This is a Clarifications Questions & Responses document for RFQ 6913G626Q3000030 dated June 12, 2026, addressing contractor inquiries regarding a demolition and gravel removal project.
The document addresses four key operational clarifications: (1) permit requirements are the contractor's responsibility, including verification of all required state and local permits; (2) gravel removed from the site may be stored in multiple locations as needed, rather than consolidated in a single area; (3) stockpile locations will be determined during site activities, with primary placement expected within or at the corners of the facility site plot and potentially along the access road if necessary; and (4) on-site personnel are not required to check in at an off-site location prior to accessing the demolition site, with all crew members meeting directly at the site each day. This document serves as supplementary guidance to the original RFQ for contractor proposal development and project planning purposes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 6913G626Q3000030 REQUIREMENT
CLARIFICATION QUESTIONS & RESPONSES
6/12/26
1) Question: Will a demolition permit be required either from the County or City authorities?
Response: Contractor's responsibility includes verifying all required state and local permits.
2) Question: Will Gravel being removed be stored in one single area all together?
Response: Gravel can be piled/stored in more than one location, if needed.
3) Question: Where will the gravel being removed and stockpiles be located onsite?
Response: Stockpiles will be determined during site activities. Most likely locations will be within, or in corner, of facility site plot, with potentially another pile along the access road, if necessary.
4) Question: Will crew need to check in off-site prior to accessing demo site.
Response: No, all on-site personnel will meet at the site each day.