This is a Site Survey Report for the Clovis Very High Frequency Omnidirectional Range (CZQ VOR) facility in Clovis, California, prepared by the Volpe Center for the Federal Aviation Administration's Real Property Disposition Program. The survey was conducted on April 13, 2026, to assess demolition and disposal requirements for the facility's equipment building and site features. The facility, constructed in 1985, consists of a prefabricated fiberglass building (10 ft. x 32 ft. x 10 ft.) with a steel framing base, a 50-foot diameter wood-frame roof structure with metal grate surface, a 10-foot diameter radome, and associated concrete foundations, utility infrastructure, and site improvements. The lease (DTFAWN-14-L-00015) expires on September 30, 2026, and requires full restoration of the site.

The proposed scope of work includes FAA removal of personal property and equipment prior to demolition (fluorescent light tubes, household cleaners, engine generator, and 18 backup batteries), environmental removal of a 500-gallon propane aboveground storage tank with underground fuel piping, and comprehensive demolition and disposal of all building structures, roof supports, concrete foundations, monitoring poles, transformer pads, bollards, and perimeter fencing. Full site restoration requires removal of all foundations and structures to three feet below grade with backfill and compaction, removal of all piping and utilities to three feet below grade, removal of gravel plot and access road (with on-site piling permitted), and uniform fill to 0.5 feet depth. The asbestos inspection survey identified no asbestos-containing materials in 18 samples analyzed. Environmental hazards identified include a utility-owned transformer and underground fuel storage system, requiring coordination with PG&E for power termination and transformer removal. Site access requires FAA or Volpe escort, and work is contingent upon FAA review and coordination.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Survey Report Clovis Very High Frequency Omnidirectional Range

(CZQ VOR)

Clovis, CA – May 2026 Site Survey JCN: 18065119 Demolition JCN: 24004884

Prepared for:

Federal Aviation Administration Real Property Disposition Program FAA National Headquarters 800 Independence Ave., SW Washington, DC 20591

Site Survey Report – CZQ VOR i

Contents Executive Summary.....................................................................................................................ii

1.0 Participants and Safety Information

2.0 Site Description

3.0 Utility Disposition

3.1 Demolition Disconnect Sketch

4.0 Hazardous Materials

5.0 Proposed Scope of Work

5.1 FAA Action Required Prior to Site Demolition

5.2 Environmental Removal and Disposal

5.3 Demolition, Removal, and Disposal

5.4 Restoration (Full Restore)

5.5 Notes

Figures and Appendices Figure 1 – Site Location Figure 2 – Site Layout

Appendix A – Site Photographs Appendix B – Asbestos Inspection Survey Appendix C – Property Lease Drawings

Site Survey Report – CZQ VOR ii

Executive Summary In support of the Federal Aviation Administration (FAA) Real Property Disposition Program, the United States Department of Transportation John A. Volpe National Transportation System Center (Volpe) has completed this Site Survey Report to include the results of the site survey conducted on April 13, 2026 at the Clovis (CZQ) Very High Frequency Omnidirectional Range (VOR) (Facility) located near Clovis, CA. The Facility’s equipment building and site features are to be demolished and removed from the site. The purpose of this site survey was to determine the level of effort required to demolish, remove, and dispose of all real property on-site as required by the terms of the lease.

This report documents current site conditions, equipment inventories, environmental information, and recommended disposition and demolition actions for the site. Operations and maintenance histories were reviewed to identify any potential environmental hazards. Identified and most recognizable environmental hazards are to be handled and disposed of in an environmentally compliant manner to minimize potential worker exposures, contamination to the environment, and to achieve regulatory compliance for proper removal, disposal, and restoration.

Several risks and safety concerns, such as working around FAA facilities and potential environmental hazards will be identified and addressed in the Risk Mitigation Plan prior to the start of demolition. The work schedule is contingent upon FAA review and coordination.

Site Survey Report – CZQ VOR 1

1.0 Participants and Safety Information

Coordination – List of Participants Name Organization Phone # E-mail

Katherine Ronckovitz FAA National Program Manager

703-819-1117 Katherine.E.Ronckovitz@faa.gov

Gerald Zellner SSC Manager 559-454-9810 Gerald.Zellner@faa.gov

Carlos Monsivais SSC Project Coordinator

559-454-9803 Carlos.Monsivais@faa.gov

Robert Sternik FAA RECO 206-231-3067 Robert.Sternik@faa.gov

Terrie CTR Manderson Real Estate Management Specialist

206-231-3117 Terrie.ctr.Manderson@faa.gov

Thomas “Derrick” Wilkerson Paul Wagner

FAA EOSH

907-371-0119 530-840-4704

Thomas.Wilkerson@faa.gov Paul.Wagner@faa.gov

Veronica Baron FAA WSA PIM 206-231-2889 Veronica.Baron@faa.gov

Bonnie Mulkey Technical Lead and WSA Analyst

206-231-2925 Bonnie.CTR.Mulkey@faa.gov

Evan Starr Volpe Surveyor 857-259-7538 Evan.Starr@dot.gov

Safety Information Name Title Phone # E-mail or Address Kaiser Permanente Fresno Medical Center

Nearest Hospital 559-448-4555 7300 N Fresno St.

Fresno, CA 93720

Evan Starr On-site Safety Officer

857-259-7538 Evan.Starr@dot.gov

Emergency Contact

911 -

Gerald Zellner SSC Manager 559-454-9810 Gerald.Zellner@faa.gov

Daniel Collura FAA Escort 559-454-9809 Daniel.A.Collura@faa.gov

Patrick C. Freedman FAA SECM 510-289-8113 Patrick.C.Freedman@dot.gov

Site Survey Report – CZQ VOR 2

2.0 Site Description

Site Information

Site Address

Access Road Gate: 36.884131, -119.811092 Nearest Address: 9300 Road 40 ½, Madera, CA 93638 Nearest Intersection: Road 40 ½ and Avenue 9 (Children’s Blvd.)

County: Madera

Coordinates 36°53'03.6"N 119°48'54.5"W (36.884322, -119.815140)

Site Elevation 360 ft.

Lease Information

Lease No.: DTFAWN-14-L-00015 Lessors: Sobaje Property Group, Inc.

And FH7, LLC Expiration: 09/30/2026 Restoration: Full Restore

Drawings Physical copies found in equipment building.

Co-Located N/A

Adjacent Property

The fenced-in site plot is located within an undeveloped larger property consisting of open fields. There are farms/vineyards located to the west and south, adjacent to the property. Valley Children’s Hospital is located 0.5 miles east of the site plot. Additional undeveloped or mixed-use commercial property is to the north.

Site Drainage and Run-off Site grounds are generally flat with the gravel plot improved from the open grass fields surrounding the plot. Runoff drains in all directions towards the surrounding field.

Site Grounds The site plot is improved with a gravel surface and perimeter fence with a gravel access road.

Site Specific Integrated Risk Management Plan

Site Access

Access is through a locked gate off Road 40 ½, which can be reached via Avenue 9/Children’s Blvd. From the east, Avenue 9/Children’s Blvd can be accessed via Exit 138 off Freeway 41 (Yosemite Fwy) and from the west, Avenue 9/Children’s Blvd. can be accessed via Exit 147 off Freeway 99.

Security Requirements FAA or Volpe escort is required for site access.

Badging and Insurance Requirements

No badging is required for this facility. Any site work requires FAA or Volpe Center onsite representatives.

Facility Reference Data File (FRDF) N/A

Confined Space N/A

Site Survey Report – CZQ VOR 3

Subcontractor Staging Area

The site has enough lay down for staging vehicles and equipment. The location and availability of staging area must be coordinated with the SSC prior to the start of any work.

Working Hours Work schedule will need to be determined. Work is anticipated to be completed during normal shift hours. Consideration for work hours, noise, traffic, and personal safety will be incorporated in the demolition work plan.

Environmental Screening Checklist Yes

ORMP No

7460-1 No

Permits

The contractor shall be responsible for obtaining any necessary licenses and permits, and for complying with any federal, state, county and municipal laws, codes, regulations, and fees or charges applicable to the performance of this work.

Earth Work Concrete foundations will be removed from the site plot and the gravel plot and access road will be removed. Backfill will be required to fill in foundation holes. See Section 5.0 for restoration requirements.

High Work No high work required.

Electrical Work

Power to the facility is active. A utility-owned transformer is located on the site plot, with underground power lines supplying main power to the transformer and from the transformer to the site building. The transformer will be terminated and removed by the utility company prior to facility demolition.

Any remaining wiring and conduit in the building is to be removed by the demolition contractor. Any belowground grounding or wiring is to be removed to a depth of 3 feet below the ground surface.

FAA Disposal Action Plan Dispose of excess inventory listed below through proper paperwork and disposal methods. This inventory to be removed includes the batteries and engine generator, located inside the engine generator room.

Site Facility

Equipment Building Type

Prefabricated fiberglass equipment building with steel framing base and roof-top radome

Size Building: 10 ft. x 32 ft. x 10 ft.

Radome: 10 ft. diameter base x 16 ft. tall

Building State Cond Fair Age Approx. 41 years (constructed 1985)

Site Survey Report – CZQ VOR 4

Building Entrance Type

Two concrete pads with metal step grates: main equipment room and engine generator room entrances

Size 2 pads: 5 ft. 6 in. x 5 ft. 6 in. x 6 in.

2 step grates: 4 ft. x 4 ft.

Building Foundation Type

-12 concrete sonotube building footings -1 concrete pad underneath E/G room with 6 concrete footings

Size

Building footings: 14 in.

diameter x 3 ft.

Pad: 4 ft. x 8 ft. x 6 in.

Pad footings: 14 in. diameter x 3 ft.

Roof Structure Type

Circular wood-frame roof structure with wood support poles and metal roof grate/surface.

Additional metal support poles around perimeter of roof

Size

- 50 ft. diameter roof

- 31 wood support poles (4

in. x 4 in. x 10 ft. tall)

- 31 concrete footers

(12 in. diameter x 3 ft.)

- 16 metal support poles

(4 in. x 4 in. x 10 ft. tall)

- 16 concrete footers (12 in.

diameter x 3 ft.)

Inventory Onsite - One monitoring pole in southeast corner of plot: 30 ft. tall tilt-down pole

- One monitoring pole foundation: concrete 2 ft. diameter x 4 ft. deep

- One utility-owned transformer unit (to be removed by PG&E)

- One transformer concrete foundation: 5 ft. x 6 ft. 8 in. x 1 ft.

- Twelve concrete-filled metal vehicle bollards, around transformer pad: 4 in.

diameter x 4 ft. tall

- Twelve bollard concrete foundations: 14 in diameter x 3 ft.

- One 500-gallon aboveground fuel storage tank (AST) concrete foundation: 6

ft. x 11 ft. x 6 in.

- Ten concrete-filled metal vehicle bollards, around AST: 4 in. diameter x 2 ft.

8 in. tall

- Ten bollard concrete foundations: 12 in. diameter x 3 ft.

- One fuel pipe, with underground piping from AST to E/G room

- One electric meter box, with underground power line fed from transformer

- Two building-mounted exhaust dampers

- Two exterior cabinets attached to south-side of building

- Two air-conditioner supports attached to exterior of building.

Site Survey Report – CZQ VOR 5

Inventory in Shelter Main Equipment Room:

- Two main power breaker panel boxes

- One air conditioner (A/C) control panel box

- One “telco” control panel box

- One TACAN control panel box

- One wall-mounted wood board with telco wiring attached

- One metal bookshelf

- One metal storage cabinet

- One wood-top metal work desk

- One wall-mounted wood corkboard

- Five equipment server cabinet racks with various electrical equipment

- One metal tool cabinet

- Two wall-mounted A/C units

- One wall-mounted heater unit

- Two ground control panels on wall

- Two thermostats

- One lightning control panel box

- One fire extinguisher

- Four overhead light fixtures with 16 fluorescent light bulbs

- One overhead light fixture with two fluorescent light bulbs

- Miscellaneous metal conduits and wiring

Engine Generator Room:

- One engine generator (to be removed by FAA)

- One large metal air intake/duct

- One metal exhaust pipe and insulation

- One metal exhaust damper

- One large exhaust damper with filter

- One E/G transfer switch box

- One E/G bypass switch box

- One small wood table

- One wall-mounted wood board

- One metal storage locker

- One power disconnect junction box

- One lightning control box

- One main power breaker panel box

- One metal battery rack

- 18 lead-acid batteries (to be removed by FAA)

- One wall-mounted A/C unit

- One fire extinguisher

- One spill kit

- One overhead light fixture with two fluorescent light bulbs

- Miscellaneous metal conduits, tools, and wiring.

Site Survey Report – CZQ VOR 6

Floor Tiles Color

Main Equipment Room:

Carpeted, no tiles.

E/G Room:

12” linoleum tiles, tan/beige

Quantity Approx. 120 sq. ft.

Sub Floor Materials Type Wood Size 10 ft. x 32 ft.

Fuel Storage Tank Cap. 500-gallon propane Manuf. J.B. Beaird Co.

Manufactured 1957

Perimeter Fence Type Plastic fencing with 48 fence posts Lin. Ft. 360 ft.

Plot Type Gravel Plot (to be removed and piled on-site)

Size 115 ft. x 115 ft. (extends beyond 90 ft. x 90 ft. fenced-in plot)

Access Road Type Gravel (to be removed and piled on-site)

Size 1,150 ft. long

Other Structures Type Former perimeter fence posts are situated within current fence perimeter. Includes concrete fence post foundations. Approx. 45 concrete foundations

Site Survey Report – CZQ VOR 7

3.0 Utility Disposition

Utility List Location Utility Company

Name Meter/Junction Box

Service is:

Power Power originates off-site and is fed underground to an on-site utility-owned transformer.

From there, power is supplied to the meter box adjacent to E/G room, via underground line.

PG&E Meter box is mounted on the exterior of the eastside of the E/G room.

Meter No.:

1010280371

Active

Action:

Power needs to be terminated, and PG&E will need to remove transformer and meter. Demo contractor will demolish and remove transformer pad, meter box, and remaining underground power lines, per restoration requirements.

Telecommunications Located in exterior cabinet mounted on south side of building.

Unknown Active

Action: FAA utility coordinator to terminate service. Demo contractor will remove exterior cabinet and wiring.

Natural Gas or Propane

Propane AST located on north side of plot

N/A N/A Active

Action: Demo contractor to remove AST and related piping.

Sewer, Storm, and Sanitary Systems

N/A N/A N/A N/A

Action: N/A Water N/A N/A N/A N/A

Action: N/A Fiber Optic N/A N/A N/A N/A

Action: N/A Counterpoise May be present underground N/A N/A N/A

Action: If grounding wires are identified within 3 ft. below the ground surface, they are to be removed by the demolition contractor.

Site Survey Report – CZQ VOR 8

3.1 Demolition Disconnect Sketch

Electrical Disconnect Sketch See Figure 2 for site layout. Power will be terminated by FAA utility coordinator and PG&E. The contractor will be responsible for removing any remaining electirical connections aboveground and any belowground to a depth of 3 ft.

Grounding Demolition Grounding may be present beneath the equipment building. If grounding wires are identified within 3 ft.

below the ground surface, they are to be removed by the demolition contractor.

4.0 Hazardous Materials

Recordkeeping, notifications, manifests, safety plans, and PPE will be kept by the subcontractor conducting the abatement/disposal work and provided to the FAA Project engineer with close out paperwork.

Environmental Issues (presence ☒ or absence ☐ of) Notes:

Tanks, piping 500-gallon propane AST and underground fuel line.

☐ Distressed vegetation ☒ Transformers Utility-owned transformer

☐ Staining / evidence of contaminated soil or concrete

☐ Sump pump system and interior drainage system (if chemicals were present a source for their migration off of the property)

☐ Metal or other trash items either semi buried or exposed, metal surfaces that could have lead paint, or be otherwise contaminated

☐ Adjacent water ways, ponds, lagoons, storm drains - drainage details

☐ Odors, mold, mildew

☐ Evidence of monitoring systems i.e., monitoring wells, boring caps…

Site Survey Report – CZQ VOR 9

Regulated Hazardous Materials Hazardous Material

Location Form Quantity Recommended Abatement

Disposal Plan

Volpe Action

PACM

None of the materials sampled during the survey were identified as ACM. Please see Appendix B.

N/A N/A N/A N/A N/A

PLBP Paint chip sample was collected from the white paint on the roof support pole and was non-detect for lead based paint.

N/A N/A N/A N/A N/A

Lead in soil Soil sampling was performed in 2018 and did not exceed FAA action levels for lead (200 mg/kg).

N/A N/A N/A N/A N/A

Suspect PCB-containing equipment and building materials

Light ballasts in building (unless otherwise marked).

Due to age of building and property history, PCB bulk materials sampling not required.

Light ballasts

20 To be disposed of in an environmentally compliant manner

Dispose of in accordance with federal, state, and local regulations

Provide disposal documentation

PCB in soil Due to age of building and property history, PCBs were not sampled in soil.

N/A N/A N/A N/A N/A

Household-type chemicals, cleaners, and miscellaneous

Equipment building Various sprays

Unknown number of containers.

Household-sized volumes

To be disposed of in an environmentally compliant manner

Dispose of in accordance with federal, state, and local regulations

Provide disposal documentation

Site Survey Report – CZQ VOR 10

Oils and lubricants N/A N/A N/A N/A N/A N/A

Potential Mercury-containing equipment

Equipment building Light tube Approx. 14 To be disposed of in an environmentally compliant manner

Dispose of in accordance with federal, state, and local regulations

Provide disposal documentation

Batteries E/G room Battery 18 To be removed by SSC prior to demolition

N/A N/A

Fuel Storage Tank North side of site plot Propane AST 500-gallon To be disposed of in an environmentally compliant manner

Dispose of in accordance with federal, state, and local regulations

Provide disposal documentation

Refrigerant R-22 (Freon) Hydrocholrofluoro-carbon (HCFC)

Main equipment room A/C units 2 To be disposed of in an environmentally compliant manner

Dispose of in accordance with federal, state, and local regulations

Provide disposal documentation

Building components containing potential Radioactive material.

N/A N/A N/A N/A N/A N/A

Charged-canisters associated with fire suppression systems

Main equipment and E/G rooms

Fire extinguisher

2 To be disposed of in an environmentally compliant manner

Dispose of in accordance with federal, state, and local regulations

Provide disposal documentation

Creosote N/A N/A N/A N/A N/A N/A

Site Survey Report – CZQ VOR 11

5.0 Proposed Scope of Work

5.1 FAA Action Required Prior to Site Demolition

1. FAA to remove from building all personal property and equipment including:

a. Dispose of 20 4-ft. fluorescent light tubes from inside the equipment building as mercury containing.

b. Dispose of remaining household cleaners, sprays, and lubricants in an environmentally compliant manner.

c. Remove engine generator unit (demo contractor could assist in accessing unit).

d. Remove 18 backup batteries from E/G room.

2. FAA utility coordinator to terminate electric power and request PG&E to remove transformer unit prior to demolition activities.

5.2 Environmental Removal and Disposal

1. Remove and dispose of 500-gallon propane AST and related fuel piping.

5.3 Demolition, Removal, and Disposal

1. Disconnect and remove any remaining power connections to the equipment building.

2. Remove remaining inventory in shelter (Section 2.0).

3. Demolish and dispose of the building, roof structure, and associated foundations:

a. Building – prefabricated fiberglass building, 10 ft. x 32 ft. x 10 ft.

b. Foundation – 12 concrete sonotube building footings (14 in. diameter x 3 ft.) and 1 concrete pad underneath E/G room (4 ft. x 8 ft. x 6 in.) with 6 additional concrete footings (14 in. diameter x 3 ft.).

c. Roof structure – wood-frame roofing structure with metal grate surface, 50 ft. diameter, 31 wood support poles (4 in. x 4 in. x 10 ft. tall), and 16 metal support poles (4 in. x 4 in. x 10 ft. tall).

d. Roof structure foundations: 31 wood support concrete footers (12 in. diameter x 3 ft.)

and 16 metal support concrete footers (12 in. diameter x 3 ft.).

e. Entrance foundations – Two 5 ft. 6 in. x 5 ft. 6 in. x 6 in. concrete pads with metal step grates.

4. Demolish and dispose of one monitoring pole in southeast corner of plot: 30 ft. tall tilt-down pole.

5. Demolish and dispose of one monitoring pole concrete foundation: 2 ft. diameter x 4 ft. deep

6. Demolish and dispose of one transformer concrete foundation: 5 ft. x 6 ft. 8 in. x 1 ft.

7. Demolish and dispose of 12 concrete-filled metal vehicle bollards, around transformer pad: 4

in. diameter x 4 ft. tall

8. Demolish and dispose of 12 bollard concrete foundations: 14 in diameter x 3 ft.

9. Demolish and dispose of one AST concrete foundation: 6 ft. x 11 ft. x 6 in.

10. Demolish and dispose of 10 concrete-filled metal vehicle bollards, around AST: 4 in. diameter x

Site Survey Report – CZQ VOR 12

2 ft. 8 in. tall

11. Demolish and dispose of 10 bollard concrete foundations: 12 in. diameter x 3 ft.

12. Remove associated grounding and wiring above and below (to a depth of 3 feet) ground.

13. Demolish and remove 45 former perimeter fence post foundations:

14. Demolish and remove 360 ft. of plastic perimeter fencing and 48 fence post concrete foundations.

5.4 Restoration (Full Restore)

1. Remove all foundations and structures to 3 ft. below grade and backfill/compact with suitable backfill material.

2. Remove all piping, cables, and conduit to 3 ft. below grade or where all vertical utilities transition to horizontal, whichever occurs first.

3. Remove all existing ground cover including the gravel plot and access road, other than topsoil.

Gravel can be removed and piled onsite without off-site disposal.

4. Spread fill to a uniform depth of approximately 0.5 ft. where existing ground cover, foundations, utilities, etc., were removed.

5.5 Notes

1. Roof-mounted VOR antenna will be reused by FAA. Demo contractor will be responsible for removing the full radome “teepee” (10 ft.-diameter base x 16 ft. tall) from the roof without damaging and placing it on FAA-supplied truck and trailer for transport, during demolition activities.

2. Demo contractor will assist FAA in removing the E/G from the building and onto an FAA-supplied truck for transport.

Avenue 9

Avenue 10

R o a d

R o a d

R o ll in g H il ls

D r

C h il d re n s B lv d

Avenue 9 Avenue 9 Aven ue 9

Avenue 10

R o a d /2

G oo dw in Way

R andall W ay

L a n e B rid g e D r

N Hi gh w ay

River Park Golf Center

Valley Childrens Hospital-Main

Campus

S an

Jo aq ui n R iv e r

Ch ild re ns

B lv d

Ave nu e

Av en ue

B la c k s to n e A v e

S ta te

R o u te

Cottonw o o d

Wildwood Ln

H ig h w a y

E Pe rri n R d

C h a m p a g n e L n

S ta te

R o u te

1 ¯0 0.2 0.4 0.6

Miles

Figure 1 Site Location

Site Survey Report

CZQ VOR

36.884322, -119.815140

Clovis, CA

U.S. Department of Transportation Volpe National Transportation Systems Center

April 2026

Spatial Reference:

NAD 1983 2011 UTM Zone 11N Upper Left: 810744.75E 13410502.71N ft

Sources: Microsoft, Vantor, Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c) OpenStreetMap contributors, and the GIS User Community, USGS The National Map: National Boundaries Dataset, 3DEP Elevation Program, Geographic Names Information System, National Hydrography Dataset, National Land Cover Database, National Structures Dataset, and National Transportation Dataset; USGS Global Ecosystems; U.S. Census Bureau TIGER/Line data; USFS Road data; Natural Earth Data; U.S. Department of State HIU; NOAA National Centers for Environmental Information. Data refreshed October 27, 2025-v2.1

0 30 60 Miles

Legend

CZQ VOR

0 50 10025 Feet

¯0 10 20 30 40 Feet

Figure 2 Site Layout

Site Survey Report

CZQ VOR

36.884322, -119.815140

Clovis, CA

U.S. Department of Transportation Volpe National Transportation Systems Center

April 2026

Spatial Reference:

NAD 1983 2011 UTM Zone 11N Upper Left: 817220.73E 13404715.13N ft

Sources: Microsoft, Vantor, Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c) OpenStreetMap contributors, and the GIS User Community

0 25 50 75 100 Feet

Legend

U.G. Fuel Line

U.G. Communications Line

U.G. Power Line

Roof/Radome Outline

Perimeter Fence

Access Road and Plot Outline

Meter Box

Roof Support Poles

Roof Support Poles

Gate

Access Gate

Building Outline

Tank

Foundation Pad

Vehicle Bollards

Foundation Footers

Entrance Pad

Transformer

Monitoring Pole

Appendix A

Site Photographs

Site Survey Report – CZQ VOR

1. Photo No: 1 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

5. Location: Clovis, CA

6. Description: View of CZQ VOR site plot and perimeter fence, facing west.

1. Photo No: 2 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of CZQ VOR gravel access road, facing east towards Road 40 ½.

1. Photo No: 3 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of CZQ VOR fence gate, facing west.

1. Photo No: 4 2. Facility CZQ VOR

6. Description: View of CZQ VOR building, facing west.

1. Photo No: 5 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of utility transformer and vehicle bollards, facing northwest.

1. Photo No: 6 2. Facility CZQ VOR

6. Description: View of transformer and vehicle bollards, facing north.

1. Photo No: 7 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of transformer and vehicle bollards, facing west.

1. Photo No: 8 2. Facility CZQ VOR

6. Description: View of transformer and vehicle bollards, with monitoring pole in background. Facing south.

1. Photo No: 9 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of transformer, facing southeast.

1. Photo No: 10 2. Facility CZQ VOR

6. Description: View of propane aboveground fuel storage tank (AST) and bollards, facing north.

1. Photo No: 11 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of AST and vehicle bollards, facing southwest.

1. Photo No: 12 2. Facility CZQ VOR

6. Description: View of AST, facing south.

1. Photo No: 13 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of AST and bollards, facing east.

1. Photo No: 14 2. Facility CZQ VOR

6. Description: View of AST fuel piping towards building and entering building, facing southeast.

1. Photo No: 15 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of CZQ VOR, facing southeast.

1. Photo No: 16 2. Facility CZQ VOR

6. Description: View of CZQ VOR and perimeter fencing, facing south.

1. Photo No: 17 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of perimeter fencing and former fence post foundations, facing south.

1. Photo No: 18 2. Facility CZQ VOR

6. Description: View of CZQ VOR, facing east.

1. Photo No: 19 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of CZQ VOR, facing northeast.

1. Photo No: 20 2. Facility CZQ VOR

6. Description: View of CZQ VOR roof supports, facing northeast.

1. Photo No: 21 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of roof and building concrete foundations, facing northeast.

1. Photo No: 22 2. Facility CZQ VOR

6. Description: View of roof concrete footer, building foundation steel framing, and engine generator pad.

1. Photo No: 23 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of CZQ VOR and roof supports, facing north.

1. Photo No: 24 2. Facility CZQ VOR

6. Description: View of CZQ VOR monitoring pole in southeast corner, facing south.

1. Photo No: 25 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of CZQ VOR monitoring pole foundation, facing south.

1. Photo No: 26 2. Facility CZQ VOR

6. Description: View of CZQ VOR site plot and adjacent building, facing west.

1. Photo No: 27 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of building entrances, facing south.

1. Photo No: 28 2. Facility CZQ VOR

6. Description: View of electric meter and roof support pole, facing west.

1. Photo No: 29 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of electric meter (PG&E: 1010280371).

1. Photo No: 30 2. Facility CZQ VOR

6. Description: View of CZQ VOR roof-top radome, facing south.

1. Photo No: 31 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View inside main equipment room.

1. Photo No: 32 2. Facility CZQ VOR

6. Description: View inside main equipment room.

1. Photo No: 33/34 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View inside main equipment room, south-wall.

1. Photo No: 35/36 2. Facility CZQ VOR

6. Description: View inside main equipment room, east-wall.

1. Photo No: 37 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View inside main equipment room, north and west walls.

1. Photo No: 38 2. Facility CZQ VOR

6. Description: View inside main equipment room, west wall.

1. Photo No: 39 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View inside engine generator (E/G) room.

1. Photo No: 40 2. Facility CZQ VOR

6. Description: View inside E/G room.

1. Photo No: 41 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

1. Photo No: 42 2. Facility CZQ VOR

6. Description: View of battery rack, inside E/G room.

1. Photo No: 43 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of batteries, inside E/G room.

1. Photo No: 44 2. Facility CZQ VOR

1. Photo No: 45/46 2. Facility CZQ VOR

3. Date: 4/13/2026 4. Photographer: E. Starr

6. Description: View of E/G, piping, and base.

1. Photo No: 47/48 2. Facility CZQ VOR

Appendix B

Asbestos Inspection Survey

Leon Environmental Services Tommy Leon CAC # 05-3882

4545 N. Brawley Ave., Suite 104, Fresno, CA 93722

Phone: 559.274.9200 Fax: 559.274.9240 Email: LeonEnviro@leonenviro.com

April 16, 2026

Evan Starr US Dept. of Transportation 220 Binney St.

Cambridge, MA 02142

Re: Asbestos Survey Demo Building – Clovis VOR (CZQ VOR)

36.884322 – 119.825140 Madera, CA Job No. S54-26

Dear Evan:

Attached is the asbestos survey report for the above referenced building. This report includes inspection observations, a list of all samples taken, bulk sample analysis results, a sample location drawing, and recommendations concerning asbestos containing materials.

If you have any questions or need additional information, please do not hesitate to call.

Thank you for using Leon Environmental Services. We look forward to working with you in the future.

Respectfully, Thomas Leon Certified Asbestos Consultant Certification No. 05-3882

Asbestos Survey: Demo of a FAA VOR Facility,

36.884322 – 119.825140, Madera, CA S54-26

BUILDING DESCRIPTION

An asbestos survey was performed on April 13, 2026, at 36.884322 – 119.825140, Fresno, CA. The building is approximately 30-40 years old and approximately 396sqft.

It has a wood frame, Fiberglass siding and roof. The interior walls and ceilings are wood and texture / coating and fiberglass. The floor is wood covered with floor tile and carpet.

Also there is wood and metal roof screen that surrounds the building.

At the time of the survey the building was unmanned FAA VOR Facility.

ASBESTOS ANALYSIS RESULTS

All bulk samples of suspect asbestos containing materials were taken in accordance with US EPA Guidelines and accepted industry standards by a state certified asbestos consultant. McCall and Spero Environmental, Inc., a NVLAP accredited laboratory performed a total of 19 analyses from 18 samples collected from this structure at this site. The samples listed on the table below were negative for asbestos. The full list of all samples taken is on the following pages. Sample locations are indicated on the drawings included with this report.

Sample Location Material % Of

ACM

Friable Sq.

Ft.

01 EG Room – Floor

12x12 Floor Tile ND

Adhesive ND

Main Equipment Room

Floor Carpet Glue ND

03,04 EG Room, Main Equipment Room Wall

Base Cove Mastic ND

05, 06,07

EG Room North, West, East

Wall

Texture/Coating on Wood

ND

Main Equipment Room

Ceiling Fiberglass Panel ND

09 EG Room – Door Vent Sealant ND

EG Room – Pipe

Insulation White Mastic ND

11 EG Room – Ceiling Sealant ND

12 East Exterior – Wall Fiberglass Panel ND

13,14 Exterior – AC Unit, North Vent Sealant ND

15,16 Roof Sealant ND

17,18 Foundation – Pillar, Front Steps Concrete ND

* Determined after composite sampling with associated sheetrock

NS – Not Sampled

COMMENTS AND RECOMMENDATIONS

All samples of suspect materials from this site were negative for asbestos.

CONCLUSIONS AND REGULATIONS

US EPA NESHAP (40 CFR Part 61)

Based on our survey, sampling and subsequent laboratory analysis and regulatory guidelines affecting this site, the types of ACM identified on the previous page require removal (in most cases) prior to demolition and/or renovation procedures to comply with local, state and federal agencies. The US EPA NESHAP (40 CFR Part 61 – November 20, 1990) requires materials containing greater than one percent asbestos be removed prior to renovation or demolition. If those materials are friable or likely to become friable due to the forces expected to act upon them during renovation or demolition, they become a regulated asbestos containing material (RACM) and require a 10-day notification to the local Air Pollution Control District prior to abatement.

Non-friable and non-regulated ACM, in most cases, may be disposed of as a Non- Hazardous waste in a landfill that accepts Asbestos Containing Materials. All friable waste containing more than 1% asbestos (RACM) must be manifested as hazardous waste for disposal purposes.

CAL OSHA--------Construction Industry--------8CCR, 1529

Cal/OSHA worker health and safety regulations apply during any disturbance of ACM by a person while in the employ of another. This is true regardless of friability or quantity disturbed. If there is greater than 100 square feet of ACM which will be affected by the demolition, a California Licensed Contractor who is registered with Cal/OSHA for asbestos is required. The regulations regarding asbestos are found in Title 8 CCR Section 1529, and also include formal notification requirements to Cal/OSHA at least 24 hours prior to removal. It is required that removal be conducted with the material kept in a wetted state to contain dust and hazardous emissions.

The construction industry standard covers employees engaged in demolition and construction, and the following related activities likely to involve asbestos exposure:

removal, encapsulation, alteration, repair, maintenance, insulation, spill emergency cleanup, transportation, disposal and storage of ACM.

Demolition contractors typically require that a building owner/operator accept responsibility for removal of all ACM found during the building inspection prior to start of demolition activities.

LIMITATIONS OF LIABILITY

Conclusions and recommendations presented in this report are qualitative judgments based on the prevailing regulations and accepted industry standards at the time of the report issuance. Leon Environmental Services provides no other guarantees, either expressed or implied. All quantities of materials listed herein are estimates for sampling purposes only, and should be verified by Owner representative or an abatement contractor prior to asbestos abatement.

The nature of demolition and asbestos abatement is such that materials can be uncovered which previously were unknown to exist. Therefore, Leon Environmental Services cannot be responsible for materials not previously detected due to lack of accessibility or concealment, although every effort was made during the inspection to detect all suspect materials. If any materials other than those included herein are discovered during renovation or demolition, it must be assumed that the materials are asbestos containing, and should be treated accordingly until further testing and analysis is performed.

The data interpretations and recommendations are based solely on information available to Leon Environmental Services at the time of our inspection. The customer recognizes that site conditions or accessibility may vary, from those encountered at the time of our inspection and sample collection. Varying conditions or access could result in additional information that would lead us to revise conclusions and recommendations. Leon Environmental Services will not be responsible for the interpretation or use by others of information contained within this report.

Thomas Leon DATE:

Certified Asbestos Consultant Certification No. 05-3882

*Abbreviation Key:

Asbestos Containing Material — ACM (equal to or greater than 0.1% by weight) Vinyl Asbestos Tile – VAT No Asbestos Detected--N.A.D or N.D.

Homogeneous—H Not Sampled--NS

Tommy Leon CAC Certification No. 05-3882

Job S54-26 Sample Location Diagram

Demo Building – Clovis VOR (CZQ VOR) / 36.884322 – 119.825140 (05 miles west of Valley Children’s

Evan Starr / US Dept of Transportation

Drawing not to Scale

N X = Interior Samples

Y = Exterior Samples

R = Roof Samples

Y 17

Y

05 X

X

X

X

X

X

X Y Y

EG Room

Main Equipment Room

Y 12

X 02

X 07

X

R 15

R 16

X 01 mailto:LeonEnviro@leonenviro.com

Tommy Leon CAC Certification No. 05-3882

Job S54-26 Sample Location Diagram

Demo Building – Clovis VOR (CZQ VOR) / 36.884322 – 119.825140 (05 miles west of Valley Children’s

Evan Starr / US Dept of Transportation

Drawing not to Scale

N X = Interior Samples

Y = Exterior Samples

R = Roof Samples

Ave 9

R D

½

R D

½ mailto:LeonEnviro@leonenviro.com

Appendix C

Property Lease Drawings

Contents
Executive Summary
1.0 Participants and Safety Information
2.0 Site Description
3.0 Utility Disposition
3.1 Demolition Disconnect Sketch
4.0 Hazardous Materials
5.0 Proposed Scope of Work
5.1 FAA Action Required Prior to Site Demolition
5.2 Environmental Removal and Disposal
5.3 Demolition, Removal, and Disposal
5.4 Restoration (Full Restore)
5.5 Notes
Figure 1 - Site Locations
Figure 2 - Site Layout
Appendix A - Site Photographs
Appendix B - Asbestos Inspection Survey
S54-26 Report TL
S54-26 Diagram - JR
S54-26 Diagram Overview - TL
P4146LEO.1

Appendix C - Property Lease Drawings

File details come from the government source that posted it. Updated .