Demolition, Remediation and Restoration

Closed Solicitation Posted

Solicitation number
6913G626Q300030
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238910 Site Preparation Contractors
Place of performance
Clovis, California 93619, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Transportation, acting through the Volpe National Transportation Systems Center on behalf of the Federal Aviation Administration's Facilities Real Property Disposition program, seeks demolition, remediation, and restoration services at the CZQ VOR facility in Clovis, California, with proposals due June 17 and clarification questions due June 11, 2026. This is a total small business set-aside.

Place of performance is Clovis, California (coordinates 36.884322, -119.815140). The facility, constructed in 1985, comprises a prefabricated fiberglass equipment building, a 50-foot-diameter wood-frame roof structure, a 10-foot radome, concrete foundations, and associated infrastructure. The contractor must demolish and remove all structures and foundations to three feet below grade, remove all underground utilities and piping to three feet below grade, manage environmental hazards including a 500-gallon propane tank (which Suburban Propane will disconnect and remove prior to work start), remove gravel and access roads with on-site piling permitted, and restore the site with 0.5 feet of fill compacted to 95%. The FAA lease expires September 30, 2026, requiring all on-site work completed by September 1, 2026.

The procurement covers NAICS 238910 (Site Preparation Contractors) and PSC F999 (Other Environmental Services). Contract type is firm-fixed-price with a single CLIN 00100 fully funded at award. The contractor must submit a draft work plan within 10 business days of a kickoff meeting and a final work plan within 5 business days of government comment. All work must comply with Federal, State, and local requirements, with the contractor responsible for obtaining all permits. Work hours are Monday through Friday, 8:00 a.m. to 4:30 p.m., excluding federal holidays. Service Contract Act prevailing wage rates apply (Fresno County, California, Wage Determination 2015-5609). Award will be based on pricing (cost buildup), schedule, technical explanation, and past performance, in descending order of importance. The contracting officer is Roland Regan (617-494-3185, Roland.Regan@dot.gov).

Notice text

2 versions

Update #2 · Latest ·

Under an Interagency Agreement, the John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Real Property Disposition program. As part of these efforts, removal/demolition and related activities will be conducted at one Very High Frequency Omnidirectional Range (VOR) facility in the FAA’s Western Service Area (ESA). The demolition and related activities shall be performed at the FAA facilities listed below:

  • CZQ VOR – Clovis, CA (36.884322°, -119.815140°)

The FAA no longer uses the equipment/buildings at the above-listed facility. The property is leased and there are no co-located facilities, so the FAA plans to cancel the lease after the demolition and restoration activities take place. Prior to relinquishing this property the FAA plans to remove environmental hazards, demolish or remove certain onsite structures and infrastructure, and restore disturbed areas. 

The Contractor shall conduct all work in accordance with Federal, State and local requirements.  Where inconsistencies exist, the Contractor shall follow the most stringent requirement.  ​​The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey reports for the facilities scheduled for demolition.

See SOW for further details of requirement.

Update #1 ·

Under an Interagency Agreement, the John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Real Property Disposition program. As part of these efforts, removal/demolition and related activities will be conducted at one Very High Frequency Omnidirectional Range (VOR) facility in the FAA’s Western Service Area (ESA). The demolition and related activities shall be performed at the FAA facilities listed below:

  • CZQ VOR – Clovis, CA (38.884322°, -119.815140°)

The FAA no longer uses the equipment/buildings at the above-listed facility. The property is leased and there are no co-located facilities, so the FAA plans to cancel the lease after the demolition and restoration activities take place. Prior to relinquishing this property the FAA plans to remove environmental hazards, demolish or remove certain onsite structures and infrastructure, and restore disturbed areas. 

The Contractor shall conduct all work in accordance with Federal, State and local requirements.  Where inconsistencies exist, the Contractor shall follow the most stringent requirement.  ​​The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey reports for the facilities scheduled for demolition.

See SOW for further details of requirement.

Files

Show all 11

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors