Demolish Abandoned Bldg#930, #942, #947 & #1012, Osan AB (MATOC Work Plan)
Closed Solicitation Posted
- Solicitation number
- W90VN6-24-R-0017
- Agency
-
Army Contracting Command
Army Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- P400 Salvage- Demolition Of Buildings
- Place of performance
- Osan AB Gyeonggi Korea, South
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Army Contracting Command is seeking proposals for a task order under a Multiple Award Task Order Contract (MATOC) to demolish four abandoned buildings and perform associated civil site work at Osan Air Base in South Korea. The contractor shall provide all labor, equipment, and materials necessary to accomplish the scope of work, which includes demolishing buildings 930, 942, 947, and 1012, constructing a gravel parking lot and retaining wall, widening an existing road, and restoring site landscaping. Evaluation criteria include the adequacy of the design data submittal, pricing, detailed cost breakdown, and compliance with tax requirements and other representations and certifications. The solicitation has a closing date of July 5, 2024, and the work must be completed within 300 calendar days of contract award.
This opportunity is not set-aside. The contractor must submit a price proposal, offer breakdown, and 30% conceptual design drawings with their proposal, and will be required to provide a final 100% design package within 30 days of contract award. The government will take full ownership of the construction drawings. The NAICS code is 236220 - Commercial and Institutional Building Construction, and the PSC is P400 - Salvage-Demolition of Buildings. The place of performance is Jangdeung-ri, Seotan-myeon, Pyeongtaek-si, Gyeonggi-do, South Korea.
Notice text
- GENERAL: The work to be performed for completion of this project shall be as described in general below.
-
- The contractor shall provide all labor, tools, equipment, supplies, and any other resources necessary to accomplish the scope of work contained herein and as included in the drawings and specifications.
-
- All work shall be completed IAW specifications and standards referenced in section 3 and drawings associated with this project.
-
- Contract Type: This project is an individual Work Plan Task Order under the Multiple Award Task Order Contract (MATOC) issued by the 411th CSB, Korea. The task order proposal submission requirements are as below. Unless otherwise specified in the Task Order RFP, the Contractor shall provide the following in response to a task order RFP.
-
-
- Price Proposal
-
-
-
- Offer Breakdown: The quantity of all materials and labors in the offer breakdown shall be prepared based on the contract drawing and manufacturer’s technical datasheet with materials coverage rates provided by manufacturer.
-
-
-
- Government provides 30% of concept design for the contract and contractor will accomplish and submit 100% design. Following design data and drawings shall be submitted pre-award (Technical Evaluation Purpose) and post-award (100% design submittal).
-
-
-
-
- Required conceptual drawings for technical evaluation purpose (Pre-award proposal)
-
-
- Site plan/Removal/Demolition plan
- Profile and section detail drawings for reinforced retaining wall (B930 & B1012)
- Earth shoring plan
- Grading plan for B1012
- Gravel parking lot plan for B930
- Section for road widening for B930
-
-
-
- Required final drawings after contract award (Post-award submittal)
-
-
- Site plan/Removal/Demolition plan
- Profile and section detail drawings for reinforced retaining wall (B930 & B1012)
- Earth shoring plan
- Grading plan for B1012
- Gravel parking lot plan for B930
- Section for road widening for B930
- Details for concrete stairway, handrail for B1012
- Details for storm drainage for B1012
- Construction, contraction, expansion joint plans for retaining walls
-
- Final drawing package submittal including details and plans of each project areas shall be submitted within 30 days after pre-construction meeting.
-
- Ownership of Construction Drawings: The Government shall take full ownership of the drawings submitted with the proposal and after contract award.
Files
| File | Type | Posted |
|---|---|---|
| Submittal Register.pdf | ||
| W90VN6-24-R-0017.pdf | ||
| Project Drawings.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Active vehicle barriers and associated control system at osan air base | Army Contracting Command | No set-aside | |
| ICD-705 Controlled Spaces Modernization and Sustainment Program - (Progressive Design-build (PDB) Other Transaction Agreement (OTA) | ENDIST Far East | No set-aside | |
| Propane Gas Delivery to Osan Air Base | Army Contracting Command | No set-aside | |
| Total Maintenance Service Contracts with Multiple Award Task Order Contracts | Army Contracting Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity