Solid Waste Management Report 3.7.2.1 G
147 01 57 19.00 06 11 Closeout Submittals Hazardous Waste/Debris Management 3.7.4.1 G
148 01 57 19.00 06 11 Closeout Submittals Regulatory Notifications 1.6.2 G
149 01 57 19.00 06 11 Closeout Submittals Sales Documentation 3.7.2.1
150 01 57 19.00 06 11 Closeout Submittals As-Built Topographic Survey 3.2.2.4
151 01 74 19 1 Preconstruction Submittals Construction Waste Management Plan 1.7 G
152 01 74 19 6 Test Reports Quarterly Reports 1.9.2
153 01 74 19 6 Test Reports Annual Report 1.9.3
154 01 74 19 11 Closeout Submittals Final Construction Waste Diversion
Report
1.1 S
155 01 78 23 10 Operation and Maintenance Data Training Plan 3.1.1 G
156 01 78 23 10 Operation and Maintenance Data Training Outline 3.1.3 G
157 01 78 23 10 Operation and Maintenance Data Training Content 3.1.2 G
158 01 78 23 10 Operation and Maintenance Data Operation And Maintenance Manual, Progress Submittal
3.2.1 G
159 01 78 23 10 Operation and Maintenance Data Operation And Maintenance Manual, Prefinal Submittal
3.2.2 G
160 01 78 23 10 Operation and Maintenance Data Operation And Maintenance Manual, Final Submittal
3.2.3 G
W912QR24B0014-0002
Acti vity
Transm ittal #
Specification
Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval
Needed
By
Material
Needed
By
Action
Code
Date Of
Action
Date FWD to
APPR / Auth
Date RCD From
CONTR
Date FWD To
Other Revwr
Date RCD
From Other
Reviewer
Action
Code
Date Of
Action
Mailed To
CONTR/ Date
RCD From
APPR
Authority Remarks
(d)
CONTRACTOR
ACTION
CONTRACTOR SCHEDULE
DATES
APPROVING AUTHORITY
TITLE: AFRC Logistics Readiness Complex
SUBMITTAL REGISTER
JOB NAME:
LOCATION: Grissom Air Reserve Base, IN
CONTRACT NO:
CONTRACTOR:
161 01 78 23 11 Closeout Submittals Training Video Recording 3.1.4 G
162 01 78 23 11 Closeout Submittals Validation of Training Completion 3.1.6 G
163 01 78 23 11 Closeout Submittals Training Plan 3.1.1 G
164 01 78 23 11 Closeout Submittals Record Drawings And Utility Systems 1.6.6.7 G
165 01 91 19 1 Preconstruction Submittals Building Enclosure Commissioning
Specialist Qualifications
1.12.2.1 G
166 01 91 19 1 Preconstruction Submittals Building Enclosure Testing Work Plan 1.8 G
167 01 91 19 3 Product Data Thermal Imaging Camera 2.3 G
168 01 91 19 3 Product Data Test Equipment 2.1 G
169 01 91 19 5 Design Data Envelope Surface Area Calculations 3.7.2 G AE
170 01 91 19 6 Test Reports Completed Building Envelope Inspection
Checklists
3.6 G
171 01 91 19 6 Test Reports Pressure Test Procedures 3.7.5 G
172 01 91 19 6 Test Reports Air Leakage Test Report 1.12.3 G
173 01 91 19 6 Test Reports Air Leakage Test Report 3.7.5.8 G
174 01 91 19 6 Test Reports Diagnostic Test Report 1.12.3 G
175 01 91 19 7 Certificates Pressure Test Agency 1.12.2.2
176 01 91 19 7 Certificates Thermographer Qualifications 1.12.2.3
177 01 91 19 7 Certificates Certificate of Readiness 1.14
178 01 91 19 10 Operation and Maintenance Data Training 3.8 G
179 02 41 00 1 Preconstruction Submittals Deconstruction Plan 1.2.2
180 02 41 00 1 Preconstruction Submittals Existing Conditions 1.1
181 02 41 00 7 Certificates Notification 1.6
182 03 30 00 1 Preconstruction Submittals Concrete Curing Plan 1.6.3.1
183 03 30 00 1 Preconstruction Submittals Quality Control Program 1.6.5 G
184 03 30 00 1 Preconstruction Submittals Quality Control Personnel Certifications 1.6.6 G
185 03 30 00 1 Preconstruction Submittals Quality Control Organizational Chart 1.6.6
186 03 30 00 1 Preconstruction Submittals Laboratory Accreditation 1.6.8 G
187 03 30 00 1 Preconstruction Submittals Maturity Method Data 3.3.8
188 03 30 00 2 Shop Drawings Reinforcing Steel 1.6.2.1
189 03 30 00 2 Shop Drawings Finishing Plan 1.6.3.3
190 03 30 00 3 Product Data Joint Sealants 2.4.5
191 03 30 00 3 Product Data Joint Filler 2.4.4
192 03 30 00 3 Product Data Formwork Materials 2.1
193 03 30 00 3 Product Data Recycled Aggregate Materials 2.3.3.2
194 03 30 00 3 Product Data Cementitious Materials 2.3.1
195 03 30 00 3 Product Data Vapor Retarder 2.4.6
196 03 30 00 3 Product Data Concrete Curing Materials 2.4.1
197 03 30 00 3 Product Data Reinforcement 2.6
198 03 30 00 3 Product Data Liquid Chemical Floor Hardeners and
Sealers 2.4.3.1
199 03 30 00 3 Product Data Admixtures 2.3.4
200 03 30 00 3 Product Data Biodegradable Form Release Agent 2.2.2
201 03 30 00 3 Product Data Nonshrink Grout 2.4.2
202 03 30 00 5 Design Data Concrete Mix Design 1.6.1.1 G AE
203 03 30 00 6 Test Reports Concrete Mix Design 1.6.1.1 G AE
W912QR24B0014-0002
Acti vity
Transm ittal #
Specification
Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval
Needed
By
Material
Needed
By
Action
Code
Date Of
Action
Date FWD to
APPR / Auth
Date RCD From
CONTR
Date FWD To
Other Revwr
Date RCD
From Other
Reviewer
Action
Code
Date Of
Action
Mailed To
CONTR/ Date
RCD From
APPR
Authority Remarks
(d)
CONTRACTOR
ACTION
CONTRACTOR SCHEDULE
DATES
APPROVING AUTHORITY
TITLE: AFRC Logistics Readiness Complex
SUBMITTAL REGISTER
JOB NAME:
LOCATION: Grissom Air Reserve Base, IN
CONTRACT NO:
CONTRACTOR:
204 03 30 00 6 Test Reports Fly Ash 1.6.4.1
205 03 30 00 6 Test Reports Pozzolan 1.6.4.1
206 03 30 00 6 Test Reports Slag Cement 1.6.4.2
207 03 30 00 6 Test Reports Aggregates 1.6.4.3
208 03 30 00 6 Test Reports Compressive Strength Tests 3.12.3.3 G
209 03 30 00 6 Test Reports Unit Weight of Structural Concrete 3.12.3.5
210 03 30 00 6 Test Reports Chloride Ion Concentration 3.12.3.6
211 03 30 00 6 Test Reports Air Content 3.12.3.4
212 03 30 00 6 Test Reports Slump Tests 3.12.3.1
213 03 30 00 6 Test Reports Water 2.3.2
214 03 30 00 6 Test Reports Tolerance Report 3.9.2.1
215 03 30 00 7 Certificates Reinforcing Bars 2.6.1
216 03 30 00 7 Certificates Silica Fume Manufacturer's
Representative 1.6.3.2
217 03 30 00 7 Certificates
VOC Content for Form Release Agents, Curing Compounds, and Concrete
Penetrating Sealers
1.6.3.4
218 03 30 00 7 Certificates Safety Data Sheets 1.6.3.5
219 03 30 00 7 Certificates Forest Stewardship Council (FSC)
Certification 1.8.1
220 03 30 00 7 Certificates Field Testing Technician and Testing
Agency 1.6.6.2
221 03 30 00 8 Manufacturer's Instructions Liquid Chemical Floor Hardeners and
Sealers 2.4.3.1
222 03 30 00 8 Manufacturer's Instructions Joint Sealants 2.4.5
223 03 30 00 8 Manufacturer's Instructions Curing Compound 2.4.1
224 03 42 13.00 10 1 Preconstruction Submittals Quality Control Procedures 1.3.2.2
225 03 42 13.00 10 2 Shop Drawings Standard Precast Units 2.1.1 G
226 03 42 13.00 10 2 Shop Drawings Custom-Made Precast Units 2.1.2 G
227 03 42 13.00 10 2 Shop Drawings Special Finishes 3.2.4.3
228 03 42 13.00 10 3 Product Data Standard Precast Units 2.1.1
229 03 42 13.00 10 3 Product Data Proprietary Precast Units 2.1.3
230 03 42 13.00 10 3 Product Data Embedded Items 3.1.3
231 03 42 13.00 10 3 Product Data Accessories 2.2.6
232 03 42 13.00 10 5 Design Data Design Calculations 2.1.2 G AE
233 03 42 13.00 10 5 Design Data Concrete Mix Proportions 2.1.5.1 G AE
234 03 42 13.00 10 6 Test Reports Test Reports 1.3.2.4
235 03 42 13.00 10 7 Certificates Quality Control Procedures 1.3.2.2
236 03 42 13.00 10 11 Closeout Submittals Recycled content for fly ash and pozzolan
2.2.1 S
237 03 42 13.00 10 11 Closeout Submittals Recycled content for Ground Iron Blast-
Furnace Slag
2.2.1 S
238 03 42 13.00 10 11 Closeout Submittals Recycled content for Silica Fume 2.2.1 S
239 03 42 13.00 10 11 Closeout Submittals Recycled content for Synthetic Fiber
Reinforcement
2.2.1 S
240 03 42 13.00 10 11 Closeout Submittals Recycled content for steel 2.2.1 S
Amendment 0002****************************************************************************************************************
W912QR24B0014-0002
Acti vity
Transm ittal #
Specification
Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval
Needed
By
Material
Needed
By
Action
Code
Date Of
Action
Date FWD to
APPR / Auth
Date RCD From
CONTR
Date FWD To
Other Revwr
Date RCD
From Other
Reviewer
Action
Code
Date Of
Action
Mailed To
CONTR/ Date
RCD From
APPR
Authority Remarks
(d)
CONTRACTOR
ACTION
CONTRACTOR SCHEDULE
DATES
APPROVING AUTHORITY
TITLE: AFRC Logistics Readiness Complex
SUBMITTAL REGISTER
JOB NAME:
LOCATION: Grissom Air Reserve Base, IN
CONTRACT NO:
CONTRACTOR:
260 04 20 00 2 Shop Drawings Cut CMU 3.3.5.1 G
261 04 20 00 2 Shop Drawings Detail Drawings 3.4.1.1 G AE
262 04 20 00 3 Product Data Hot Weather Procedures 1.5.1 G
263 04 20 00 3 Product Data Cold Weather Procedures 1.5.2 G
264 04 20 00 3 Product Data Clay Brick 2.2.2.1.4 G
265 04 20 00 3 Product Data Cement 2.2.3.1.1
266 04 20 00 3 Product Data Cementitious Materials 2.4.1.1
267 04 20 00 3 Product Data Insulation 2.6.8
268 04 20 00 3 Product Data Clay Or Brick 2.2.2
269 04 20 00 4 Samples Mock-Up Panel 1.3.1.1 G
270 04 20 00 4 Samples Clay Or Brick 2.2.2
271 04 20 00 4 Samples Clay Brick 2.2.2.1.4
272 04 20 00 4 Samples Concrete Masonry Units (CMU) 2.2.3.1
273 04 20 00 4 Samples Admixtures for Masonry Mortar 2.4.1.4
274 04 20 00 4 Samples Anchors, Ties, and Bar Positioners 2.6.2
275 04 20 00 4 Samples Joint Reinforcement 2.6.3
276 04 20 00 4 Samples Clay Masonry Expansion-Joint Materials 2.6.6
277 04 20 00 4 Samples Insulation 2.6.8
278 04 20 00 5 Design Data Masonry Compressive Strength 2.1.2 G AE
279 04 20 00 5 Design Data Fire-Rated Concrete Masonry Units 2.2.3.2 G AE
280 04 20 00 5 Design Data Bracing Calculations 3.2.5 G AE
281 04 20 00 6 Test Reports Efflorescence Test 2.2.2.1.4
282 04 20 00 6 Test Reports Fire-Rated Concrete Masonry Units 2.2.3.2
283 04 20 00 6 Test Reports Field Testing of Mortar 3.6.1.1
284 04 20 00 6 Test Reports Field Testing of Grout 3.6.1.2
285 04 20 00 6 Test Reports Prism Tests 3.6.1.3
286 04 20 00 7 Certificates Special Masonry Inspector Qualifications 1.3.2
***************************************************************************************************************Amendment 0002
W912QR24B0014-0002
Acti vity
Transm ittal #
Specification
Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval
Needed
By
Material
Needed
By
Action
Code
Date Of
Action
Date FWD to
APPR / Auth
Date RCD From
CONTR
Date FWD To
Other Revwr
Date RCD
From Other
Reviewer
Action
Code
Date Of
Action
Mailed To
CONTR/ Date
RCD From
APPR
Authority Remarks
(d)
CONTRACTOR
ACTION
CONTRACTOR SCHEDULE
DATES
APPROVING AUTHORITY
TITLE: AFRC Logistics Readiness Complex
SUBMITTAL REGISTER
JOB NAME:
LOCATION: Grissom Air Reserve Base, IN
CONTRACT NO:
CONTRACTOR:
287 04 20 00 7 Certificates Clay Brick 2.2.2.1.4
288 04 20 00 7 Certificates Concrete Masonry Units (CMU) 2.2.3.1
289 04 20 00 7 Certificates Cementitious Materials 2.4.1.1
290 04 20 00 7 Certificates Admixtures for Masonry Mortar 2.4.1.4
291 04 20 00 7 Certificates Admixtures for Grout 2.4.2.2
292 04 20 00 7 Certificates Anchors, Ties, and Bar Positioners 2.6.2
293 04 20 00 7 Certificates Joint Reinforcement 2.6.3
294 04 20 00 7 Certificates Insulation 2.6.8
295 04 20 00 8 Manufacturer's Instructions Admixtures for Masonry Mortar 2.4.1.4
296 04 20 00 8 Manufacturer's Instructions Admixtures for Grout 2.4.2.2
297 04 20 00 10 Operation and Maintenance Data Take-Back Program 3.8
298 04 20 00 11 Closeout Submittals Clay Units 2.2.2.1.3 S
299 04 20 00 11 Closeout Submittals Recycled Content 2.2.3.1.2 S
300 05 05 20 1 Preconstruction Submittals Installer Qualifications 1.5.1.1 G
301 05 05 20 1 Preconstruction Submittals Post-Installed Anchor Special Inspector
Qualifications
1.5.1.2 G
302 05 05 20 3 Product Data Mechanical Anchors in Concrete 2.1.1.3 G
303 05 05 20 3 Product Data Adhesive Anchor System in Concrete 2.1.1.4 G
304 05 05 20 3 Product Data Mechanical and Adhesive Anchors in
Masonry
2.1.1.5 G
305 05 05 20 3 Product Data Non-Shrink, Non-Metallic Grout 3.1.3
306 05 05 20 6 Test Reports Post-Installed Anchor Special
Inspections Report 3.3.4
307 05 05 20 7 Certificates Post-Installed Anchor Certification 2.1.1.1 G
308 05 05 20 8 Manufacturer's Instructions Manufacturer's Printed Installation
Instructions 2.1.1.2
309 05 05 20 8 Manufacturer's Instructions Non-Shrink, Non-Metallic Grout 3.1.3
310 05 05 20 8 Manufacturer's Instructions Manufacturer's Material Safety Data
Sheets 1.5
311 05 05 23.16 1 Preconstruction Submittals Welding Quality Assurance Plan 3.2 G
312 05 05 23.16 3 Product Data Welding Procedure Qualifications 1.3 G
313 05 05 23.16 3 Product Data Welder, Welding Operator, and Tacker
Qualification 1.3.4
314 05 05 23.16 3 Product Data Previous Qualifications 1.3.2
315 05 05 23.16 3 Product Data Pre-Qualified Procedures 1.3.3 G
316 05 05 23.16 3 Product Data Welding Electrodes and Rods 2.2
317 05 05 23.16 6 Test Reports Nondestructive Testing 3.3
318 05 05 23.16 6 Test Reports Weld Inspection Log 3.2
319 05 05 23.16 7 Certificates Certified Welding Procedure
Specifications (WPS) 1.3.1
320 05 05 23.16 7 Certificates Certified Brazing Procedure
Specifications (BPS) 1.3.1
321 05 05 23.16 7 Certificates Certified Procedure Qualification
Records (PQR) 1.3.1
322 05 05 23.16 7 Certificates Certified Welder Performance
Qualifications (WPQ) 1.3.1
323 05 05 23.16 7 Certificates Certified Brazer Performance
Qualifications (BPQ) 1.3.1
324 05 05 23.16 7 Certificates Certified Welding Inspector 1.3.5
325 05 05 23.16 7 Certificates Nondestructive Testing Personnel 1.3.5
W912QR24B0014-0002
Acti vity
Transm ittal #
Specification
Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval
Needed
By
Material
Needed
By
Action
Code
Date Of
Action
Date FWD to
APPR / Auth
Date RCD From
CONTR
Date FWD To
Other Revwr
Date RCD
From Other
Reviewer
Action
Code
Date Of
Action
Mailed To
CONTR/ Date
RCD From
APPR
Authority Remarks
(d)
CONTRACTOR
ACTION
CONTRACTOR SCHEDULE
DATES
APPROVING AUTHORITY
TITLE: AFRC Logistics Readiness Complex
SUBMITTAL REGISTER
JOB NAME:
LOCATION: Grissom Air Reserve Base, IN
CONTRACT NO:
CONTRACTOR:
326 05 12 00 1 Preconstruction Submittals Erection and Erection Bracing Drawings 1.4.1.1 G AE
327 05 12 00 2 Shop Drawings Fabrication Drawings 1.4.2 G AE
328 05 12 00 3 Product Data Shop Primer 2.6.2
329 05 12 00 3 Product Data Welding Electrodes and Rods 2.4.1
330 05 12 00 3 Product Data Direct Tension Indicator Washers 2.3.2.3
331 05 12 00 3 Product Data Non-Shrink Grout 2.4.2
332 05 12 00 3 Product Data Tension Control Bolts 2.3.3
333 05 12 00 3 Product Data Recycled Content for Structural Steel 2.2.1 S
334 05 12 00 3 Product Data Recycled Content for Structural Steel
Tubing
2.2.2 S
335 05 12 00 3 Product Data Recycled Content for Steel Pipe 2.2.3 S
336 05 12 00 5 Design Data Shoring And Temporary Bracing 1.4.2 G AE
337 05 12 00 5 Design Data Design Calculations For Steel
Connections
1.4.3 G AE
338 05 12 00 6 Test Reports Class B Coating 2.6.2
339 05 12 00 6 Test Reports Bolts, Nuts, and Washers 2.3
340 05 12 00 6 Test Reports Weld Inspection Reports 3.7.1.2
341 05 12 00 6 Test Reports Direct Tension Indicator Washer
Inspection Reports 3.7.2.1
342 05 12 00 6 Test Reports Bolt Testing Reports 3.7.3.1
343 05 12 00 6 Test Reports Embrittlement Test Reports 3.7.4
344 05 12 00 7 Certificates Steel 2.2
345 05 12 00 7 Certificates Bolts, Nuts, and Washers 2.3
346 05 12 00 7 Certificates Galvanizing 2.5
347 05 12 00 7 Certificates Welding Procedures and Qualifications 1.4.4.1
348 05 12 00 7 Certificates Welding Electrodes and Rods 2.4.1
349 05 12 00 7 Certificates Certified Welding Inspector 3.7.1.1
350 05 12 00 7 Certificates NDT Technician 3.7.1.2
351 05 12 00 7 Certificates Welding Procedure Specifications (WPS) 3.4
352 05 30 00 2 Shop Drawings Fabrication Drawings 1.3.5
353 05 30 00 3 Product Data Accessories 2.2
354 05 30 00 3 Product Data Deck Units 2.1
355 05 30 00 3 Product Data Galvanizing Repair Paint 2.1.3
356 05 30 00 3 Product Data Mechanical Fasteners 3.2.1.2
357 05 30 00 3 Product Data Touch-Up Paint 2.1.3
358 05 30 00 3 Product Data Welding Equipment 1.3.3
359 05 30 00 3 Product Data Welding Rods and Accessories 1.3.3
360 05 30 00 3 Product Data Recycled Content of Steel Products 2.1 S
361 05 30 00 4 Samples Flexible Closure Strips 2.2.4
362 05 30 00 5 Design Data Deck Units 2.1 G AE
363 05 30 00 7 Certificates Powder-Actuated Tool Operator 1.3.2
364 05 30 00 7 Certificates Welder Qualifications 1.3.3
365 05 30 00 7 Certificates Welding Procedures 1.3.3
366 05 30 00 7 Certificates Fire Safety 1.3.4.1
367 05 30 00 7 Certificates Wind Storm Resistance 1.3.4.2
W912QR24B0014-0002
Acti vity
Transm ittal #
Specification
Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval
Needed
By
Material
Needed
By
Action
Code
Date Of
Action
Date FWD to
APPR / Auth
Date RCD From
CONTR
Date FWD To
Other Revwr
Date RCD
From Other
Reviewer
Action
Code
Date Of
Action
Mailed To
CONTR/ Date
RCD From
APPR
Authority Remarks
(d)
CONTRACTOR
ACTION
CONTRACTOR SCHEDULE
DATES
APPROVING AUTHORITY
TITLE: AFRC Logistics Readiness Complex
SUBMITTAL REGISTER
JOB NAME:
LOCATION: Grissom Air Reserve Base, IN
CONTRACT NO:
CONTRACTOR:
368 05 30 00 7 Certificates Manufacturer's Certificate 1.3.1
369 05 40 00 2 Shop Drawings Framing Components 1.6.1
370 05 40 00 3 Product Data Studs, Joists 2.1
371 05 40 00 3 Product Data Recycled Content of Steel Products 2.1 S
372 05 40 00 5 Design Data Metal Framing Calculations 1.6.2 G AE
373 05 40 00 7 Certificates Load-Bearing Cold-Formed Metal
Framing
1.4 G AE
374 05 40 00 7 Certificates Welds 3.1.1
375 05 50 13 2 Shop Drawings Bollards/Pipe Guards 2.5
376 05 50 13 2 Shop Drawings Angles and Plates 2.7
377 05 50 13 2 Shop Drawings Roof Hatches 2.8
378 05 50 13 3 Product Data Corner Guards 2.4
379 05 50 13 3 Product Data Roof Hatches 2.8
380 05 50 13 3 Product Data Downspout Terminations 2.6
381 05 50 13 3 Product Data Recycled Content 2.1 S
382 05 50 13 7 Certificates Certificates of Compliance 2.1
383 05 50 14 2 Shop Drawings Detail Drawings 1.3.1 G
384 05 50 14 2 Shop Drawings Welding Procedures 2.1.2.1.1 G
385 05 50 14 2 Shop Drawings Welding Repair Plan 2.2.4
386 05 50 14 2 Shop Drawings Steel Castings 2.1.2.2
387 05 50 14 3 Product Data Filler Metal 2.1.2.1.3.1
388 05 50 14 3 Product Data Lubricant 3.1
389 05 50 14 6 Test Reports Tests, Inspections, and Verifications 2.2
390 05 50 14 7 Certificates Welding Qualifications 1.3.2
391 05 50 14 7 Certificates Application Qualification for Steel Studs 2.1.2.3.1 G
392 05 50 14 7 Certificates Welding of Aluminum 2.1.2.4
393 05 50 14 7 Certificates Weld Inspection Log 2.2.3.1
394 05 50 14 7 Certificates Certified Welding Inspector 2.2.3.1
395 05 50 14 7 Certificates Nondestructive Testing Personnel 2.2.3.2.1
396 06 10 00 2 Shop Drawings Nailing Strips 2.2.1
397 06 10 00 3 Product Data Oriented Strand Board 2.3
398 06 10 00 3 Product Data Adhesives 2.4.3
399 06 10 00 3 Product Data Fire-Retardant Treated Lumber 1.4.5
400 06 10 00 6 Test Reports Preservative-treated 1.4.4
401 06 10 00 7 Certificates Certificates of Grade 1.9.1
402 06 10 00 7 Certificates Certified Sustainably Harvested Plywood for Other Uses
2.3.1.1 S
403 06 10 00 7 Certificates Preservative Treatment 1.7
404 06 10 00 7 Certificates Indoor Air Quality for Aerosol Adhesives 2.4.3 S
405 06 10 00 7 Certificates Certified Sustainably Harvested Virgin
Lumber 2.1.1
406 06 10 00 7 Certificates Certified Sustainably Harvested Framing
Lumber 2.2.1
407 06 10 00 7 Certificates
Certified Sustainably Harvested
Structural-Use And Osb Panels For
Other Uses
2.3.1.2
408 06 41 16.00 10 2 Shop Drawings Shop Drawings 2.9
W912QR24B0014-0002
Acti vity
Transm ittal #
Specification
Section
SD
# Submittal Description Item Submitted Paragraph #
Classification:
GOVT or A/E
Reviewer Submit
Approval
Needed
By
Material
Needed
By
Action
Code
Date Of
Action
Date FWD to
APPR / Auth
Date RCD From
CONTR
Date FWD To
Other Revwr
Date RCD
From Other
Reviewer
Action
Code
Date Of
Action
Mailed To
CONTR/ Date
RCD From
APPR
Authority Remarks
(d)
CONTRACTOR
ACTION
CONTRACTOR SCHEDULE
DATES
APPROVING AUTHORITY
TITLE: AFRC Logistics Readiness Complex
SUBMITTAL REGISTER
JOB NAME:
LOCATION: Grissom Air Reserve Base, IN
CONTRACT NO:
CONTRACTOR:
409 06 41 16.00 10 2 Shop Drawings Installation 3.1
410 06 41 16.00 10 3 Product Data Wood Materials 2.1
411 06 41 16.00 10 3 Product Data Certification 1.5.2
412 06 41 16.00 10 4 Samples Plastic Laminates 2.3
413 06 41 16.00 10 4 Samples Cabinet Hardware 2.6
414 06 41 16.00 10 7 Certificates Quality Assurance 1.5
415 06 41 16.00 10 7 Certificates Laminate Clad Casework 3.1
416 06 61 16 2 Shop Drawings Detail Fabrication Drawings 1.4.2
417 06 61 16 2 Shop Drawings Installation 3.1
418 06 61 16 3 Product Data Solid Polymer 2.1.1 G
419 06 61 16 3 Product Data Indoor air quality for solid surface seam and sealant products
2.2.2 S
420 06 61 16 3 Product Data Indoor Air Quality For Solid Surface
Fabrication Products 2.1.1
421 06 61 16 4 Samples Material 2.1
422 06 61 16 4 Samples Counter Tops 2.3.4
423 06 61 16 6 Test Reports Test Report Results 2.1.1
424 06 61 16 7 Certificates Qualifications 1.4.1
425 06 61 16 10 Operation and Maintenance Data Solid Polymer 2.1.1
426 07 11 13 7 Certificates Materials 1.3
427 07 21 13 2 Shop Drawings Manufacturer's Standard Details 1.3
428 07 21 13 3 Product Data Environmental Data for Materials 1.4
429 07 21 13 3 Product Data Block or Board Insulation 2.1
430 07 21 13 3 Product Data Vapor Retarder 3.6
431 07 21 13 3 Product Data Pressure Sensitive Tape 2.2
432 07 21 13 3 Product Data Protection Board or Coating 2.3
433 07 21 13 3 Product Data Accessories 2.4
434 07 21 13 3 Product Data Recycled Content for Block or Board
Insulation
2.1.4 S
435 07 21 13 7 Certificates Indoor Air Quality For Block Or Board
Insulation
2.1.5 S
436 07 21 13 8 Manufacturer's Instructions Insulation Installation and Handling 3.3.1
437 07 21 13 8 Manufacturer's Instructions Protection Board or Coating Installation 3.4.2
438 07 21 13 8 Manufacturer's Instructions Adhesive 2.4.1
439 07 21 13 11 Closeout Submittals Draft Guarantee 1.7.1
440 07 21 13 11 Closeout Submittals Final Guarantee 1.7.1
441 07 21 13 11 Closeout Submittals Draft Warranty 1.7.2
442 07 21 13 11 Closeout Submittals Final Warranty 1.7.2
443 07 21 16 3 Product Data Blanket Insulation 2.1
444 07 21 16 3 Product Data Recycled Content for Insulation Materials 2.1.1 S
445 07 21 16 3 Product Data Sill Sealer Insulation 2.2
446 07 21 16 3 Product Data Vapor Retarder 2.4
447 07 21 16 3 Product Data Pressure Sensitive Tape 2.5
448 07 21 16 3 Product Data Accessories 2.6
449 07 21 16 7 Certificates Indoor Air Quality for Insulation Materials 2.1.4 S
450 07 21 16 7 Certificates Indoor Air Quality for…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .