Submittal Register.pdf

PDF 9 KB Posted

Attached to
Demolish Abandoned Bldg#930, #942, #947 & #1012, Osan AB (MATOC Work Plan)
Solicitation number
W90VN6-24-R-0017
Issued by

About this file

This document is a Submittal Register for a federal contract opportunity titled "Demolish Abandoned Bldg#930, #942, #947 & #1012, Osan AB (MATOC Work Plan)". The contract opportunity is a Task Order under a Multiple Award Task Order Contract (MATOC) issued by the 411th Contracting Support Brigade, Korea. The work includes demolishing four abandoned buildings and associated site work at Osan Air Base. The contractor will be required to submit various preconstruction submittals such as safety plans, construction schedules, quality control plans, and site plans. Shop drawings, product data, test reports, and closeout submittals are also required. The Government will take full ownership of the construction drawings submitted by the contractor. The contractor must provide a price proposal breakdown based on the contract drawings and manufacturer's technical data. The final drawing package is due within 30 days after the pre-construction meeting.

View the file

Other files

File Type Posted
Project Drawings.pdf PDF
W90VN6-24-R-0017.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Line

Acti vity #

Trans-mittal #

Specification

Section SD # Submittal Description Item Submitted Paragraph #

Classificati on: GOVT or A/E

Revwr Submit Approval

Needed By

Material

Needed By

Action

Code

Date Of

Action

Date FWD to APPR /

Auth Date

RCD From

CONTR

Date FWD

To

Other

Revwr

Date RCD

From Other

Revwr

Action

Code

Date Of

Action

Mailed To

CONTR/

Date RCD

From

APPR

Authority

Remarks

1 01 30 00 01 Preconstruction Submittals Progress and completion pictures 1.5

2 01 32 01.00 10 01 Preconstruction Submittals Preliminary Project Schedule 3.4.1 G

3 01 32 01.00 10 01 Preconstruction Submittals Initial Project Schedule 3.4.2 G

4 01 32 01.00 10 01 Preconstruction Submittals Periodic Schedule Updates 3.4.3 G

5 01 32 01.00 10 01 Preconstruction Submittals Schedule Status Report 3.1.2 G

6 01 33 00 01 Preconstruction Submittals Submittal register 1.8 G

7 01 35 26 01 Preconstruction Submittals SAFETY PLAN /ACCIDENT

PREVENTION PLAN (APP)

1.6

8 01 35 26 01 Preconstruction Submittals Activity Hazard Analysis (AHA) 1.7

9 01 35 26 01 Preconstruction Submittals Crane Critical Lift Plan 1.6.1

10 01 35 26 01 Preconstruction Submittals Crane Operators 1.5.1.2

11 01 45 00.00 10 01 Preconstruction Submittals Quality Control Plan 3.2 G

12 33 82 00 07 Certificates Key Personnel Resume 1.6.2.2 G

13 01 50 00 01 Preconstruction Submittals Construction site plan 1.4 G

14 01 50 00 01 Preconstruction Submittals Traffic control plan 3.4.1 G

15 01 57 20.00 10 01 Preconstruction Submittals Environmental Protection Plan 1.7 G

16 01 58 00 02 Shop Drawings Construction Project Sign 1.2.1 G

17 01 74 19 01 Preconstruction Submittals Waste Management Plan 1.6 G

18 02 65 00 01 Preconstruction Submittals Work Plan 1.4.4 G

19 31 00 00 01 Preconstruction Submittals Shoring 3.5 G

20 02 82 14.00 10 02 Shop Drawings Detailed Drawings 1.3 G

21 03 11 13.00 10 03 Product Data Design 1.2

22 02 65 00 06 Test Reports Backfill Material 2.1 G

23 03 20 00.00 10 07 Certificates Reinforcing Steel 2.3 G

24 03 30 00 02 Shop Drawings Fabrication Drawings 1.6.2.1

25 03 30 00 03 Product Data Ready-Mix Concrete 2.3.2 G

26 03 30 00 05 Design Data Concrete mix design 1.6.4.1 G

27 03 30 00 06 Test Reports Compressive strength tests 3.12.2.3

28 03 30 00 06 Test Reports Air Content 3.12.2.4

29 03 30 00 06 Test Reports Slump Tests 3.12.2.1

30 32 12 15.13 07 Certificates Asphalt Cement Binder 2.2 G

31 02 61 13 06 Test Reports Backfill 2.2 G

32 32 11 24 06 Test Reports Aggregates 2.1.1 G

33 01 74 19 11 Closeout Submittals Records 1.7

34 01 78 00 03 Product Data Equipment-in-Place List 1.3.4

35 01 78 00 11 Closeout Submittals Checklist for Form DD1354 1.9 G

36 02 41 00 01 Preconstruction Submittals Existing Conditions 1.11 G

37 02 41 00 11 Closeout Submittals Receipt of Disposal 1.6 G

38 02 41 00 07 Certificates Demolition Plan 1.2.1 G

39 02 41 00 07 Certificates Deconstruction Plan 1.2.1 G

TITLE: SMYU21-1113 Demo Abandoned B930, 942, 947 & 1012

CONTRACTOR SCHEDULE DATES

SUBMITTAL REGISTERJ

L

O

OSAN AB

CONTRA

CONTRA

CONTRACTOR

ACTION

APPROVING AUTHORITY

(d)

File details come from the government source that posted it. Updated .