CT switchgear replacement stampede PP

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140R2026R0007
Agency
Bureau of Reclamation Department of the Interior
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
PSC
Z2MZ Repair Or Alteration Of Epg Facilities - Other, Including Transmission
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Bureau of Reclamation seeks removal and replacement of switchgear and distribution panels at Stampede Powerplant, with proposals due July 13, 2026, at 5:00 p.m. PST. This is a total small business set-aside under FAR 52.219-6, restricting competition to small business concerns.

Place of performance is Stampede Dam and Powerplant, 501 Stampede Dam Road, Truckee, California. The work involves removal of three existing switchgear enclosures and distribution panels (DCA draw-out breaker enclosure, DCB molded case circuit breaker distribution panel, and panels D1A and DCC) and installation, testing, and commissioning of new arc-resistant switchgear and molded case breaker panels. The existing equipment is Brown Boveri Electric, Inc. switchgear manufactured in 1984. Contractors must provide their own mobile generators and restroom facilities during the scheduled outage and hold current and valid business license(s) applicable to electrical construction work. Davis-Bacon wage rates apply.

The contract period runs 270 calendar days after notice to proceed, with work commencing within 7 calendar days of the notice. The estimated price range is $250,000 to $500,000. Performance and payment bonds are required, due within 10 calendar days after award. The procurement is firm-fixed price under FAR Part 15. NAICS code is 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a small business size standard of $19 million. An organized site visit was held June 9, 2026, at Stampede Powerplant. Evaluation includes Subfactor 1B (Construction Schedule), requiring contractors to demonstrate completion within the 270-day period through detailed activity durations. Inquiries are directed to Marianna Mezentseva at 916-978-5211. A post-award conference will be conducted via MS Teams.

Notice text

3 versions

Update #3 · Latest ·

The purpose of this amendment is to extend the proposal due date to July 13, 2026, at 5:00 p.m. PST and to notify offerors that proposals shall be submitted in accordance with Section L requirements.

Update #2 ·

The purpose of this amendment is to incorporate the attached site visit agenda and sign in sheet.

Update #1 ·

Stampede Power Plant Switchgear Replacement

Attachments

Files attached to this notice, newest first
File Type Posted
Amendment_0003_to_140R2026R0007_0003.pdf PDF
Sol_140R2026R0007_Amd_0003.pdf PDF
Sol_140R2026R0007_Amd_0002.pdf PDF
Amendment_0002_to_140R2026R0007_0002.pdf PDF
Amendment_0001_to_140R2026R0007_0001.pdf PDF
Sol_140R2026R0007_Amd_0001.pdf PDF
C05_04_Solicitation_140R2026R0007_FINAL_5_28_26.pdf PDF
Sol_140R2026R0007.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Stampede Power Plant Switchgear Replacement Award Award Notice
CT switchgear replacement stampede PP This notice · Latest solicitation Solicitation
CT switchgear replacement stampede power plant Pre-Solicitation
CT switchgear replacement stampede PP Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity