W912QR24B0014_Specs_Vol3-0000.pdf

PDF 3 MB Posted

Attached to
Design/Bid/Build of the Logistics Readiness Complex at Grissom Air Reserve Base (GARB), Indiana
Solicitation number
W912QR24B0014
Issued by

About this file

This document is a solicitation for the design and construction of a new Logistics Readiness Complex (LRC) at Grissom Air Reserve Base (GARB) in Indiana. The project involves constructing a one-story, approximately 33,000 square foot facility to house the Logistics Readiness Squadron's operational and administrative components, including a drive-through corridor, climate-controlled mobility bag storage, offices, meeting rooms, and support spaces. The scope also includes paved work areas, access ways, fencing, security gates, and utility work. The solicitation has three optional add-ons: a marshalling lot, a cargo lot, and furniture/fixtures/equipment. The project must comply with DoD Antiterrorism/Force Protection requirements and energy policies. Proposals are due to the U.S. Army Corps of Engineers Louisville District.

View the file

Other files

File Type Posted
W912QR24B0014_Plans-0002.pdf PDF
W912QR24B0014_Specs-0002.pdf PDF
W912QR24B0014_Plans-0001.pdf PDF
Amendment 0001.pdf PDF
W912QR24B0014_Specs_Vol4-0000.pdf PDF
W912QR24B0014_Specs_Vol2-0000.pdf PDF
W912QR24B0014_CID-0000.pdf PDF
W912QR24B0014_Specs_Vol1-0000.pdf PDF
W912QR24B0014_Plans -0000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Logistics Readiness Complex, Grissom Air Reserve Base, Peru, IN

P2: 496418

Design-Bid-Build

Specifications - Vol. 3 of 4 (DIV 23 - 28)

09 August 2024

W912QR24B0014

Certified Final Design ARIMS: 200A Disposition: Maintain for 15yrs after construction.

W912QR24B0014_Specs_Vol3-0000

This page intentionally left blank.

VOLUME OF SPECIFICATIONS

VOLUME I

DIVISION 00 – PROCUREMENT AND CONTRACTING

REQUIREMENTS

DIVISION 01 – GENERAL REQUIREMENTS

DIVISION 02 – EXISTING CONDITIONS

DIVISION 03 – CONCRETE

DIVISION 04 – MASONRY

DIVISION 05 – METALS

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

DIVISION 07 – THERMAL AND MOISTURE PROTECITON

VOLUME II

DIVISION 08 – OPENINGS

DIVISION 09 – FINISHES

DIVISION 10 – SPECIALTIES

DIVISION 12 – FURNISHINGS

DIVISION 13 – SPECIAL CONSTRUCTION

DIVISION 21 – FIRE SUPPRESSION

DIVISION 22 – PLUMBING

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

(HVAC)

DIVISION 25 – INTEGRATED AUTOMATION

VOLUME III

DIVISION 26 – ELECTRICAL

DIVISION 27 – COMMUNICATIONS

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

DIVISION 31 – EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

DIVISION 33 – UTILITIES

This page intentionally left blank.

496418 Logistics Readiness Complex Grissom Air Reserve Base, IN

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 06 04/21, CHG 1: 06/23 SPECIAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK

01 32 01.00 06 10/23 PROJECT SCHEDULE

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 29.00 06 11/17 SUSTAINABILITY REPORTING

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 45 35 11/20 SPECIAL INSPECTIONS

01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING

01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND

PERMITS

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 23 05/23 OPERATION AND MAINTENANCE DATA

01 91 19 05/2023 BUILDING ENCLOSURE COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DECONSTRUCTION

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 6: 11/23 CAST-IN-PLACE CONCRETE

03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR

BELOW GRADE CONSTRUCTION

03 45 00 05/16, CHG 2: 11/21 PRECAST ARCHITECTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

05 05 23.16 08/18 STRUCTURAL WELDING

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 50 14 08/18 STRUCTURAL METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

DOCUMENT PROJECT Page 1

CERTIFIED FINAL SUBMITTAL

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 08/23 BITUMINOUS DAMPPROOFING

07 21 13 08/23 BOARD AND BLOCK INSULATION

07 21 16 08/23 MINERAL FIBER BLANKET INSULATION

07 22 00 08/23 ROOF AND DECK INSULATION

07 27 10 08/23 BUILDING AIR BARRIER SYSTEM

07 27 19.01 08/23 SELF-ADHERING AIR BARRIERS

07 42 13 05/11, CHG 2: 02/18 METAL WALL AND SOFFIT PANELS

07 54 19 08/23 POLYVINYL-CHLORIDE ROOFING

07 60 00 08/23 FLASHING AND SHEET METAL

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/23 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS

08 34 59 08/08, CHG 1: 11/12 VAULT DOORS

08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS

08 45 23 05/19 INSULATED TRANSLUSCENT FIBERGLASS

SANDWICH PANEL WALL SYSTEM

08 51 13 05/19 ALUMINUM WINDOWS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL LOUVERS

DIVISION 09 - FINISHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 68 00 11/17, CHG 2: 08/20 CARPETING

09 90 00 02/21 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 21 13 08/20 TOILET COMPARTMENTS

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 21 00 08/17, CHG 2: 11/18 WINDOW BLINDS

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 08/20, CHG 1: 02/21 PRE-ENGINEERED METAL BUILDING SYSTEM

DOCUMENT PROJECT Page 2

DIVISION 21 - FIRE SUPPRESSION

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 13 16 08/20 DRY PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

22 31 00 02/09 WATER SOFTENERS, CATION-EXCHANGE

(SODIUM CYCLE)

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 93.00 06 08/16 TESTING, ADJUSTING, AND BALANCING

(TAB) OF HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 11 20 05/20 FACILITY GAS PIPING

23 23 00 08/21 REFRIGERANT PIPING

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 35 19.00 20 02/10, CHG 2: 08/18 INDUSTRIAL VENTILATION AND EXHAUST

23 52 00 04/08, CHG 5: 11/19 HEATING BOILERS

23 64 26 08/09, CHG 6: 11/22 CHILLED, CHILLED-HOT, AND CONDENSER

WATER PIPING SYSTEMS

23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 81 47 08/08, CHG 4: 08/18 WATER-LOOP AND GROUND-LOOP HEAT PUMP

SYSTEMS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - DDC

25 05 11.02 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - FIRE ALARM AND MASS

NOTIFICATION SYSTEMS

25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM

(UMCS) FRONT END AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 05 73 08/23 POWER SYSTEM STUDIES

26 08 00 11/22 APPARATUS INSPECTION AND TESTING

26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM

26 24 13 08/21 SWITCHBOARDS

26 27 13.10 30 10/07, CHG 2: 08/18 ELECTRIC METERS

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY

15-2500 KW, WITH AUXILIARIES

26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND

DOCUMENT PROJECT Page 3

BY-PASS/ISOLATION SWITCH

26 41 00 08/23 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

27 41 00 11/21 AUDIO-VISUAL SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 08/23 ELECTRONIC SECURITY SYSTEM ACCEPTANCE

TESTING

28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00.00 06 07/18 EARTHWORK

31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK

31 21 13 11/18 RADON MITIGATION

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE AND

RIGID PAVING

32 11 23.23 08/22 BASE COURSE DRAINAGE LAYERS

32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND

ORNAMENTAL) AND GATES

32 92 19 08/17, CHG 1: 08/21 SEEDING

32 92 23 04/06, CHG 1: 08/21 SODDING

DIVISION 33 - UTILITIES

33 05 23.13 11/19 UTILITY HORIZONTAL DIRECTIONAL DRILLING

33 11 00 02/18, CHG 2: 11/23 WATER UTILITY DISTRIBUTION PIPING

33 11 23 11/09, CHG 1: 08/17 NATURAL GAS AND LIQUID PETROLEUM PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 31 23.00 10 08/18 SANITARY SEWER FORCE MAIN PIPING

33 32 16 11/19, CHG 1: 11/23 PACKAGED UTILITY WASTEWATER PUMPING

STATIONS

33 40 00 11/21 STORMWATER UTILITIES

33 51 15 08/19 NATURAL-GAS / LIQUEFIED PETROLEUM GAS

DISTRIBUTION PIPELINES

33 61 14 02/10 EXTERIOR BURIED PREINSULATED WATER

PIPING

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DOCUMENT PROJECT Page 4

-- End of Project Table of Contents --

DOCUMENT PROJECT Page 5

THIS PAGE INTENTIONALLY LEFT BLANK

DOCUMENT PROJECT Page 6

SECTION 23 05 93.00 06

TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC

08/16

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASSOCIATED AIR BALANCE COUNCIL (AABC)

AABC MN-1 (2002; 6th ed) National Standards for Total System Balance

NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)

NEBB PROCEDURAL STANDARDS (2005) Procedural Standards for Testing, Adjusting and Balancing (TAB) of Environmental Systems

SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION

(SMACNA)

SMACNA 1780 (2002) HVAC Systems - Testing, Adjusting and Balancing, 3rd Edition

SMACNA 1972 CD (2012) HVAC Air Duct Leakage Test Manual - 2nd Edition

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with LRL Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

TAB Schematic Drawings and Report Forms ; G

Submit TAB Schematic Drawings and Report Forms no later than 21 calendar days prior to the start of TAB field work. Submit three hard copies and an electronic copy.

SD-03 Product Data

TAB Related HVAC Submittals

Submit an electronic copy of a list of the TAB Related HVAC Submittals, no later than 7 calendar days after the approval of the TAB Specialist.

SECTION 23 05 93.00 06 Page 1

Duct Air Leakage Test Procedures ; G

Submit Duct Air Leakage Test Procedures no later than 21 calendar days prior to the start of duct air leakage tests. Submit three hardcopies and one electronic copy.

TAB Procedures ; G

Submit TAB Procedures concurrent with the TAB Schematic Drawings and Report Forms. Submit three hard copies and an electronic copy.

Calibrations ; G

Submit Calibration concurrent with the TAB Schematic Drawings and Report Forms. Submit three hard copies and an electronic copy.

Duct Air Leakage Tests

Submit proposed date and time to begin the Duct Air Leakage Tests, no later than 7 calendar days prior to the start of the Systems Readiness Check.

Systems Readiness Check

Submit proposed date and time to begin the Systems Readiness Check, no later than 7 calendar days prior to the start of the Systems Readiness Check.

TAB Field Work ; G

Submit proposed date and time to begin TAB field work concurrent with the Systems Readiness Check Report.

TAB Verification ; G

Submit proposed date and time to begin the TAB Verification, concurrent with the Draft TAB Report.

SD-06 Test Reports

Design Review Report ; G, AE

Submit the Design Review Report no later than 14 calendar days after approval of the TAB Firm and the TAB Specialist. Submit one hard copy and an electronic copy.

Draft Duct Air Leakage Test Report ; G

Submit the one hardcopy and an electronic copy of the Draft Duct Air Leakage Test Report no later than 7 calendar days after completion of duct air leakage testing.

Final Duct Air Leakage Test Report ; G

Submit three hardcopies and an electronic copy of the Final Duct Air Leakage Test Report no later than 7 calendar days after completion of duct air leakage acceptance test.

Systems Readiness Check Report ; G

SECTION 23 05 93.00 06 Page 2

Submit the Systems Readiness Check Report at least 14 calendar days prior to the start of TAB Field Work. Submit three hard copies and an electronic copy.

Draft TAB Report ; G

Submit completed Draft TAB Report electronically no later that 7 calendar days after completion of all TAB field work. Submit one hard copy and an electronic copy.

Final TAB Report ; G

Submit three hard copies and an electronic copy of the Final TAB Reports no later that 7 calendar days after successful completion of TAB Verification. Submit three hard copies and an electronic copy.

SD-07 Certificates

TAB Firm ; G

Submit certification of the proposed TAB Firm's qualifications by either AABC, NEBB, or TABB to perform the duties specified herein and in other related Sections, no later than 21 calendar days after the Notice to Proceed. The documentation shall include the date that the Certification was initially granted and the date that the current Certification expires. Submit three hard copies and one electronic copy.

TAB Specialist ; G

Submit certification of the proposed TAB Specialist's qualifications by either AABC, NEBB, or TABB to perform the duties specified herein and in other related Sections, no later than 21 calendar days after the Notice to Proceed. The documentation shall include the date that the Certification was initially granted and the date that the current Certification expires.

Submit three hard copies and an electronic copy.

1.3 SIMILAR TERMS

In some instances, terminology differs between the Contract and the TAB Standard primarily because the intent of this Section is to use the industry standards specified, along with additional requirements listed herein to produce optimal results. The following table of similar terms is provided for clarification only. Contract requirements take precedent over the corresponding AABC, NEBB, or TABB requirements where differences exist.

SIMILAR TERMS

Contract Term AABC Term NEBB Term TABB Term

TAB Standard National Standards for Procedural Standards SMACNA's Testing and Balancing for Testing, Adjusting, Procedures Heating, Ventilating, and Balancing of and Air Conditioning Environmental Systems.

SECTION 23 05 93.00 06 Page 3

SIMILAR TERMS

Systems

TAB Specialist TAB Engineer TAB Supervisor TAB Supervisor

Systems Construction Phase Field Readiness Field Readiness Inspection Check & Preliminary Readiness Check Field Procedures. Check & Prelim.

Field Procedures

1.3.1 Work Description

Perform Duct Air Leakage Testing (DALT) and Testing, Adjusting, and Balancing (TAB) of the new heating, ventilation, and cooling (HVAC) air and water distribution systems.

Conduct Duct Air Leakage Testing in compliance with the requirements specified in SMACNA 1972 CD, except as supplemented and modified by this section.

1.4 TAB STANDARD

Perform TAB in accordance with the requirements of the TAB procedural standard recommended by the TAB trade association that approved the TAB Firm's qualifications, i.e. AABC MN-1, NEBB PROCEDURAL STANDARDS, or SMACNA 1780 as supplemented and modified by this specification section.

Comply with all recommendations and suggested practices contained in the TAB procedural standards. Use the provisions of the TAB Standard, including checklists, report forms, etc., as nearly as practical, to satisfy the Contract requirements. The TAB Standard shall be used for all aspects of TAB, including qualifications for the TAB Firm and Specialist and calibration of TAB instruments. Where the instrument manufacturer calibration recommendations are more stringent than those listed in the TAB Standard, adhere to the manufacturer's recommendations.

All quality assurance provisions of the TAB Standard such as performance guarantees are part of this contract. For systems or system components not covered in the TAB Standard, TAB procedures must be developed by the TAB Specialist. Where new procedures, requirements, etc., applicable to the Contract requirements have been published or adopted by the body responsible for the TAB Standard used (AABC, NEBB, or TABB), the requirements and recommendations contained in these procedures and requirements are mandatory.

1.5 QUALIFICATIONS

1.5.1 TAB Firm

The TAB Firm must be either a member of AABC or certified by the NEBB or the TABB and certified in all categories and functions where measurements or performance are specified on the plans and specifications, including TAB of environmental systems.

The certification must be maintained for the entire duration of duties specified herein. If, for any reason, the firm loses subject

SECTION 23 05 93.00 06 Page 4 certification during this period, immediately notify the Contracting Officer and submit another TAB Firm for approval. Any firm that has been the subject of disciplinary action by either the AABC, the NEBB, or the TABB within the five years preceding Contract Award is not eligible to perform any duties related to the HVAC systems, including TAB. All work specified in this section and in other related sections to be performed by the TAB Firm is invalid if the TAB Firm loses its certification prior to Contract completion and must be performed by an approved successor.

These TAB services are to assist the prime Contractor in performing the quality oversight for which it is responsible. The TAB Firm must be a subcontractor of the prime Contractor and shall be financially and corporately independent of the mechanical subcontractor, and shall report to and be paid by the prime Contractor.

1.5.2 TAB Specialist

The TAB Specialist must be either a member of AABC, an experienced technician of the Firm certified by the NEBB, or a Supervisor certified by the TABB. The certification must be maintained for the entire duration of duties specified herein. If, for any reason, the Specialist loses subject certification during this period, immediately notify the Contracting Officer and submit another TAB Specialist for approval. Any individual that has been the subject of disciplinary action by either the AABC, the NEBB, or the TABB within the five years preceding Contract Award is not eligible to perform any duties related to the HVAC systems, including TAB. All work specified in this section and in other related sections performed by the TAB Specialist is invalid if the TAB Specialist loses its certification prior to Contract completion and must be performed by the approved successor.

1.6 TAB SPECIALIST RESPONSIBILITIES

All TAB work specified herein and in related sections must be performed under the direct guidance of the TAB Specialist. The TAB specialist is required to be onsite on a daily basis to direct TAB efforts. The TAB Specialist shall participate in the commissioning process specified in LRL Section 01 46 00.00 06 TOTAL BUILDING COMMISSIONING (CONTRACTOR CxA).

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 DESIGN REVIEW

The TAB Specialist must review the Contract Plans and Specifications and identify, in a Design Review Report, any deficiencies that would prevent the effective and accurate TAB of the system. In the Design Review Report , the TAB Specialist shall individually list each deficiency and the corresponding proposed corrective action necessary for proper system operation. State that no deficiencies are evident if that is the case.

3.2 TAB RELATED HVAC SUBMITTALS

The TAB Specialist must prepare a list of the submittals from the Contract Submittal Register that relate to the successful accomplishment of all HVAC TAB. Accompany the submittals identified on this list shall be accompanied by a letter certifying that submitted equipment will allow proper testing, adjusting, and balancing of the HVAC systems. The letter

SECTION 23 05 93.00 06 Page 5 must be signed and dated by the TAB Specialist when submitted to the Government. The TAB Specialist must also ensure that the location and details of ports, terminals, connections, etc., necessary to perform TAB are identified on the submittals.

3.3 TAB SCHEMATIC DRAWINGS AND REPORT FORMS

Provide TAB Schematic Drawings showing each system component, including balancing devices, for each system. Include the following on TAB Schematic Drawings:

a. Location of all air terminal devices including supply, return, exhaust, and transfer devices.

b. A unique number or mark for each piece of equipment or terminal cross-referenced to the report forms and procedures.

c. Locations of air balancing dampers.

d. Air quantities at each air terminal.

e. Air quantities and temperatures in air handling unit schedules.

f. Intended location of all traverse, static pressure readings, and other testing points with a keying scheme cross-referenced to the TAB report forms and procedures.

g. Water quantities and temperatures in thermal energy transfer equipment schedules.

h. Water quantities and heads in pump schedules.

i. Water flow measurement fittings and balancing fittings.

Provide TAB Report Forms intended for use in preparing the TAB Report.

Include the following information in the TAB Report Forms:

a. Design data obtained from contract drawings, specifications, and approved submittals.

b. Notations detailing additional data to be obtained from the contract site by the TAB Specialist.

c. Designate the actual data to be measured.

d. Identifiers for each measured item and piece of equipment or terminal cross-referenced from TAB Schematic Drawings.

e. Provide a list of the types of instruments, and the measuring range of each, which are anticipated to be used. By means of a keying scheme, specify on each TAB report form submitted, which instruments will be used for measuring each item. If selection of which instrument to use will be made in the field, specify from which instruments the choice will be made. Place the instrument key number in the blank space where the measured data would be entered.

3.4 TAB Procedures

Provide step by step procedures for each measurement required during TAB.

SECTION 23 05 93.00 06 Page 6

Provide a separate section for each system. Include measures to ensure that each system performs as specified in all operating modes, interactions with other components (such as exhaust fans, kitchen hoods, fume hoods, relief vents, etc.) and systems, and with all seasonal operating differences, diversity, simulated loads, and pressure relationships required.

3.5 Calibrations

Provide a list of each instrument to be used during TAB, stating calibration requirements required or recommended by both the TAB Standard and the instrument manufacturer and the actual calibration history of the instrument, submitted with the TAB Procedures. The calibration history shall include dates calibrated, the qualifications of the calibration laboratory, and the calibration procedures used.

3.6 Duct Air Leakage Tests

3.6.1 Duct Air Leakage Test Procedures

The TAB Specialist must prepare and provide step by step procedures for duct air leakage testing. Procedures must comply with SMACNA 1972 CD.

Perform duct air leakage tests for ductwork over 3-inch water gauge static pressure. Despite specification of SMACNA 1972 CD to the contrary, duct air leakage tests must be performed for ductwork with a construction class of 3-inch water gauge static pressure and below if indicated on the drawings. Use the duct class, seal class, leakage class, and the leak test pressure data indicated on the drawings or as specified. Include a list of each instrument to be used during duct air leakage testing, stating the calibration requirements required or recommended by both the TAB standard and the instrument manufacturer and the actual calibration history of the instrument. The calibration history shall include dates calibrated, the qualifications of the calibration laboratory, and the calibration procedures used.

3.6.2 Ductwork to be Leakage Tested

The Contracting Officer's Representative will randomly select section of each completed duct system for testing by the TAB Firm. Coordinate scheduling of selection of duct sections for duct air leakage tests with the Contracting Officer's Representative. The sections selected will not exceed 20 percent of the total measured linear footage of the duct systems indicated as subject to duct air leakage testing. Sections of duct systems subject to duct air leakage testing will include 20 percent of main ducts, branch main ducts, branch ducts, and plenums for supply, return, exhaust, and plenum ductwork. It is acceptable for the entire system to be duct air leakage tested instead of disassembling that system in order to test only the 20 percent portion.

3.6.3 Duct Air Leakage Testing

The TAB Specialist must perform duct air leakage test on each system as selected by the Contracting Officer's Representative only after Duct Air Leakage Test Procedures have been submitted and approved. Complete duct air leakage test work within 48 hours after the particular ductwork was selected for testing by the Contracting Officer's Representative. Comply with approved Duct Air Leakage Test Procedures and SMACNA 1972 CD.

Provide all instruments, consumables, and personnel required to accomplish the Duct Air Leakage field work. Calibrate and maintain instruments in

SECTION 23 05 93.00 06 Page 7 accordance with manufacturer's written procedures. It is the contractor's responsibility to provide and install test ports as necessary for the duct air leakage tests. If the required conditions cannot be met during testing due to design or installation deficiencies, immediately notify the Contracting Officer's representative and provide written notice describing the deficiency and recommended corrections. The Contractor is responsible for correction of installation deficiencies.

3.6.4 Draft Duct Air Leakage Test Report

Following completion of the duct air leakage test work, prepare a Draft Duct Air Leakage Test Report using report forms shown in SMACNA 1972 CD.

The TAB Specialist must furnish the data required by the report forms.

Include a marked duct shop drawing identifying each section of duct tested with assigned node numbers for each section. Include node numbers in the completed report forms to identify each duct section. The TAB Specialist must certify the report. Include all calculations prepared in determining the duct surface of area of each duct test section. Include calibration curve for each of the test orifices used for testing. List instruments actually used to measure the data including the instruments unique identification number, calibration date, and calibration expiration date.

3.6.5 Duct Air Leakage Acceptance Test

In the presence of the Contracting Officer's Representative, verify, through retesting, 50 percent of the test data reported in the Draft Duct Air Leakage Test Report. If any data in the Draft Duct air Leakage Test Report is out-of-tolerance, perform acceptance testing on one additional duct section in the presence of the Contracting Officer's Representative.

If any of the duct sections checked for a given system are determined to have a leakage rate measured that exceeds the leakage rate allowed by SMACNA 1972 CD for an indicated duct construction class and sealant class, terminate data checking for that section. The associated draft report data will be disapproved. Make the necessary corrections and prepare a revised Draft Duct Air Leakage Test Report. Reschedule acceptance testing of the revised report data with the Contracting Officer's Representative.

At the sole discretion of the Government and with written concurrence from the Contracting Officer, the Contracting Officer's Representative may witness 100 percent of the Duct Air Leakage Tests in order to eliminate the requirement for Duct Air Leakage Acceptance Testing. In such a case, the Draft Duct Air Leakage Test Report serves as the Final Duct Air Leakage Test Report.

3.6.6 Final Duct Air Leakage Test Report

After successful completion of all duct air leakage acceptance testing, submit the Final Duct Air Leakage Test Report. Include all information from the Draft Duct Air Leakage Test Report updated to include final test data.

3.7 Systems Readiness Check

The TAB Specialist must inspect each system to ensure that it is complete, including installation and operation of controls, and that all aspects of the facility that have any bearing on the HVAC systems, including installation of ceilings, walls, windows, doors, and partitions, are complete in accordance with the applicable TAB standard and to the extent that TAB results will not be affected by any detail or touch-up work

SECTION 23 05 93.00 06 Page 8 remaining. The TAB Specialist must also verify completion of all items necessary to perform TAB such as ductwork and piping ports, terminals, connections, etc. Provide a Systems Readiness Check Report , signed by the TAB Specialist, that certifies that all work necessary to perform TAB field work has been completed and includes checklists used to verify completion.

3.8 TESTING, ADJUSTING, AND BALANCING

3.8.1 Preliminary Procedures

Begin testing, adjusting, and balancing field work only after TAB Schematic Drawings and Report Forms, TAB Procedures, the Final Duct Air Leakage Test Report, the Building Air Barrier Air Leakage Test and Diagnostic Test Reports, and the Systems Readiness Check Report have been submitted and approved. It is the responsibility of the contractor to provide and install test ports as necessary for the TAB field work.

3.8.2 TAB Field Work

Test, adjust, and balance the HVAC systems until measured air and water flow rates are within plus or minus 5 percent of the design flow rates as specified or indicated on the contract documents. Test, adjust, and balance outdoor air supply flow to plus 10% and minus 0% percent and exhaust flow to plus 0% and minus 10% of design flow rates specified or indicated on the contract documents. Adjust balancing valves, dampers, and sheaves and change out fan sheaves and fan impellers as necessary to obtain the specified or indicated air and water flow rates. Comply with the requirements of the TAB Standard except as supplemented and modified by this section. Where possible, use "industry standard" adjusting and balancing techniques which would result in the greatest energy savings, such as adjusting the speed of a fan instead of throttling the flow.

Provide all instruments and consumables required to accomplish the TAB work. Calibrate and maintain instruments in accordance with manufacturer's written procedures. If the design flow rates cannot be attained due to design or installation deficiencies, immediately notify the Contracting Officer's representative and provide written notice describing the deficiency and recommended corrections. The Contractor is responsible for correction of installation deficiencies.

3.8.2.1 Units with Coils

Perform and report heating and cooling performance capacity tests for hot water, chilled water, DX, and steam coils for the purpose of verifying that the coils meet the indicated design capacity. Determine entering and leaving wet and dry bulb temperatures by single point measurement for units with capacities up to and including 7.5 tons or 90,000 Btu.

Determine entering and leaving wet and dry bulb temperatures by the average of multiple readings, in accordance with AABC MN-4, procedure "Coil Capacity Testing" for units over 7.5 tons or 90,000 Btu. Submit part-load data from the coil manufacturer converting test conditions to design conditions to verify coils meet intended design capacity in accordance with AABC MN-4, Procedure Coil Capacity Testing, Actual Capacity vs. Design Capacity. Record the outdoor and indoor ambient dry and wet bulb temperature ranges within which the report data was recorded;

record temperatures and the beginning and end of data taking.

SECTION 23 05 93.00 06 Page 9

3.8.2.2 Refrigeration Equipment

Measure and report data as indicated in NEBB Form TAB 15-83, NEBB PROCEDURAL STANDARDS, including refrigeration operational data for equipment using refrigerant such as compressors, condensers, condensing units, evaporators, and chillers. Record outdoor ambient dry and wet bulb temperature ranges within which the report data was recorded.

3.9 TAB Report

3.9.1 Draft TAB Report

Provide a Draft TAB Report demonstrating successful completion of the TAB field work using the approved TAB Report Forms. Include a separate section for each system. Include a copy of the approved TAB Schematic Drawings and TAB Related Submittals such as pump curves and fan curves.

Mark, on the performance curves and tables, the operating points measured during successful TAB field work and the theoretical operating points listed in the approved submittals. Note any deficiencies outside of normal adjustments and balancing during TAB field work including a description of the corrective action performed to bring the measurement into the specified tolerance. If the TAB Specialist determines during TAB field work that any contract requirements cannot be met, include a written description of the deficiency and the corresponding proposed corrective action necessary for proper system operation.

3.9.2 Final TAB Report

Provide a Final TAB Report following TAB Verification. The Final TAB Report includes all information from the Draft TAB Report, updated to show results from any rework performed following successful TAB Verification.

Include data recorded and any changes or differences from the Draft TAB Report discovered during TAB Verification. All items in the TAB Report shall be signed by the TAB Specialist and shall bear the seal of the Professional Society or National Association used as the TAB Standard.

3.10 TAB Verification

Begin TAB Verification only after submission and approval of the Draft TAB Report. The TAB Specialist must recheck ten percent of the measurements listed in the Draft Tab Report. The measurements selected for verification and the individuals that witness the verification will be selected by the Contracting Officer's Representative (COR). The measurements will be recorded in the same manner as required for the TAB Report. If over 20 percent of the measurements selected by the COR for verification fall outside of plus to minus 5 percent of the Draft TAB Report data, the COR will select an additional ten percent for verification. If over 20 percent of the total tested (including both test groups) fall outside plus to minus 5 percent of the Draft TAB Report data, the TAB Report shall be considered invalid and all contract TAB field work shall be repeated beginning with the Systems Readiness Check. Correct all items outside of the required tolerance.

The Contractor shall be responsible for all necessary insulation repair following completion of TAB Verification.

3.11 Marking of Setting

Following approval of TAB Verification Report, the setting of all HVAC

SECTION 23 05 93.00 06 Page 10 adjustment devices including valves, splitters, and dampers shall be permanently marked by the TAB Specialist so that adjustment can be restored if disturbed at any time. Marking shall be visible following completion or repair of insulation.

3.12 Identification of Test Ports

The TAB Specialist shall permanently and legibly identify the location points of duct test ports. If the ductwork has exterior insulation, the identification shall be made on the exterior side of the insulation. All penetrations through ductwork and ductwork insulation shall be sealed to prevent air leakage or to maintain integrity of vapor barrier.

-- End of Section --

SECTION 23 05 93.00 06 Page 11

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 23 05 93.00 06 Page 12

SECTION 23 07 00

THERMAL INSULATION FOR MECHANICAL SYSTEMS

02/13, CHG 7: 05/20

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. At the discretion of the Government, the manufacturer of any material supplied will be required to furnish test reports pertaining to any of the tests necessary to assure compliance with the standard or standards referenced in this specification.

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING

ENGINEERS (ASHRAE)

ASHRAE 90.1 - IP (2019) Energy Standard for Buildings Except Low-Rise Residential Buildings

ASHRAE 90.2 (2018; Addenda A-B 2021; Addenda D 2022;

Addenda C 2023; Addenda F 2023) Energy-Efficient Design of Low-Rise Residential Buildings

ASTM INTERNATIONAL (ASTM)

ASTM A167 (2011) Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip

ASTM A240/A240M (2023) Standard Specification for Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications

ASTM A580/A580M (2023) Standard Specification for Stainless Steel Wire

ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate

ASTM C195 (2007; R 2013) Standard Specification for Mineral Fiber Thermal Insulating Cement

ASTM C450 (2008) Standard Practice for Fabrication of Thermal Insulating Fitting Covers for NPS Piping, and Vessel Lagging

ASTM C533 (2017; R 2023) Standard Specification for Calcium Silicate Block and Pipe Thermal Insulation

ASTM C534/C534M (2023) Standard Specification for Preformed Flexible Elastomeric Cellular

SECTION 23 07 00 Page 1

Thermal Insulation in Sheet and Tubular Form

ASTM C547 (2022a) Standard Specification for Mineral Fiber Pipe Insulation

ASTM C552 (2022) Standard Specification for Cellular Glass Thermal Insulation

ASTM C591 (2022) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation

ASTM C610 (2017; R 2023) Standard Specification for Molded Expanded Perlite Block and Pipe Thermal Insulation

ASTM C647 (2008; R 2013) Properties and Tests of Mastics and Coating Finishes for Thermal Insulation

ASTM C755 (2019b) Standard Practice for Selection of Water Vapor Retarders for Thermal Insulation

ASTM C795 (2008; R 2023) Standard Specification for Thermal Insulation for Use in Contact with Austenitic Stainless Steel

ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants

ASTM C921 (2010; R 2015) Standard Practice for Determining the Properties of Jacketing Materials for Thermal Insulation

ASTM C1126 (2018) Standard Specification for Faced or Unfaced Rigid Cellular Phenolic Thermal Insulation

ASTM C1136 (2023) Standard Specification for Flexible, Low Permeance Vapor Retarders for Thermal Insulation

ASTM C1710 (2011) Standard Guide for Installation of Flexible Closed Cell Preformed Insulation in Tube and Sheet Form

ASTM D882 (2012) Tensile Properties of Thin Plastic Sheeting

ASTM D2863 (2019) Standard Test Method for Measuring the Minimum Oxygen Concentration to Support Candle-Like Combustion of Plastics (Oxygen Index)

ASTM D5590 (2017; R 2021) Standard Test Method for Determining the Resistance of Paint Films and Related Coatings to Fungal Defacement

SECTION 23 07 00 Page 2 by Accelerated Four-Week Agar Plate Assay

ASTM E84 (2023) Standard Test Method for Surface Burning Characteristics of Building Materials

ASTM E96/E96M (2022a; E 2023) Standard Test Methods for Gravimetric Determination of Water Vapor Transmission Rate of Materials

ASTM E2231 (2021) Standard Practice for Specimen Preparation and Mounting of Pipe and Duct Insulation Materials to Assess Surface Burning Characteristics

CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)

CDPH SECTION 01350 (2017; Version 1.2) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers

FM GLOBAL (FM)

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/

GREEN SEAL (GS)

GS-36 (2013) Adhesives for Commercial Use

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)

ISO 2758 (2014) Paper - Determination of Bursting Strength

MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS

INDUSTRY (MSS)

MSS SP-58 (2018) Pipe Hangers and Supports - Materials, Design and Manufacture, Selection, Application, and Installation

MIDWEST INSULATION CONTRACTORS ASSOCIATION (MICA)

MICA Insulation Stds (8th Ed) National Commercial & Industrial Insulation Standards

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 90A (2024) Standard for the Installation of Air Conditioning and Ventilating Systems

NFPA 90B (2024) Standard for the Installation of Warm Air Heating and Air Conditioning Systems

SECTION 23 07 00 Page 3

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS SCS Global Services (SCS) Indoor Advantage

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)

SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications

U.S. DEPARTMENT OF DEFENSE (DOD)

MIL-A-3316 (1987; Rev C; Am 2 1990) Adhesives, Fire-Resistant, Thermal Insulation

MIL-A-24179 (1969; Rev A; Am 2 1980; Notice 1 1987;

Notice 2 2020) Adhesive, Flexible Unicellular-Plastic Thermal Insulation

MIL-PRF-19565 (1988; Rev C) Coating Compounds, Thermal Insulation, Fire- and Water-Resistant, Vapor-Barrier

UNDERWRITERS LABORATORIES (UL)

UL 94 (2023; Reprint May 2023) UL Standard for Safety Tests for Flammability of Plastic Materials for Parts in Devices and Appliances

UL 723 (2020) UL Standard for Safety Test for Surface Burning Characteristics of Building Materials

UL 2818 (2022) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings

1.2 SYSTEM DESCRIPTION

1.2.1 General

Provide field-applied insulation and accessories on mechanical systems as specified herein; factory-applied insulation is specified under the piping, duct or equipment to be insulated. Furnish and install field applied insulation materials required for use on Government-furnished items as listed in the SPECIAL CONTRACT REQUIREMENTS.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

Submit the three SD types, SD-02 Shop Drawings, SD-03 Product Data, and SD-08 Manufacturer's Instructions at the same time for each system.

SD-02 Shop Drawings

SECTION 23 07 00 Page 4

MICA Plates ; G

Pipe Insulation Systems and Associated Accessories

Duct Insulation Systems and Associated Accessories

Equipment Insulation Systems and Associated Accessories

Recycled content for insulation materials ; S

SD-03 Product Data

Pipe Insulation Systems ; G

Duct Insulation Systems ; G

Equipment Insulation Systems ; G

SD-04 Samples

Thermal Insulation ; G

Display Samples ; G

SD-07 Certificates

Indoor air quality for adhesives ; S

SD-08 Manufacturer's Instructions

Pipe Insulation Systems

Duct Insulation Systems

Equipment Insulation Systems

1.4 CERTIFICATIONS

1.4.1 Adhesives and Sealants

Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body. When product does not have certification, provide validation that product meets the indoor air quality product requirements cited herein.

1.5 QUALITY ASSURANCE

1.5.1 Installer Qualification

Qualified installers will have successfully completed three or more similar type jobs within the last 5 years.

SECTION 23 07 00 Page 5

1.6 DELIVERY, STORAGE, AND HANDLING

Deliver materials in the manufacturer's unopened containers. Protect materials delivered and placed in storage from weather, humidity, dirt, dust and other contaminants. The Contracting Officer may reject insulation material and supplies that become dirty, dusty, wet, or contaminated by some other means. Attach manufacturer's stamp or label giving the name of the manufacturer and brand, and a description of the material, date codes, and approximate shelf life (if applicable) to packages or standard containers of insulation, jacket material, cements, adhesives, and coatings delivered for use, and samples required for approval. Insulation packages and containers must be asbestos free.

PART 2 PRODUCTS

2.1 STANDARD PRODUCTS

Provide materials which are the standard products of manufacturers regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening. Submit a complete list of materials, including manufacturer's descriptive technical literature, performance data, catalog cuts, and installation instructions. Include the product number, k-value, thickness and furnished accessories including adhesives, sealants and jackets for each mechanical system requiring insulation. The product data must be copyrighted, have an identifying or publication number, and have been published prior to the issuance date of this solicitation. Submit materials furnished under this section together in a booklet.

2.1.1 Insulation System

Provide insulation systems in accordance with the approved MICA National Insulation Standards plates as supplemented by this specification.

Provide field-applied insulation for heating, ventilating, and cooling (HVAC) air distribution systems and piping systems that are located within, on, under, and adjacent to buildings; and for plumbing systems.

Provide CFC and HCFC free insulation.

2.1.2 Surface Burning Characteristics

Unless otherwise specified, insulation must have a maximum flame spread index of 25 and a maximum smoke developed index of 50 when tested in accordance with ASTM E84. Determine flame spread, and smoke developed indexes, by ASTM E84 or UL 723 . Test insulation in the same density and installed thickness as the material to be used in the actual construction. Prepare and mount test specimens according to ASTM E2231.

2.2 MATERIALS

Provide insulation that meets or exceed the requirements of ASHRAE 90.2 .

Ensure insulation exterior is cleanable, grease resistant, non-flaking and non-peeling. Provide compatible materials that do not contribute to corrosion, soften, or otherwise attack surfaces to which applied in either wet or dry state. Use materials on stainless steel surfaces meeting ASTM C795 requirements. Do not use calcium silicate on chilled or cold water systems. Use asbestos free materials. Provide product recognized under UL 94 (if containing plastic) and listed in FM APP GUIDE.

SECTION 23 07 00 Page 6

2.2.1 Adhesives

Provide non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) that meet either emissions requirements of CDPH SECTION 01350 (limit requirements for either office or classroom spaces regardless of space type) or VOC content requirements of SCAQMD Rule 1168 (HVAC duct sealants must meet limit requirements of "Other" category within SCAQMD Rule 1168 sealants table).

Provide aerosol adhesives used on the interior of the building that meet either emissions requirements of CDPH SECTION 01350 (use the office or classroom requirements, regardless of space type) or VOC content requirements of GS-36. Provide certification or validation of indoor air quality for adhesives .

2.2.1.1 Mineral Fiber Insulation Cement

Provide cement in accordance with ASTM C195.

2.2.1.2 Lagging Adhesive

Lagging is the material used for thermal insulation , especially around a cylindrical object. This may include the insulation as well as the cloth/material covering the insulation. To resist mold/mildew, use lagging adhesive meeting ASTM D5590 with 0 growth rating. Provide nonflammable and fire-resistant lagging adhesives that have a maximum flame spread index of 25 and a maximum smoke developed index of 50 when tested in accordance with ASTM E84. Ensure adhesive is MIL-A-3316 , Class 1, pigmented white and suitable for bonding fibrous glass cloth to faced and unfaced fibrous glass insulation board; for bonding cotton brattice cloth to faced and unfaced fibrous glass insulation board; for sealing edges of and bonding glass tape to joints of fibrous glass board; for bonding lagging cloth to thermal insulation; or Class 2 for attaching fibrous glass insulation to metal surfaces. Apply lagging adhesives in strict accordance with the manufacturer's recommendations for pipe and duct insulation.

2.2.1.3 Contact Adhesive

Adhesives may be any of, but not limited to, the neoprene based, rubber based, or elastomeric type that have a maximum flame spread index of 25 and a maximum smoke developed index of 50 when tested in accordance with ASTM E84. Ensure adhesive does not adversely affect, initially or in service, the insulation to which it is applied, nor cause any corrosive effect on metal to which it is applied. Ensure that any solvent dispersing medium or volatile component of the adhesive has no objectionable odor and does not contain any benzene or carbon tetrachloride. Ensure dried adhesive does not emit nauseous, irritating, or toxic volatile matters or aerosols when the adhesive is heated to any temperature up to 212 degrees F . The dried adhesive must be nonflammable and fire resistant. Flexible Elastomeric Adhesive: Comply with MIL-A-24179 , Type II, Class I. Provide product listed in FM APP GUIDE.

2.2.2 Caulking

ASTM C920, Type S, Grade NS, Class 25, Use A.

2.2.3 Corner Angles

Nominal 0.016 inch aluminum 1 by 1 inch with factory applied kraft

SECTION 23 07 00 Page 7 backing. Aluminum must be ASTM B209, Alloy 3003, 3105, or 5005.

2.2.4 Fittings

Fabricated Fittings are the prefabricated fittings for flexible elastomeric pipe insulation systems in accordance with ASTM C1710.

Together with the flexible elastomeric tubes, they provide complete system integrity for retarding heat gain and controlling condensation drip from chilled-water and…

This is the start of the file's text. The full file is on GovTribe.