Cyclic maintenance of water cisterns at dry tortug

Closed Solicitation Posted

Solicitation number
140P5426R0017
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The National Park Service Southeast Region seeks cyclic maintenance of water cisterns at Dry Tortugas National Park, with proposals due August 10, 2026, extended from the original August 5 deadline. The procurement is a Total Small Business set-aside, foreclosing bidders outside that category.

Place of performance is Dry Tortugas National Park, approximately 70 miles west of Key West, Florida. The contract period runs from September 14 through November 13, 2026, with a mandatory 10-calendar-day notice to proceed and 60-calendar-day completion timeline. The project includes removal and disposal of roots, vegetation, and debris from interior cistern cells; application of waterproof cement coating (Thoroseal or approved equal, NSF Standard 61 listed for potable water) to approximately 11,682 square feet of interior walls and 365 square feet of below-grade exterior walls; repair of approximately 1,065 square feet of parge coat using American Natural Cement; application of three coats of lime wash to approximately 4,646 square feet of exposed exterior surfaces; and removal and installation of a new 6-inch K-Style copper gutter system with copper flashing. The cistern is divided into three sections with only one section out of service at a time, maintaining water service interruptions under two hours. Contractor personnel must hold confined space entry training and certification; the cistern calls are designated as permit-required confined spaces under 29 CFR 1910.146, and a site-specific confined space entry plan is required. Davis-Bacon prevailing wages apply in Monroe County, Florida.

The project magnitude is between $250,000 and $500,000 as a firm fixed price construction contract. Award value and ceiling are not specified. Evaluation weighs technical approach and past performance and experience significantly more important than cost. An organized site visit is scheduled for July 9 at 10:45 a.m. ET, requiring attendance confirmation by July 8. A 20% bid guarantee is required at submission; the successful contractor must furnish performance and payment bonds at 100% each. Offerors must submit SF-1442 forms, technical proposals not exceeding 20 pages, capabilities and experience documentation, subcontractor information, and at least three past performance questionnaires reflecting similar project magnitude and remote geographic experience.

Notice text

2 versions

Update #2 · Latest ·

The purpose of this amendment to the solicitation is to attach the Questions and Answers document and to extend the proposal due date to Monday, August 10 at 1:00 PM ET. All other terms and conditions remain the same.

Update #1 ·

CYCLIC MAINTENANCE OF WATER CISTERNS AT DRY TORTUGAS NATIONAL PARK

Files

File Type Posted
Sol_140P5426R0017_Amd_0001.pdf PDF
Questions_and_Answers_0001.pdf PDF
Sol_140P5426R0017.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Wage_Determination.pdf PDF
Statement_of_Work.pdf PDF
Drawings.pdf PDF

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Cyclic maintenance of water cisterns at dry tortugas national park Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
HAVO 326181 Rehabilitate Rainshed&Water Treatment NAICS 237110 National Office No set-aside
Timucuan Ecological and Historic Preserve TIMU-335 NAICS 237990 National Office No set-aside
JELA 325250 335621 - Rehabilitate Cemetery NAICS 237990 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors